LC Paper No. CB(1)235/17-18(04) -1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No. 7804CL – Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works PURPOSE This paper briefs Members on the proposal to upgrade Public Works Programme Item No. 7804CL “Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works” (the Project) to Category A, at an estimated cost of $697 million in money-of-the-day (MOD) prices, for the construction of infrastructure to support the housing developments at Kam Tin South. PROJECT SCOPE AND NATURE 2. 7804CL which we propose to upgrade to Category A comprises — (a) widening of a section of about 970 metres (m) long of Kam Ho Road between Kam Tin Road and Tung Wui Road from a single two-lane carriageway to a dual two-lane carriageway, including construction of a bridge of about 95 m long across Kam Tin River; (b) widening of a section of about 360 m long of eastbound Kam Tin Road between Ko Po Tsuen and Kam Ho Road from a two-lane to three-lane carriageway; (c) provision of four bus laybys along Kam Sheung Road;

Transcript of LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For...

Page 1: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

LC Paper No. CB(1)235/17-18(04)

-1-

For discussion on 28 November 2017

LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT

PWP Item No. 7804CL –

Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works

PURPOSE This paper briefs Members on the proposal to upgrade Public Works Programme Item No. 7804CL “Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works” (the Project) to Category A, at an estimated cost of $697 million in money-of-the-day (MOD) prices, for the construction of infrastructure to support the housing developments at Kam Tin South. PROJECT SCOPE AND NATURE 2. 7804CL which we propose to upgrade to Category A comprises —

(a) widening of a section of about 970 metres (m) long of Kam Ho Road between Kam Tin Road and Tung Wui Road from a single two-lane carriageway to a dual two-lane carriageway, including construction of a bridge of about 95 m long across Kam Tin River;

(b) widening of a section of about 360 m long of eastbound Kam Tin Road between Ko Po Tsuen and Kam Ho Road from a two-lane to three-lane carriageway;

(c) provision of four bus laybys along Kam Sheung Road;

Page 2: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

-2-

(d) construction of sewers along Tung Wui Road, Kam Ho Road and Kam Tai Road;

(e) road junction improvement at Kam Tin Road/Kam Tin Bypass/Kam Ho Road, Kam Tin Road/Kam Sheung Road, Kam Ho Road/Tung Wui Road, Tung Wui Road/Kam Sheung Road, Pat Heung Road/Kam Sheung Road and Tsing Long Highway Slip Road/Pat Heung Road junctions;

(f) ancillary works including geotechnical, drainage, water supply,

landscaping and other miscellaneous re-provisioning works; and

(g) implementation of environmental mitigation measures including construction of noise barriers at Kam Tin Road and re-provisioning of wetland near the junction of Chi Ho Road and Shui Tau Road for the works mentioned in 2(a) to (f) above.

3. A location plan and a layout plan of the proposed works, and an artist impression drawing of the bridge across Kam Tin River are at Enclosures 1 to 3 respectively. 4. Subject to the funding approval of the Finance Committee (FC), we plan to commence the proposed works in mid 2018 for completion in end 2021. JUSTIFICATION 5. To meet housing and other development needs, the Government adopts a multi-pronged strategy to increase land supply in the short, medium and long term. Kam Tin South is one of the areas contributing to the increase in housing land supply. To support three proposed public housing sites1 and two West Rail property development projects 2 in Kam Tin South, it is necessary to carry out the proposed road works to cater for the increase in

1 The proposed Sites 1, 4a and 6 are currently undergoing rezoning procedures. The projected

yields for the three sites are 3 700, 3 750 and 1 550 flats respectively. 2 Planned projects at West Rail Kam Sheung Road Station and Pat Heung Maintenance Depot have

projected yields of around 2 690 and 6 060 flats respectively.

Page 3: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

-3-

traffic demand arising from the housing developments. The proposed road works can also help address the existing demand for improving the traffic condition of Kam Sheung Road.

6. There is no public sewerage system serving the proposed housing developments in Kam Tin South. The proposed sewerage, which will be connected to the existing Kam Tin Sewage Pumping Station, is required to provide proper and hygienic means to dispose of the sewage generated from the developments.

7. Currently, West Rail Kam Sheung Road Station (KSRS), MTR Kam Tin Building and Pat Heung Maintenance Centre are served by an on-site makeshift sewage storage facility which occupies part of the residential development site at KSRS. It is necessary to commence the proposed sewerage works in mid 2018 for completion in end 2021 so that the makeshift sewage storage facility can be demolished by 2021 to make way for the construction of residential building thereat. Early commencement of the proposed works would also enable the local community to benefit from the proposed road improvement earlier. FINANCIAL IMPLICATIONS 8. We estimate the capital cost of the Project to be $697 million in MOD prices. PUBLIC CONSULTATION 9. We consulted the Kam Tin Rural Committee (KTRC) and the Pat Heung Rural Committee (PHRC) on 8 March 2016 and 9 March 2016 respectively. KTRC offered in-principle support for the Project, and requested the Government to follow up on a number of issues, including constructing new road(s) connecting KSRS and Route 3 in the long run and implementing the sewerage works on Kam Tin Road at the same time. PHRC indicated no objection to the proposed works, and requested the Government to widen Kam Sheung Road, construct new road(s) and bicycle tracks, and increase parking spaces in the park-and-ride facility and bicycle parking spaces

Page 4: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

-4-

at the KSRS property development project. 10. We also consulted the Traffic and Transport Committee (T&TC) of Yuen Long District Council (YLDC) on 10 March 2016. A motion was passed by the YLDC T&TC requesting the Government to commit long-term traffic improvement proposal, including the widening of the entire Kam Sheung Road and the provision of new roads linking Kam Tin Road and Kam Sheung Road, to resolve the traffic problem of Kam Sheung Road; otherwise, YLDC T&TC would object to the Project. To address these concerns, the Government wrote to the YLDC T&TC on 10 May 2016 committing to carry out a number of traffic improvement measures and a feasibility study to review the road infrastructure in respect of the developments in Kam Tin South, which includes the long-term improvement of Kam Sheung Road. The YLDC T&TC noted the positive response from the Government.

11. We gazetted the proposed road works under the Roads (Works, Use and Compensation) Ordinance (Cap. 370) and the proposed sewerage works under Cap. 370 as applied by the Water Pollution Control (Sewerage) Regulation (Cap. 358AL) on 24 March 2016 and 1 April 2016. During the statutory objection period, 233 and 15 objections to the proposed road scheme and sewerage works were received respectively. Five objections to the proposed road scheme were resolved, while others which were mainly related to the requested widening of the entire Kam Sheung Road remained unresolved. On 1 November 2016, the Chief Executive-in-Council overruled the remaining unresolved objections and authorised the proposed road works (with modification) and the sewerage works, of which the notices of authorisation were gazetted on 25 November 2016 and 2 December 2016. ENVIRONMENTAL IMPLICATIONS 12. The Project is not a designated project under the Environmental Impact Assessment (EIA) Ordinance (Cap. 499). We have completed the Preliminary Environmental Review which concluded that the Project would not cause adverse environmental impact with the implementation of mitigation 3 A total of 24 objection letters were received. Among them, two objection letters expressing the

same concerns and requests submitted by the same person were considered as one objection. Hence, altogether there were 23 objections.

Page 5: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

-5-

measures. These measures include wetland re-provisioning, the use of noise barriers and low noise road surfacing where practicable. For the proposed works within the main drainage channel at Kam Tin, as the drainage channel concerned is a designated project with a valid environmental permit, we will ensure the environmental acceptability of the proposed works and compliance with the statutory requirements under the EIA Ordinance. During the construction stage, the Civil Engineering and Development Department will implement suitable pollution control measures to control the short-term environmental impact to within established standards and guidelines. HERITAGE IMPLICATIONS 13. The Project will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites or buildings, sites of archaeological interest and government historic sites identified by the Antiquities and Monuments Office. TRAFFIC IMPLICATIONS 14. The traffic impact assessment conducted reveals that the proposed road works will smoothen the existing traffic of Kam Sheung Road and also alleviate the traffic impact of the proposed housing developments to nearby roads. To minimise disturbance to the traffic during the construction of the Project, we will maintain the existing number of traffic lanes along the affected roads as far as practicable. In addition, we will establish a Traffic Management Liaison Group and closely liaise with the Transport Department, the Hong Kong Police Force and other stakeholders to discuss, scrutinise and review the proposed temporary traffic arrangements with a view to minimising the traffic impact arising from the construction of the Project. LAND ACQUISITION 15. The area to be resumed under the Project is 951 square metres (m2) and involves seven private lots. The area of government land required is 126 000 m2 and 19 temporary structures on private and government land will

Page 6: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

-6-

be cleared. No clearance of domestic structures is required. The estimated cost of land resumption and clearance is about $5.94 million and will be charged to Head 701 – Land Acquisition. BACKGROUND 16. We upgraded 7804CL to Category B in September 2016. 17. We engaged consultants to carry out investigation and detailed design for the Project in November 2014, funded by Subhead B100HX “Minor housing development related works, studies and investigations for items in Category D of the Public Works Programme”. We have substantially completed the detailed design of the Project. WAY FORWARD 18. We plan to seek support from the Public Works Subcommittee for full upgrading of 7804CL to Category A in end 2017/early 2018 before seeking funding approval from FC. We will consider inviting tenders in parallel to facilitate commencement of the Project in mid 2018 for completion in end 2021. We will only award the contract after obtaining FC’s funding approval.

Development Bureau Civil Engineering and Development Department November 2017

Page 7: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

R:\Drawing-NTWST-Z\NTWST-Z0270\NTWST-Z0270.dgn A3 297MM X 420MM21/11/2017

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!!

!

!

!

!

*

*

*

*

s

A

A

A

5

|

|

|

|

| |

|

||

|

|

|

|

|

|

¢

A

g

g

g

\

\ \

\

S

S

:

:

:

:

¡

]

5

[

[[

[

[

[

[

[

[

[

[

[

[

[

[

[

[

[

[

k

3

\

\ \

鐵西

場廣費收道隧

路上

eni

L li

aR t

se

W

yawn

uR

azalP lloT

D

AO

R G

NU

EH

S M

AK

A6

道跑

道大邊湖

大奧

維艾

道繞田錦

道大

拉維

街市

田錦

路泰錦

大江

場機

崗石

路北

水金

埔高

南水

河錦

鄉八

大元

道大林園

路頭

路鄉八

路莆錦

路河治

賽馬

道大

巒翠

路泰錦

上錦

路公田錦

泰錦

路慶

大諾

提利

路河

道大

娜茵

田石

河錦

河錦

上錦

場機

崗石

地波

路石錦

莆錦

徑遊

郊涌

欖大

徑遊

郊涌

欖大

DAOR IAT

NE

UY

DAOR GNUEH TAP

DAOR OH IHC

DA

OR

KE

HS

MA

K

DA

OR

OP

OK

DA

OR

OH

MA

K

DR

UA

T IU

HS

EUNEVA EDISLLIH

DA

OR

GN

UE

HS

MA

K

DR

NIT

KE

HS

D

R IE

T O

P

SSAP

YB

NIT

MAK

DR

HTRO

N IU

HS MAK

DA

OR

OP

MA

K

D

AO

R

OP

MA

K

DR

GN

UE

HS

MA

K

DAOR IAT MAK

DAOR IAT MAK

TS I

HS

NIT

MA

K

DAOR HTUOS IUHS MAK

SHEK KONG AIRFIELD RD

D

AO

R IU

HS

MA

K

DA

OR NI

T MAK

D

R O

H G

NIY

D

AO

R

OP

MA

K

EUNEVA KRAP

DAOR IA

T GNOK

D

AO

R

OH

MA

KD

R I

UW

MA

K

DAOR NIT MAK

DAO

R IU

W G

NU

T

LIA

RT

YR

TN

UO

C G

NU

HC

MA

L IAT

嶺瓦缸

司公限有業籐昌萬

廠水濾頭凹

廠理處水污

廠車

鄉八

鐵港

GNEL A GNOK

skroW

tnemtaerT

egaweS

t

op

eD

gn

ue

H t

aP

RT

M

dtL KH oC

nattaR gnohC naM

skroW tnemtaerT retaW uaT uA

neusT

gnoH iaT

oP gnuehC

iaWgniH taK

neusTgnoK gnuehC

neusT naS

gnoK neuY

gnoT uW kehS

neusT naS

maS niT

gnoK nO aM

oW iaT

neusTgnoT zsT

iaWgniH maK

neusT aK gN

iaW gnuL gniW

iaW aH gnoK

neusT naSoP oK

neusT oP oK aH

gnoK neuY

keK iaT

neusTmaS niT

neusT uaT uiK

neusT naS

nuM gnihS niT maK neusT oP oK

neusT aK gnaP

iaW nisT maK

ihS niT maK

iaW

gnoH iaT

uaT iuhS

neusT naS

gnoK kehS

莆長

村新崗石

頭水

乪大

崗鞍馬

村家吳

圍夏江

村家彭

市田錦

村塘祠

村埔高

村江長

村新門城

田錦

村頭橋

村新埔高

圍錢金

塘湖石

圍慶錦

圍康泰

圍慶吉

圍隆永

村康泰

村心田

村新心田

窩大

村新崗元

村埔高下

崗元

河田錦

河田

庫水配主

水食頭凹

R

EVI

R

NIT

MA

K

RE

VIR

NIT

MA

K

seR reS yramirPretaW hserF uaT uA

園花

翠怡

園花

康怡

園花

輝顯

居富景豪

莊山

翠曉

峰尖

峰帝

苑花

悅斌

園花

銀富

苑沁

園花皇威

期二

園花爵金

晴怡

棠滿

善斌

苑雅逸斌

庭豪

上錦

軒戶碧

華光

木本六

麗泓

柏嘉

園花

裕威

苑豪

桂丹

期二

苑花日旭

園花

天錦

園花

輝俊

然攸

墅別

慶錦

園花

碧嘉

園花

瀚泓

軒啟

居湖翠

軒澤福園花

麗明

雅堤芭

花上

苑豪

善斌

園花

豐錦

園花

景美

臺豐錦

園花業啟

園安天

園花朗翠

園花

麗秀

園花

怡翠

苑騰龍

園花安錦

墅別

景惠

園花

軒泓

巒爾

園花

昇強

期三

苑花日旭

園花

彩雲

峰碧嘉

園花

慶吉

逸芊

園豪威港

園花康泰

園名季四

閣圖龍

軒庭

河銀

期二

園花麗泓

埔錦

園花

新元

景美

期二第

軒湖樂

園花

號三

湖樂

園麟

園花

怡美

aviR

kraP elboN

nedraGrevliS lluF

alliVenilamruoT

truoC

gniK repuS

truoC eniuneG

nedraG llewnroC

hcranoM snosaeS

nedraG gnoledaJ

sdoowcinecS ehT

nedraG piY iaK

alliVtrofmoC lluF

田錦

NIT MAK

道水

ret

awhcta

C

Yi Tai Study Hall

祠公

鄧瑜廣

祠宗

氏梁

院書帝二

noitatSgnipmuP

房泵

水污

站水抽

房泵

達猶聖

堂瑟約聖

宮聖眾

宮天協

觀霄九

教道

焚化爐

ArmyThe Salvation

所診

田錦

軍世救

莊農樂音

莊農機有

怡綠

崗警

養蒙

立公

德通

瑟約聖

心中

務服合綜

軍世救

會員委

事鄉

市蚤

跳路

上錦

校學

院劇

苑富

花園

富達

青郁

園壽永

院書

公二王周

庫倉

中心

福利

心中

田錦

樓隆永

倉貨

草香

園花

意美

輝錦

校學

樂福

樓主

圍夏江

墅別

江錦

樓大田錦

鐵港

萊蓬

軒恩主

友鄰堂

樓大

政行

12

1

81

03

51

16

K

1

91

J

1

64

57

71

08

8

65

68

94

L

N

28

H

5

74

95

53

ertneClatneD

A

7

23

5

8

7

D

13

F

34

21

97

8

25

04

B

87

96

33

1

01

1

G

14

topeD

1

6

1

8

7

A

51

27

35A

5

11

E

77

loohcS

M

36

81

13A

6

P

95

02

02

01

nwodoG

5

63

3

E

91

37

12

52

58

4A

C

K

52

61

8

4

02

95

93

107

l

l

l

PUMPING STATION

KAM TIN SEWAGE

KAM TIN BYPASS

KAM TIN ROAD

ÀA¥Ð

KAM SHEUNG ROAD

ÀA¤

ÀA¥ÐÂ

¸

¶ª

ÀA¥Ð¦Ã

KAM HO ROAD

ÀAª

¸

¤®

«

YA

WH

GI

H

GN

OL

GN

IS

T

¤K¶PAT HEUNG ROAD

ÀAKAM TIN

¤KPAT HEUNG

¤¸®ÔÀA¥Ð«nµo®i­p¹º¤u¦a¥­¾ã©

¤u°È­p¹º¶µ¥Ø²Ä

KAM TIN SOUTH, YUEN LONG - ADVANCE WORKS

SITE FORMATION AND INFRASTRUCTURE WORKS FOR DEVELOPMENT AT

PWP ITEM NO. 7804CL

ÀA¤W

DA

OR

OH

MA

ªÀ

DA

OR

GN

UE

HS

MA

K

DA

OR

IU

W

GN

UT

¸³

À

DA

OR

OP

MA

K

¸¤

À

0 100 200 300 400 500 m

ªþ¥ Enclosure 1

¦ì¸

LOCATION PLAN

KO PO TSUEN

°ª®H

KAM TAI ROAD

ÀA®õ ÀÀij¾î¸óÀA

KAM TIN RIVERPROPOSED BRIDGE ACROSS

ÀÀij­«

¤ôÀ

ªvª

SHUI TAU ROAD

CHI HO ROAD

WETLANDPROPOSED RE-PROVISIONED

STATION

KAM SHEUNG ROAD

¤K¶m¨

CENTRE

PAT HEUNG MAINTENANCE

KAM TAI ROADÀA®

ÀÀij¤Ú¤PROPOSED BUS LAYBY

SITE BOUNDARY

¤u¦a

ÀÀij¹j

ÀÀij¹D

LEGEND:¹Ï

«á²¾²{¦³

PROPOSED ROAD WORKS

PROPOSED SEWERAGE WORKS

PROPOSED NOISE BARRIERS

¤½Àç©Ð«Î

¨pÀç©Ð«Î

PUBLIC HOUSING DEVELOPMENT

PRIVATE HOUSING DEVELOPMENT

ÀÀij­«

ÀÀijPROPOSED BRIDGE

WETLANDPROPOSED RE-PROVISIONED

BARRIERS

SET BACK OF EXISTING NOISE

ÀÀij¦Ã¤ô¦¬

Á{®É¦Ã¤ô

SEWAGE STORAGE FACILITY

ON-SITE MAKESHIFT

Page 8: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.

!

!

!

!

!!

!

!

!

!!

!

!

l

A

5

|

¢

g

g

g

:

¡

]

5

[

[

[

[

[

鐵西

路上

eni

L li

aR t

se

W

D

AO

R G

NU

EH

S M

AK

道大邊湖

道繞田錦

街市

田錦

路泰錦

場機

崗石

路北

水金

埔高

路頭

路莆錦

路河治

路公田錦

泰錦

路慶

路河

河錦

上錦

地波

路石錦

DAOR OH IHC

DA

OR

KE

HS

MA

K

DA

OR

OP

OK

DA

OR

OH

MA

K

DR

UA

T IU

HS

D

R IE

T O

P

SSAP

YB

NIT

MAK

DR

HTRO

N IU

HS MAK

DA

OR

OP

MA

K

D

AO

R

OP

MA

K

DAOR IAT MAK

TS I

HS

NIT

MA

K

SHEK KONG AIRFIELD RD

DR

IU

W M

AK

DAO

R IU

W G

NU

T

neusT

gnoH iaT

iaWgniH taK

neusTgnoT zsT

iaWgniH maK

neusT aK gN

iaW gnuL gniW

neusT uaT uiK

neusT naS

nuM gnihS niT maK neusT oP oK

ihS niT maK

iaW

gnoH iaT

村家吳

市田錦

村塘祠

村埔高

村新門城

田錦

村頭橋

圍慶錦

圍康泰

圍慶吉

圍隆永

村康泰

河田錦

河田

R

EVI

R

NIT

MA

K

RE

VIR

NIT

MA

K

園花

翠怡

居富景豪

峰帝

苑沁

園花皇威

棠滿

善斌

庭豪

上錦

華光

期二

苑花日旭

園花

天錦

墅別

慶錦

園花

碧嘉

軒啟

雅堤芭

苑豪

善斌

園花

豐錦

園花

景美

臺豐錦

園花

怡翠

園花安錦

期三

苑花日旭

園花

慶吉

逸芊

園花康泰

閣圖龍

軒庭

河銀居

埔錦

景美

園麟

kraP elboN

truoC

gniK repuS

truoC eniuneG

hcranoM snosaeS

田錦

NIT MAK

noitatSgnipmuP

房泵

水污

房泵

達猶聖

宮天協

ArmyThe Salvation

軍世救

崗警

養蒙

立公

德通

瑟約聖

心中

務服合綜

軍世救

會員委

事鄉

市蚤

跳路

上錦

花園

富達

青郁

園壽永

心中

田錦

樓隆永

樓大田錦

鐵港

友鄰堂

03

1

5

53

04

51

11

02

01

52

[

場廣費收道隧

A6

路鄉八

D

AO

R

OH

MA

K

樓大

政行

824750 E

831250 N

INSET 'A'TSI

NG L

ON

G

HI

GH

WA

Y

PAT HEUNG ROAD

¤K¶

´¡¹Ï ''A«C

®Ô

­xBarracks

149

23

220

235

100

100

200

100

100

10020

0

100

100

200

81

55

171

149

23

220

235

100

100

200

100

100

10020

0

100

100

200

81

55

171

¾÷Airfield

ĵPolice Post

¤G«Ò

Study HallYi Tai

±ç¤ó

Ancestral HallLeung

°t¤Ser Res

°t¤Ser Res

½¬ªLin Fa Tei

°¨¾

KongMa On

³Â¥

Au Tau

ªøCheung Po

¦Ë·Chuk San Tsuen

ÀA¼

WaiKam Hing

ÀA

ÀA¥

ª÷¿

¦N¼

¾ôÀKiu Tau Tsuen

°ª®H

San TsuenKo Po

°ª®

TsuenKo Po

¾¤«

±ç«

§d®Ng Ka Tsuen

¤ûNgau Keng

´^®

ªiÃPo Lo Shan

¤Q¤

S H A P P A T H E U N G

¥Û±^

San TsuenShek Kong

¥Û¶Shek Tong Tsuen

¥Û´Shek Wu Tong

¤ô¬Shui Lau Tin

¤ô·

TinShui Tsan

®õ±

TsuenTai Hong

®õ±

¤jTai Kek

¤jTai Wo

¥Ð¤ß

San TsuenTin Sam

¥Ð¤

TsuenTin Sam

²M¼

¯¨¶

¾î¥x¤s

¥Ã¶

·¨«

Tsuen

Yeung Uk

¤¸±^

San TsuenYuen Kong

Ä®´

SHANHO HOK

¤¸Yuen Kong

¦Ã¤ô³

WorksSewage Treatment

VillageTsing Tam

TsuenTsz Tong

WaiWing Lung

¤U°ª

Kam Tsin Wai

K A M T I N

²M¼æ¤WÄ

IRRIGATION RESERVOIR

TSING TAM UPPER

ShiKam Tin

Wai

Kat Hing

Tsuen

Leung Uk

Tsuen

Pang Ka

WaiTai Hong

¥|©uSeasons Villas

ªø¦

Tsuen

Cheung Kong

±R¤s

New VillageSung Shan

µØWah Yuen

KAM TIN

RIVER

À¥ª

Âo¤

WorksTreatment

Water

TsuenLai Uk

ÅK¸

ôRailway Depot

¥|©uSeasons Monarch

Hung Mo TamWang Toi Shan

¾î¥x¤sµæ¶

Tsoi Yuen Tsuen (North)Wang Toi Shan

¾î¥x¤sµæ¶

(South)Tsoi Yuen TsuenWang Toi Shan

ÀA¥Ð«°

San TsuenKam Tin Shing Mun

¥|©uSeasons Palace

MA PAU LING

²M¼æ¤UÄ

IRRIGATION RESERVOIR

TSING TAM LOWER

¦¿®

Wai

Kong Ha

º¸Riva

Po TsuenHa Ko

ÀA

¤

Ka

m

Sheung

Road

CASTLE PEAK ROAD

«C

®Ô

¶]

Runway

¤K¶

KAM TIN ROAD

À¥¤¸

KAM SHE

UNG

RO

AD

À¤¸

TSING

LONG HIGHWAY

PAT

HE

UNG

ROAD

Water T

unnel

¾É

Pipeline

KAM TIN

HEUNG

SHAP PAT

THE SITE¤u

ÀA

INSET "C"´¡¹Ï ''C

´¡¹Ï ''DINSET "D"

´¡¹Ï ''BINSET "B"´¡¹Ï ''A

INSET "A"

SAN TSUEN

YUEN KONG

¤¸±^

¤Q¤

´¡¹Ï ''EINSET "E"

DR

GN

UE

HS

MA

K

825700 E

831900 N

INSET 'D'

´¡¹Ï ''D

825400 E

832450 N

INSET 'C'

´¡¹Ï ''C

|

\

S[

\

鄉八

gnoK neuY

崗元

園花

康怡

園花

銀富

園花朗翠

nedraGrevliS lluF

nedraG gnoledaJ

alliVtrofmoC lluF

祠宗

氏梁

宮聖眾

12

91

71

8

12

4

825750 E

831750 N

INSET 'B'

KAM SHEUNG ROAD

PAT HEUNG

ROAD

¤K¶ À

´¡¹Ï ''B

¦æ¤¸ô®¦æ¨¤¤¥¡¤¦æ¨

¸ô®

¦æ¤

PATH

FOOT FOOTPATHPLANTERCARRIAGEWAY

DIVIDER

CENTRALCARRIAGEWAY

PLANTER

4m2m2m2.5m 7.3m 2.5m 7.3m

g

鐵西

街市

田錦

泰錦

河田錦

閣圖龍

養蒙

立公

´¡¹Ï ''EINSET 'E'

824300 E

833400 N

824100 E

KAM SHEUNG ROAD

KAM TIN ROAD

KAM PO ROAD

KAM HO ROAD

ÀA

¤

ÀA³

ÀAª

TUNG

WUI ROAD

ªF¶

ÀA¤

ÀA¥Ð

ÀA

¤W

KA

M SHEUNG ROAD STATION

A

A

¯Á¤

ROAD

KA

M SHEUNG

SITE BOUNDARY

¤u¦a

ÀÀij¹j

ÀÀij¹D

LEGEND:¹Ï

MTR (

WEST RAIL LINE)

´ä

ÅK (¦

è

ÀAªKAM HO ROAD

ÀA¤W

ÀA¤W

KAM SHEUNG ROAD

KAM SHEUNG ROAD

KEY PLAN

ÀA¥Ð KAM TIN ROAD

KAM TIN RIVER

PROPOSED BRIDGE ACROSS

ÀÀij¾î¸óÀA

KO PO TSUEN

°ª®H

«á²¾²{¦³

PROPOSED ROAD WORKS

PROPOSED SEWERAGE WORKS

PROPOSED NOISE BARRIERS

²{¦³EXISTING BRIDGE

ÀA®KAM TAI ROAD

ÀAªKAM HO ROAD

ÀÀij¤Ú¤PROPOSED BUS LAYBY

PROPOSED BUS LAYBY

ÀÀij¤Ú¤

IMPROVEMENT WORKS

PROPOSED JUNCTION

IMPROVEMENT WORKS

PROPOSED JUNCTION

PROPOSED JUNCTION IMPROVEMENT WORKS

IMPROVEMENT WORKS

PROPOSED JUNCTION

ÀÀij¤Ú¤PROPOSED BUS LAYBY

¤½Àç©Ð«Î

¨pÀç©Ð«Î

PUBLIC HOUSING DEVELOPMENT

PRIVATE HOUSING DEVELOPMENT

SET BACK OF EXISTING NOISE BARRIERS

¤¸®ÔÀA¥Ð«nµo®i­p¹º¤u¦a¥­¾ã©

¤u°È­p¹º¶µ¥Ø²Ä

SITE FORMATION AND INFRASTRUCTURE WORKS FOR DEVELOPMENT AT KAM TIN SOUTH, YUEN LONG - ADVANCE WORKS

PWP ITEM NO. 7804CL

¤uµ{¥

LAYOUT PLAN

ªþ¥ Enclosure 2

KAM TIN

ÀA

SECTION A-A­å­

ÀÀij­«PROPOSED RE-PROVISIONED WETLAND

ÀÀijPROPOSED BRIDGE

ÀÀij­«PROPOSED RE-PROVISIONED WETLAND

ªvª

¤ôÀ

CHI HO ROAD

SHUI TAU ROAD

PUMPING STATION

KAM TIN SEWAGE

ÀA¥Ð¦Ã

KAM TAI ROAD

KAM TIN BYPASSÀA¥ÐÂ

ÀA®

ÀA¥

Ð

KA

M TIN BYPASS

KAM HO ROAD

ÀAª

ÀÀij¦Ã¤ô¦¬

ÀÀij¥æ¬É³

ÀÀij¥æ¬É³

ÀÀij¥æ¬É³

ÀÀij¥æ¬É³

IMPROVEMENT WORKS

PROPOSED JUNCTION

ÀÀij¥æ¬É³

«C

®Ô

TSING LONG HIGH

WAY

INSET 'E'´¡¹Ï ''E

R:\Drawing-NTWST-Z\NTWST-Z0267\NTWST-Z0267.dgn 21/11/2017 A3 420MM X 297MM

Á{®É¦Ã¤ô

SEWAGE STORAGE FACILITY

ON-SITE MAKESHIFT

Page 9: LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For discussion on 28 November 2017 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT PWP Item No.