LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For...
Transcript of LC Paper No. 235/CB(1)17-18(04) For discussion on …...LC Paper No. 235/CB(1)17-18(04)-1- For...
LC Paper No. CB(1)235/17-18(04)
-1-
For discussion on 28 November 2017
LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT
PWP Item No. 7804CL –
Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works
PURPOSE This paper briefs Members on the proposal to upgrade Public Works Programme Item No. 7804CL “Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works” (the Project) to Category A, at an estimated cost of $697 million in money-of-the-day (MOD) prices, for the construction of infrastructure to support the housing developments at Kam Tin South. PROJECT SCOPE AND NATURE 2. 7804CL which we propose to upgrade to Category A comprises —
(a) widening of a section of about 970 metres (m) long of Kam Ho Road between Kam Tin Road and Tung Wui Road from a single two-lane carriageway to a dual two-lane carriageway, including construction of a bridge of about 95 m long across Kam Tin River;
(b) widening of a section of about 360 m long of eastbound Kam Tin Road between Ko Po Tsuen and Kam Ho Road from a two-lane to three-lane carriageway;
(c) provision of four bus laybys along Kam Sheung Road;
-2-
(d) construction of sewers along Tung Wui Road, Kam Ho Road and Kam Tai Road;
(e) road junction improvement at Kam Tin Road/Kam Tin Bypass/Kam Ho Road, Kam Tin Road/Kam Sheung Road, Kam Ho Road/Tung Wui Road, Tung Wui Road/Kam Sheung Road, Pat Heung Road/Kam Sheung Road and Tsing Long Highway Slip Road/Pat Heung Road junctions;
(f) ancillary works including geotechnical, drainage, water supply,
landscaping and other miscellaneous re-provisioning works; and
(g) implementation of environmental mitigation measures including construction of noise barriers at Kam Tin Road and re-provisioning of wetland near the junction of Chi Ho Road and Shui Tau Road for the works mentioned in 2(a) to (f) above.
3. A location plan and a layout plan of the proposed works, and an artist impression drawing of the bridge across Kam Tin River are at Enclosures 1 to 3 respectively. 4. Subject to the funding approval of the Finance Committee (FC), we plan to commence the proposed works in mid 2018 for completion in end 2021. JUSTIFICATION 5. To meet housing and other development needs, the Government adopts a multi-pronged strategy to increase land supply in the short, medium and long term. Kam Tin South is one of the areas contributing to the increase in housing land supply. To support three proposed public housing sites1 and two West Rail property development projects 2 in Kam Tin South, it is necessary to carry out the proposed road works to cater for the increase in
1 The proposed Sites 1, 4a and 6 are currently undergoing rezoning procedures. The projected
yields for the three sites are 3 700, 3 750 and 1 550 flats respectively. 2 Planned projects at West Rail Kam Sheung Road Station and Pat Heung Maintenance Depot have
projected yields of around 2 690 and 6 060 flats respectively.
-3-
traffic demand arising from the housing developments. The proposed road works can also help address the existing demand for improving the traffic condition of Kam Sheung Road.
6. There is no public sewerage system serving the proposed housing developments in Kam Tin South. The proposed sewerage, which will be connected to the existing Kam Tin Sewage Pumping Station, is required to provide proper and hygienic means to dispose of the sewage generated from the developments.
7. Currently, West Rail Kam Sheung Road Station (KSRS), MTR Kam Tin Building and Pat Heung Maintenance Centre are served by an on-site makeshift sewage storage facility which occupies part of the residential development site at KSRS. It is necessary to commence the proposed sewerage works in mid 2018 for completion in end 2021 so that the makeshift sewage storage facility can be demolished by 2021 to make way for the construction of residential building thereat. Early commencement of the proposed works would also enable the local community to benefit from the proposed road improvement earlier. FINANCIAL IMPLICATIONS 8. We estimate the capital cost of the Project to be $697 million in MOD prices. PUBLIC CONSULTATION 9. We consulted the Kam Tin Rural Committee (KTRC) and the Pat Heung Rural Committee (PHRC) on 8 March 2016 and 9 March 2016 respectively. KTRC offered in-principle support for the Project, and requested the Government to follow up on a number of issues, including constructing new road(s) connecting KSRS and Route 3 in the long run and implementing the sewerage works on Kam Tin Road at the same time. PHRC indicated no objection to the proposed works, and requested the Government to widen Kam Sheung Road, construct new road(s) and bicycle tracks, and increase parking spaces in the park-and-ride facility and bicycle parking spaces
-4-
at the KSRS property development project. 10. We also consulted the Traffic and Transport Committee (T&TC) of Yuen Long District Council (YLDC) on 10 March 2016. A motion was passed by the YLDC T&TC requesting the Government to commit long-term traffic improvement proposal, including the widening of the entire Kam Sheung Road and the provision of new roads linking Kam Tin Road and Kam Sheung Road, to resolve the traffic problem of Kam Sheung Road; otherwise, YLDC T&TC would object to the Project. To address these concerns, the Government wrote to the YLDC T&TC on 10 May 2016 committing to carry out a number of traffic improvement measures and a feasibility study to review the road infrastructure in respect of the developments in Kam Tin South, which includes the long-term improvement of Kam Sheung Road. The YLDC T&TC noted the positive response from the Government.
11. We gazetted the proposed road works under the Roads (Works, Use and Compensation) Ordinance (Cap. 370) and the proposed sewerage works under Cap. 370 as applied by the Water Pollution Control (Sewerage) Regulation (Cap. 358AL) on 24 March 2016 and 1 April 2016. During the statutory objection period, 233 and 15 objections to the proposed road scheme and sewerage works were received respectively. Five objections to the proposed road scheme were resolved, while others which were mainly related to the requested widening of the entire Kam Sheung Road remained unresolved. On 1 November 2016, the Chief Executive-in-Council overruled the remaining unresolved objections and authorised the proposed road works (with modification) and the sewerage works, of which the notices of authorisation were gazetted on 25 November 2016 and 2 December 2016. ENVIRONMENTAL IMPLICATIONS 12. The Project is not a designated project under the Environmental Impact Assessment (EIA) Ordinance (Cap. 499). We have completed the Preliminary Environmental Review which concluded that the Project would not cause adverse environmental impact with the implementation of mitigation 3 A total of 24 objection letters were received. Among them, two objection letters expressing the
same concerns and requests submitted by the same person were considered as one objection. Hence, altogether there were 23 objections.
-5-
measures. These measures include wetland re-provisioning, the use of noise barriers and low noise road surfacing where practicable. For the proposed works within the main drainage channel at Kam Tin, as the drainage channel concerned is a designated project with a valid environmental permit, we will ensure the environmental acceptability of the proposed works and compliance with the statutory requirements under the EIA Ordinance. During the construction stage, the Civil Engineering and Development Department will implement suitable pollution control measures to control the short-term environmental impact to within established standards and guidelines. HERITAGE IMPLICATIONS 13. The Project will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites or buildings, sites of archaeological interest and government historic sites identified by the Antiquities and Monuments Office. TRAFFIC IMPLICATIONS 14. The traffic impact assessment conducted reveals that the proposed road works will smoothen the existing traffic of Kam Sheung Road and also alleviate the traffic impact of the proposed housing developments to nearby roads. To minimise disturbance to the traffic during the construction of the Project, we will maintain the existing number of traffic lanes along the affected roads as far as practicable. In addition, we will establish a Traffic Management Liaison Group and closely liaise with the Transport Department, the Hong Kong Police Force and other stakeholders to discuss, scrutinise and review the proposed temporary traffic arrangements with a view to minimising the traffic impact arising from the construction of the Project. LAND ACQUISITION 15. The area to be resumed under the Project is 951 square metres (m2) and involves seven private lots. The area of government land required is 126 000 m2 and 19 temporary structures on private and government land will
-6-
be cleared. No clearance of domestic structures is required. The estimated cost of land resumption and clearance is about $5.94 million and will be charged to Head 701 – Land Acquisition. BACKGROUND 16. We upgraded 7804CL to Category B in September 2016. 17. We engaged consultants to carry out investigation and detailed design for the Project in November 2014, funded by Subhead B100HX “Minor housing development related works, studies and investigations for items in Category D of the Public Works Programme”. We have substantially completed the detailed design of the Project. WAY FORWARD 18. We plan to seek support from the Public Works Subcommittee for full upgrading of 7804CL to Category A in end 2017/early 2018 before seeking funding approval from FC. We will consider inviting tenders in parallel to facilitate commencement of the Project in mid 2018 for completion in end 2021. We will only award the contract after obtaining FC’s funding approval.
Development Bureau Civil Engineering and Development Department November 2017
R:\Drawing-NTWST-Z\NTWST-Z0270\NTWST-Z0270.dgn A3 297MM X 420MM21/11/2017
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!!
!
!
!
!
*
*
*
*
s
A
A
A
5
�
|
|
|
|
| |
|
||
|
|
|
|
|
|
¢
A
g
g
g
\
\ \
\
S
S
:
:
:
:
¡
]
5
[
[[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
[
k
3
\
\ \
綫
鐵西
場廣費收道隧
路上
錦
eni
L li
aR t
se
W
yawn
uR
azalP lloT
D
AO
R G
NU
EH
S M
AK
A6
道跑
道大邊湖
道
大奧
維艾
道繞田錦
道大
拉維
巴
路
水
金
街市
田錦
路泰錦
路
大江
路
場機
崗石
路北
水金
路
公
朗
青
路
埔高
路
南水
金
路
河錦
路
鄉八
路
大元
道大林園
路頭
水
路鄉八
路莆錦
路河治
徑
賽馬
道大
巒翠
路泰錦
路
上錦
路公田錦
路
泰錦
路慶
錦
道
大諾
提利
菲
路河
映
道大
娜茵
路
田石
路
河錦
路
河錦
路
上錦
路
公
朗
青
路
匯
錦
路
匯
東
路
場機
崗石
路
地波
路石錦
路
莆錦
徑遊
郊涌
欖大
徑遊
郊涌
欖大
DAOR IAT
NE
UY
DAOR GNUEH TAP
DAOR OH IHC
DA
OR
KE
HS
MA
K
DA
OR
OP
OK
DA
OR
OH
MA
K
DR
UA
T IU
HS
EUNEVA EDISLLIH
DA
OR
GN
UE
HS
MA
K
DR
NIT
KE
HS
D
R IE
T O
P
SSAP
YB
NIT
MAK
DR
HTRO
N IU
HS MAK
DA
OR
OP
MA
K
D
AO
R
OP
MA
K
DR
GN
UE
HS
MA
K
DAOR IAT MAK
DAOR IAT MAK
TS I
HS
NIT
MA
K
DAOR HTUOS IUHS MAK
SHEK KONG AIRFIELD RD
D
AO
R IU
HS
MA
K
DA
OR NI
T MAK
D
R O
H G
NIY
D
AO
R
OP
MA
K
EUNEVA KRAP
DAOR IA
T GNOK
D
AO
R
OH
MA
KD
R I
UW
MA
K
DAOR NIT MAK
DAO
R IU
W G
NU
T
LIA
RT
YR
TN
UO
C G
NU
HC
MA
L IAT
嶺瓦缸
司公限有業籐昌萬
廠水濾頭凹
廠理處水污
廠車
鄉八
鐵港
GNEL A GNOK
skroW
tnemtaerT
egaweS
t
op
eD
gn
ue
H t
aP
RT
M
dtL KH oC
nattaR gnohC naM
skroW tnemtaerT retaW uaT uA
neusT
gnoH iaT
oP gnuehC
iaWgniH taK
neusTgnoK gnuehC
neusT naS
gnoK neuY
gnoT uW kehS
neusT naS
maS niT
gnoK nO aM
oW iaT
neusTgnoT zsT
iaWgniH maK
neusT aK gN
iaW gnuL gniW
iaW aH gnoK
neusT naSoP oK
neusT oP oK aH
gnoK neuY
keK iaT
neusTmaS niT
neusT uaT uiK
neusT naS
nuM gnihS niT maK neusT oP oK
neusT aK gnaP
iaW nisT maK
ihS niT maK
iaW
gnoH iaT
uaT iuhS
neusT naS
gnoK kehS
莆長
村新崗石
頭水
乪大
崗鞍馬
村家吳
圍夏江
村家彭
市田錦
村塘祠
村埔高
村江長
村新門城
田錦
村頭橋
村新埔高
圍錢金
塘湖石
圍慶錦
圍康泰
圍慶吉
圍隆永
村康泰
村心田
村新心田
窩大
村新崗元
村埔高下
崗元
河田錦
河田
錦
庫水配主
水食頭凹
R
EVI
R
NIT
MA
K
RE
VIR
NIT
MA
K
seR reS yramirPretaW hserF uaT uA
園花
翠怡
園花
康怡
園花
輝顯
居富景豪
莊山
翠曉
峰尖
苑
峰帝
苑花
悅斌
園花
銀富
苑沁
園花皇威
期二
園花爵金
軒
晴怡
棠滿
軒
善斌
苑雅逸斌
庭豪
上錦
軒戶碧
臺
華光
木本六
苑
麗泓
苑
柏嘉
園花
裕威
苑豪
桂丹
期二
苑花日旭
園花
天錦
園花
輝俊
居
然攸
墅別
慶錦
園花
碧嘉
園花
瀚泓
軒啟
居湖翠
軒澤福園花
麗明
雅堤芭
園
花上
錦
苑豪
善斌
園花
豐錦
園花
景美
臺豐錦
園花業啟
園安天
園花朗翠
廬
錦
園花
麗秀
園花
怡翠
苑騰龍
園花安錦
墅別
景惠
園花
軒泓
巒爾
園花
昇強
期三
苑花日旭
園花
彩雲
峰碧嘉
園花
慶吉
居
逸芊
園豪威港
園花康泰
園名季四
閣圖龍
軒庭
河銀
期二
園花麗泓
居
埔錦
園花
新元
居
景美
期二第
軒湖樂
園花
號三
軒
湖樂
園麟
園花
怡美
aviR
kraP elboN
nedraGrevliS lluF
alliVenilamruoT
truoC
gniK repuS
truoC eniuneG
nedraG llewnroC
hcranoM snosaeS
nedraG gnoledaJ
sdoowcinecS ehT
nedraG piY iaK
alliVtrofmoC lluF
田錦
NIT MAK
道水
引
道
水
引
ret
awhcta
C
Yi Tai Study Hall
祠公
鄧瑜廣
祠宗
氏梁
院書帝二
noitatSgnipmuP
房泵
水污
站水抽
房泵
堂
命
生
堂
光
錦
達猶聖
堂瑟約聖
宮聖眾
宮天協
觀霄九
教道
焚化爐
ArmyThe Salvation
所診
田錦
軍世救
莊農樂音
莊農機有
怡綠
崗警
養蒙
立公
德通
瑟約聖
心中
務服合綜
軍世救
會員委
事鄉
場
市蚤
跳路
上錦
校學
雅
適
院劇
苑富
花園
富達
青郁
園壽永
院書
公二王周
庫倉
中心
福利
心中
田錦
樓隆永
倉貨
居
草香
園花
意美
輝錦
校學
園
樂福
樓主
圍夏江
墅別
江錦
樓大田錦
鐵港
閣
萊蓬
軒恩主
友鄰堂
樓大
政行
12
1
81
03
51
16
K
1
91
J
1
64
57
71
08
8
65
68
94
L
N
28
H
5
74
95
53
ertneClatneD
A
7
23
5
8
7
D
13
F
34
21
97
8
25
04
B
87
96
33
1
01
1
G
14
topeD
1
6
1
8
7
A
51
27
35A
5
11
E
77
loohcS
M
36
81
13A
6
P
95
02
02
01
nwodoG
5
63
3
E
91
37
12
52
58
4A
C
K
52
61
8
4
02
95
93
107
l
l
l
PUMPING STATION
KAM TIN SEWAGE
KAM TIN BYPASS
KAM TIN ROAD
ÀA¥Ð
KAM SHEUNG ROAD
ÀA¤
ÀA¥ÐÂ
¸
¶ª
ÀA¥Ð¦Ã
KAM HO ROAD
ÀAª
¸
¤®
«
YA
WH
GI
H
GN
OL
GN
IS
T
¤K¶PAT HEUNG ROAD
ÀAKAM TIN
¤KPAT HEUNG
¤¸®ÔÀA¥Ð«nµo®ip¹º¤u¦a¥¾ã©
¤u°Èp¹º¶µ¥Ø²Ä
KAM TIN SOUTH, YUEN LONG - ADVANCE WORKS
SITE FORMATION AND INFRASTRUCTURE WORKS FOR DEVELOPMENT AT
PWP ITEM NO. 7804CL
ÀA¤W
DA
OR
OH
MA
K¸
ªÀ
DA
OR
GN
UE
HS
MA
K
DA
OR
IU
W
GN
UT
¸³
À
DA
OR
OP
MA
K
¸¤
À
0 100 200 300 400 500 m
ªþ¥ Enclosure 1
¦ì¸
LOCATION PLAN
KO PO TSUEN
°ª®H
KAM TAI ROAD
ÀA®õ ÀÀij¾î¸óÀA
KAM TIN RIVERPROPOSED BRIDGE ACROSS
ÀÀij«
¤ôÀ
ªvª
SHUI TAU ROAD
CHI HO ROAD
WETLANDPROPOSED RE-PROVISIONED
STATION
KAM SHEUNG ROAD
¤K¶m¨
CENTRE
PAT HEUNG MAINTENANCE
KAM TAI ROADÀA®
ÀÀij¤Ú¤PROPOSED BUS LAYBY
SITE BOUNDARY
¤u¦a
ÀÀij¹j
ÀÀij¹D
LEGEND:¹Ï
«á²¾²{¦³
PROPOSED ROAD WORKS
PROPOSED SEWERAGE WORKS
PROPOSED NOISE BARRIERS
¤½Àç©Ð«Î
¨pÀç©Ð«Î
PUBLIC HOUSING DEVELOPMENT
PRIVATE HOUSING DEVELOPMENT
ÀÀij«
ÀÀijPROPOSED BRIDGE
WETLANDPROPOSED RE-PROVISIONED
BARRIERS
SET BACK OF EXISTING NOISE
ÀÀij¦Ã¤ô¦¬
Á{®É¦Ã¤ô
SEWAGE STORAGE FACILITY
ON-SITE MAKESHIFT
!
!
!
!
!!
!
!
!
!!
!
!
l
A
5
�
|
¢
g
g
g
:
¡
]
5
[
[
[
[
[
綫
鐵西
路上
錦
eni
L li
aR t
se
W
D
AO
R G
NU
EH
S M
AK
道大邊湖
道繞田錦
街市
田錦
路泰錦
路
場機
崗石
路北
水金
路
埔高
路頭
水
路莆錦
路河治
路公田錦
路
泰錦
路慶
錦
路河
映
路
河錦
路
上錦
路
公
朗
青
路
匯
錦
路
匯
東
路
地波
路石錦
DAOR OH IHC
DA
OR
KE
HS
MA
K
DA
OR
OP
OK
DA
OR
OH
MA
K
DR
UA
T IU
HS
D
R IE
T O
P
SSAP
YB
NIT
MAK
DR
HTRO
N IU
HS MAK
DA
OR
OP
MA
K
D
AO
R
OP
MA
K
DAOR IAT MAK
TS I
HS
NIT
MA
K
SHEK KONG AIRFIELD RD
DR
IU
W M
AK
DAO
R IU
W G
NU
T
neusT
gnoH iaT
iaWgniH taK
neusTgnoT zsT
iaWgniH maK
neusT aK gN
iaW gnuL gniW
neusT uaT uiK
neusT naS
nuM gnihS niT maK neusT oP oK
ihS niT maK
iaW
gnoH iaT
村家吳
市田錦
村塘祠
村埔高
村新門城
田錦
村頭橋
圍慶錦
圍康泰
圍慶吉
圍隆永
村康泰
河田錦
河田
錦
R
EVI
R
NIT
MA
K
RE
VIR
NIT
MA
K
園花
翠怡
居富景豪
苑
峰帝
苑沁
園花皇威
棠滿
軒
善斌
庭豪
上錦
臺
華光
期二
苑花日旭
園花
天錦
墅別
慶錦
園花
碧嘉
軒啟
雅堤芭
苑豪
善斌
園花
豐錦
園花
景美
臺豐錦
廬
錦
園花
怡翠
園花安錦
期三
苑花日旭
園花
慶吉
居
逸芊
園花康泰
閣圖龍
軒庭
河銀居
埔錦
居
景美
園麟
kraP elboN
truoC
gniK repuS
truoC eniuneG
hcranoM snosaeS
田錦
NIT MAK
noitatSgnipmuP
房泵
水污
房泵
堂
命
生
堂
光
錦
達猶聖
宮天協
ArmyThe Salvation
軍世救
崗警
養蒙
立公
德通
瑟約聖
心中
務服合綜
軍世救
會員委
事鄉
場
市蚤
跳路
上錦
花園
富達
青郁
園壽永
心中
田錦
樓隆永
樓大田錦
鐵港
友鄰堂
03
1
5
53
04
51
11
02
01
52
[
場廣費收道隧
A6
路鄉八
D
AO
R
OH
MA
K
樓大
政行
824750 E
831250 N
INSET 'A'TSI
NG L
ON
G
HI
GH
WA
Y
PAT HEUNG ROAD
¤K¶
´¡¹Ï ''A«C
®Ô
xBarracks
149
23
220
235
100
100
200
100
100
10020
0
100
100
200
81
55
171
149
23
220
235
100
100
200
100
100
10020
0
100
100
200
81
55
171
¾÷Airfield
ĵPolice Post
¤G«Ò
Study HallYi Tai
±ç¤ó
Ancestral HallLeung
°t¤Ser Res
°t¤Ser Res
½¬ªLin Fa Tei
°¨¾
KongMa On
³Â¥
Au Tau
ªøCheung Po
¦Ë·Chuk San Tsuen
ÀA¼
WaiKam Hing
ÀA
ÀA¥
ª÷¿
¦N¼
¾ôÀKiu Tau Tsuen
°ª®H
San TsuenKo Po
°ª®
TsuenKo Po
¾¤«
±ç«
§d®Ng Ka Tsuen
¤ûNgau Keng
´^®
ªiÃPo Lo Shan
¤Q¤
S H A P P A T H E U N G
¥Û±^
San TsuenShek Kong
¥Û¶Shek Tong Tsuen
¥Û´Shek Wu Tong
¤ô¬Shui Lau Tin
¤ô·
TinShui Tsan
®õ±
TsuenTai Hong
®õ±
¤jTai Kek
¤jTai Wo
¥Ð¤ß
San TsuenTin Sam
¥Ð¤
TsuenTin Sam
²M¼
¯¨¶
¾î¥x¤s
¥Ã¶
·¨«
Tsuen
Yeung Uk
¤¸±^
San TsuenYuen Kong
Ä®´
SHANHO HOK
¤¸Yuen Kong
¦Ã¤ô³
WorksSewage Treatment
VillageTsing Tam
TsuenTsz Tong
WaiWing Lung
¤U°ª
Kam Tsin Wai
K A M T I N
²M¼æ¤WÄ
IRRIGATION RESERVOIR
TSING TAM UPPER
ShiKam Tin
Wai
Kat Hing
Tsuen
Leung Uk
Tsuen
Pang Ka
WaiTai Hong
¥|©uSeasons Villas
ªø¦
Tsuen
Cheung Kong
±R¤s
New VillageSung Shan
µØWah Yuen
KAM TIN
RIVER
À¥ª
Âo¤
WorksTreatment
Water
TsuenLai Uk
ÅK¸
ôRailway Depot
¥|©uSeasons Monarch
Hung Mo TamWang Toi Shan
¾î¥x¤sµæ¶
Tsoi Yuen Tsuen (North)Wang Toi Shan
¾î¥x¤sµæ¶
(South)Tsoi Yuen TsuenWang Toi Shan
ÀA¥Ð«°
San TsuenKam Tin Shing Mun
¥|©uSeasons Palace
MA PAU LING
²M¼æ¤UÄ
IRRIGATION RESERVOIR
TSING TAM LOWER
¦¿®
Wai
Kong Ha
º¸Riva
Po TsuenHa Ko
ÀA
¤
Ka
m
Sheung
Road
CASTLE PEAK ROAD
«C
®Ô
¶]
Runway
¤K¶
KAM TIN ROAD
À¥¤¸
KAM SHE
UNG
RO
AD
À¤¸
TSING
LONG HIGHWAY
PAT
HE
UNG
ROAD
Water T
unnel
¾É
Pipeline
KAM TIN
HEUNG
SHAP PAT
THE SITE¤u
ÀA
INSET "C"´¡¹Ï ''C
´¡¹Ï ''DINSET "D"
´¡¹Ï ''BINSET "B"´¡¹Ï ''A
INSET "A"
SAN TSUEN
YUEN KONG
¤¸±^
¤Q¤
´¡¹Ï ''EINSET "E"
DR
GN
UE
HS
MA
K
825700 E
831900 N
INSET 'D'
´¡¹Ï ''D
825400 E
832450 N
INSET 'C'
´¡¹Ï ''C
|
\
S[
\
路
鄉八
gnoK neuY
崗元
園花
康怡
園花
銀富
園花朗翠
nedraGrevliS lluF
nedraG gnoledaJ
alliVtrofmoC lluF
祠宗
氏梁
宮聖眾
12
91
71
8
12
4
825750 E
831750 N
INSET 'B'
KAM SHEUNG ROAD
PAT HEUNG
ROAD
¤K¶ À
A¤
´¡¹Ï ''B
¦æ¤¸ô®¦æ¨¤¤¥¡¤¦æ¨
¸ô®
¦æ¤
PATH
FOOT FOOTPATHPLANTERCARRIAGEWAY
DIVIDER
CENTRALCARRIAGEWAY
PLANTER
4m2m2m2.5m 7.3m 2.5m 7.3m
g
綫
鐵西
街市
田錦
路
泰錦
河田錦
閣圖龍
養蒙
立公
´¡¹Ï ''EINSET 'E'
824300 E
833400 N
824100 E
KAM SHEUNG ROAD
KAM TIN ROAD
KAM PO ROAD
KAM HO ROAD
ÀA
¤
ÀA³
ÀAª
TUNG
WUI ROAD
ªF¶
ÀA¤
ÀA¥Ð
ÀA
¤W
KA
M SHEUNG ROAD STATION
A
A
¯Á¤
ROAD
KA
M SHEUNG
SITE BOUNDARY
¤u¦a
ÀÀij¹j
ÀÀij¹D
LEGEND:¹Ï
MTR (
WEST RAIL LINE)
´ä
ÅK (¦
è
ÀAªKAM HO ROAD
ÀA¤W
ÀA¤W
KAM SHEUNG ROAD
KAM SHEUNG ROAD
KEY PLAN
ÀA¥Ð KAM TIN ROAD
KAM TIN RIVER
PROPOSED BRIDGE ACROSS
ÀÀij¾î¸óÀA
KO PO TSUEN
°ª®H
«á²¾²{¦³
PROPOSED ROAD WORKS
PROPOSED SEWERAGE WORKS
PROPOSED NOISE BARRIERS
²{¦³EXISTING BRIDGE
ÀA®KAM TAI ROAD
ÀAªKAM HO ROAD
ÀÀij¤Ú¤PROPOSED BUS LAYBY
PROPOSED BUS LAYBY
ÀÀij¤Ú¤
IMPROVEMENT WORKS
PROPOSED JUNCTION
IMPROVEMENT WORKS
PROPOSED JUNCTION
PROPOSED JUNCTION IMPROVEMENT WORKS
IMPROVEMENT WORKS
PROPOSED JUNCTION
ÀÀij¤Ú¤PROPOSED BUS LAYBY
¤½Àç©Ð«Î
¨pÀç©Ð«Î
PUBLIC HOUSING DEVELOPMENT
PRIVATE HOUSING DEVELOPMENT
SET BACK OF EXISTING NOISE BARRIERS
¤¸®ÔÀA¥Ð«nµo®ip¹º¤u¦a¥¾ã©
¤u°Èp¹º¶µ¥Ø²Ä
SITE FORMATION AND INFRASTRUCTURE WORKS FOR DEVELOPMENT AT KAM TIN SOUTH, YUEN LONG - ADVANCE WORKS
PWP ITEM NO. 7804CL
¤uµ{¥
LAYOUT PLAN
ªþ¥ Enclosure 2
KAM TIN
ÀA
SECTION A-Aå
ÀÀij«PROPOSED RE-PROVISIONED WETLAND
ÀÀijPROPOSED BRIDGE
ÀÀij«PROPOSED RE-PROVISIONED WETLAND
ªvª
¤ôÀ
CHI HO ROAD
SHUI TAU ROAD
PUMPING STATION
KAM TIN SEWAGE
ÀA¥Ð¦Ã
KAM TAI ROAD
KAM TIN BYPASSÀA¥ÐÂ
ÀA®
ÀA¥
Ð
KA
M TIN BYPASS
KAM HO ROAD
ÀAª
ÀÀij¦Ã¤ô¦¬
ÀÀij¥æ¬É³
ÀÀij¥æ¬É³
ÀÀij¥æ¬É³
ÀÀij¥æ¬É³
IMPROVEMENT WORKS
PROPOSED JUNCTION
ÀÀij¥æ¬É³
«C
®Ô
TSING LONG HIGH
WAY
INSET 'E'´¡¹Ï ''E
R:\Drawing-NTWST-Z\NTWST-Z0267\NTWST-Z0267.dgn 21/11/2017 A3 420MM X 297MM
Á{®É¦Ã¤ô
SEWAGE STORAGE FACILITY
ON-SITE MAKESHIFT