20th March 2006 1 GGLASST Project
LAT
Beam Test Workshop
GLAST ProgramBeam Test Workshop
CU Outer Shipping Container
Michele Pinchera [email protected]
20th March 2006 2 GGLASST Project
LAT
Beam Test Workshop
CU OSC - Overview
Purpose and Design Requirements
Overall Design
Design Criteria
Verification
Schedule
20th March 2006 3 GGLASST Project
LAT
Beam Test Workshop
CU OSC - Purpose
• The CU Outer Shipping Container must be capable of transporting and storing the Beam Test CU without damage per the requirements stated in the LAT and MIL applicable documents
20th March 2006 4 GGLASST Project
LAT
Beam Test Workshop
CU OSC –Design Requirements
• Transportation Environment1. Transport Accelerations vs CU allowable accelerations
Analysis assumes applied environmental load occurs simultaneously in all three axes
Wire ropes isolators in compression/roll orientation
2. Temperature and HumidityThe container shall maintain temperature and humidity requirements as required for the
instrument per LAT-MD-00404, "LAT Contamination Control Plan“
GN2 overpressure inside OSC
Mode Logitudinal Acceleration
Lateral Acceleration
Vertical Acceleration
CU Max Allowable +/- 1.25 g +/- 1.25 g +/- 3.0 g Truck +/- 3.5 g +/- 2.0 g +/- 6.0 g
Mode CU Limit Temperature +5 °C to +40 °C
Humidity less than 50 RH
20th March 2006 5 GGLASST Project
LAT
Beam Test Workshop
CU OSC – Design Requirements (continued)
• CU-ISP Interface• Mounting Interface for the ISC interface plate• Adequate clearance between CU shipping volume and inside of the OSC
cover to allow for:1. Safe cover removal and installation2. Predicted dynamic motion of the CU-ISC
• Transport Truck Payload Limits
OSC mass limit = 750kg OSC volume limit (lateral x longitudinal) = 2000 x 3000 mm
Mode Standard truck limits Payload mass 1500kg
Payload volume 2000 x 3500 mm
20th March 2006 6 GGLASST Project
LAT
Beam Test Workshop
CU OSC – Overall Design
Cover
2 Breather Valves
Humidity Indicator
GN2 Connector
Cover aligment pin
Pressure Gauge
GN2 Connector
OSC external surface protection: clear anodization
ZY
XLAT coordinate ref. system
• OSC Transport Configuration
2.3 m1.85 m
1m
20th March 2006 7 GGLASST Project
LAT
Beam Test Workshop
CU OSC – Overall Design
Base Plate Pallet
Lifting Fixture(Steel)
O-ring Groove
ZY
XLAT coordinate ref. system
OSC Lifting Stems
• OSC Primary Structure
20th March 2006 8 GGLASST Project
LAT
Beam Test Workshop
CU OSC - Overall Design (continued)
• CU-ISC Integration within the OSC
Wire Ropes Isolators
ISC Interface Plate
CU-ISC
OSC-ISC Interface Plate
Z Y
XLAT coordinate ref. system
20th March 2006 9 GGLASST Project
LAT
Beam Test Workshop
CU OSC – Design Criteria
• Base Plate and Pallet act as primary structure carrying load of OSC
• Loads determination and stresses analysis by means of Hand Calculations and FEA Model for:
– Cover– Base plate and Pallet– Lifting Fixture– Interface Plate– Bolted and Welted Joints
• Mass Properties of ISC Payload– Mass 750 kg, MAX– CG (45 mm, -152 mm, 182 mm) from Interface Plate on respect of OSC CG
• Factors of Safety– Yield Design Load FS = 3.0– Ultimate Design Load: FS = 5.0
• Structural Margins of Safety Must be Positive
20th March 2006 10 GGLASST Project
LAT
Beam Test Workshop
• Proof Load Test– Lifting equipment proof test
• Test items: Base plate, pallet and lifting fixture
• Test with a dummy load as close as possible to, but not exceeding 125% of the rated load
• Edgewise Drop (FED STD. 101C)
• Test items: OSC, ISC, grid simulator, mass simulators
• Height of drop: 0.23m (9 inches)
• Leaks Test• Test item: cover, base plate
• Load cycles from min overpressure of 0.05atm (value at INFN integration building, 2m altitude) to max overpressure of 0.2 atm (value at max INFN-CERN route altitude, 1381 m)
• Static leaks test at min overpressure (<0.1atm). Duration of at least 30min with no leaks
CU OSC - Verification
dummy
9”
GN2
6”sill
20th March 2006 11 GGLASST Project
LAT
Beam Test Workshop
CU OSC - Schedule
Milestones:
Ready for Proof Tests by May 15
Ready for Integration by May 22