ENGINEERING
Design Development,
Review & Qualification
22014, Engineering
GEP & GMP
32014, Engineering
CLIENT NEEDS/ INFORMATIONS VALIDATED PLANT
CONCEPTUAL DESIGN
URS
INSTALLATION QUALIFICATION
PERFORMANCE QUALIFICATION
OPERATIONAL QUALIFICATION
FAT/SAT
CONSTRUCTION
DETAIL DESIGN/DETAIL SPECIFICATION
BASIC DESIGN/FUNCTIONAL SPECIFICATION
ENGINEERING
VALIDATION
MIXED PARTICIPATION
PROJECT FLOW
VERIFICATION
EXCHANGED INFORMATIONS
FLOW OF INFORMATIONS
DESIGN QUALIFICATION
GMP Requirements
RISK ANALYSIS
VALIDATION MASTER PLAN
GMP REVIEW
GMP Engineering V-Cycle
42014, Engineering
VMP
DRAFT
URS /
CONCEPTUAL
DESING
CLIENT
NEEDS
RA DRAFT
DQDQ
DETAIL
DESIGN
BASIC
DESIGN
GMP
REVIEW
VALUE
ENGINEERING
CONSTRUCTION IQ
FINAL RA
SYSTEM BUILD
FINAL VMP
PQ
OQ
FAT / SATVERIFICATION
GMP Engineering – Activity Flow
52014, Engineering
Design
Feasibility Study
Conceptual Design
Basic Design
Prj. Plan & Prj. Mngmt.
Detail Design
Procurement Support
Engineering - Main Project Phases
Enhanced
GMP Review
GMP Review
Risk Assesment &
Risk Analysis
Value Engineering
Design Qualification
62014, Engineering
Construction
/ Installation
Project
Quality Plan
Project
Logistic Plan
Project
Quality Control
Commissioning
Planning and
Controlling
Physical Completion
and Checking
Instrument calibration
and Fine Tuning
Set Up and Support to
Start Up
Testing and Reporting
Engineering – Execution & Commisioning
72014, Engineering
Qualification
Plan (SMVP, QMP)
Report & Final
Summaries
Scheduling
Protocols
Execution
Review
Qualification Matrix
Reports
Preparation
Engineering - Qualification
IQ
PQ
OQ
FAT / SATVERIFICATION
82014, Engineering
EngineeringProject Deliverables
92014, Engineering
URSBlock diagram with
material balance
Process flow sheet with
material balance
Utilities characteristics
and consumtion
summary
Equipments Summary
Activities tima-line
Equipments data sheets
A
A
Instruments summary
Process and utilities
P&IDSketch drawings
Instruments data sheetLogic automation
diagram
Equipments functuional
specification
Instrumentation
functional specification
Line list
Input/Output signal list
B
C
Equipments Shops
drawingsB
Control system
specificationC
Piping lay-out Piping material take-off
Instruments lay-out
Preparation and
management of material
requirements
Construction activities
supervisionPower and
instrumentation
specification
Engineering – Flow Diagram Activity
102014, Engineering
Conceptual Design /
Feasibility Study
Basic Design Detail Design
Etude d’Esquisse APS APD
Conceptual Design /
Feasibility Study
Advanced Basic
Design
Engineering – Type of Project
112014, Engineering
Deliverables Basic Advanced Basic
Etude d’Esquisse /
Conceptual -
Feasibility
APS APD
General Documents
Documents List ■ ■ ■ ■ ■
Project Schedule □ ■ □ □ ■
Project Quality Plan □ ■ □ □ ■
Meeting Minutes ■ ■ ■ ■ ■
General Project Technical Report ■ ■ □ ■ ■
Facility General Layout ■ ■ ■ “single-line”
Diagram
■ ■
Project schedule plan ■ ■ □ ■ ■
Material Flow Layout ■ ■ ■ “single-line”
Diagram
■ ■
Personnel Flow Layout ■ ■ ■ “single-line”
Diagram
■ ■
Cost Estimates Summary ■ ± 30% ■ ± 15% ■ ± 30% ■ ± 15% ■ ± 15%
Process Design
URS – Facility ■ ■ ■ Preliminary URS ■ ■
URS – Process Equipments ■ URS - Preliminary ■ □ ■ ■
Equipment List ■ ■ ■ Preliminary ■ ■
Process flow diagram ■ ■ ■ ■ ■
Equipment Layouts ■ ■ ■ “single-line”
Diagram
■ ■
Layouts of area classification ■ ■ ■ “single-line”
Diagram
■ ■
Layouts for pressure differentials ■ ■ ■ “single-line”
Diagram
■ ■
Engineering – Phase Project Deliverables
122014, Engineering
Deliverables Basic Advanced Basic
Etude d’Esquisse /
Conceptual -
Feasibility
APS APD
Civil Works
Civil demolitions & reconstruction Layouts (if
needed)
■ ■ □ □ ■
Waste drains & Process drains Layouts ■ Only Drain’s Point ■ “single-line”
Diagram
□ □ ■ “single-line”
Diagram
Preliminary loading Layouts (if needed) □ ■ □ □ ■
Cleanroom Finishing Works
Cleanroom Finishing Layouts □ ■ □ □ ■
Technical Specification for Walls, Ceilings,
Floors and cleanroom installation
■ Preliminary ■ □ □ ■
Functional Specification for Access Interlocks (if
needed)
□ ■ □ □ ■
HVAC System
URS - HVAC ■ ■ □ ■ ■
Technical Specifications for HVAC (general) □ ■ □ ■ ■
HVAC “Zoning” Layouts ■ ■ ■ “single-line”
Diagram
■ ■
HVAC Diffusers and Grilles Layouts □ ■ □ ■ ■
False Ceiling Lay-out □ ■ □ □ ■
HVAC Single Wire Ducts Layouts □ ■ □ □ ■
HVAC calculations & sizing □documento da
preparare, non
consegnare
■ □ ■ ■
Preliminary P&ID of each Air Handling Unit and
Distribution
■ Process Flow
Diagrams
■ Preliminary P&ID □ ■ Process Flow
Diagrams
■Preliminary P&ID
Installation Layouts of Air Handling Units ■ ■ ■ “single-line”
Diagram
■ ■
Main components datasheets □ ■ □ ■
Engineering – Flow Diagram Activity
132014, Engineering
Deliverables Basic Advanced Basic
Etude d’Esquisse /
Conceptual -
Feasibility
APS APD
Black Utilities (Hot water, Cold Water,
Compressed Air, Industrial Steam, Vents,
Potable Water, Softened Water,
Demineralized Water, Fire Fighting Water,
Waste Water), Process Utilities and Clean
Utilities (Water For Injection, Clean Steam,
Purified Water, Process Nitrogen, Process
Compressed Air)
Utilities List ■ ■ ■ Preliminary ■ ■
Utilities Consumption Summary ■ Preliminary ■ ■ Preliminary ■ Preliminary ■
Utilities Block Diagram ■ ■ ■ ■ □
URS (for Process and Clean Utilities) ■ ■ □ ■ ■
User points Lists (for Process and Clean
Utilities)
□ ■ □ ■ ■
Technical Specifications for Utilities □ ■ □ ■ ■
Utility Components Lists ■ ■ □ ■ ■
Utility Dimensioning Calculation Report (where
applicable)
□ documento da
preparare, non
consegnare
■ □ documento da
preparare, non
consegnare
□ documento da
preparare, non
consegnare
■
Generators and Treatment Skids datasheets
(where applicable)
■ ■ □ ■ ■
Pumps datasheets (where applicable) ■ ■ □ ■ ■
Heat Exchangers Datasheets (where
applicable)
■ ■ □ ■ ■
Tanks datasheets (where applicable) ■ ■ □ ■ ■
Preliminary P&ID of each Utility (Generation
and Distribution)
■ Process Flow
Diagrams
■ Preliminary P&ID □ ■ Process Flow
Diagrams
■ Preliminary P&ID
Utilities Generation and Distribution Layouts ■ Distribution
“single-line”
Diagram
■ Distribution
“single-line”
Diagram
□ ■ Distribution
“single-line”
Diagram
■ Distribution
“single-line”
Diagram
Engineering – Flow Diagram Activity
142014, Engineering
Deliverables Basic Advanced Basic
Etude d’Esquisse /
Conceptual -
Feasibility
APS APD
Electrical Plants
Electrical Loads Summary ■ ■ ■ Preliminary ■ ■
Block Diagrams of Electrical Boards ■ ■ □ □ ■
Single Wire Electrical Distribution Layouts ■ ■ □ □ ■
Automation and Instrumentation
Control System Architecture Layout ■ ■ □ ■ ■
Control System Functional Specifications □ ■ □ □ ■
Instruments Lists ■ ■ □ □ ■
Instruments datasheets □ ■ □ □ ■
Preliminary Input – Output Lists □ ■ □ □ ■
QC Labs
QC Lab Equipment and Instruments List ■ ■ ■ Preliminary ■ ■
QC Lab Furniture Layout □ ■ □ □ □
QC Lab Equipment and Instruments Layout □ ■ □ □ ■
Engineering – Flow Diagram Activity
152014, Engineering
Economic framework
Contracts
Quality plan
General conditions
Chronodiagram
Security Plan
Maintenance Plan
Technical report on prevention and fire
protection
Engineering – Formal Deliverables
162014, Engineering
Architectural
User requirements, Tecnical Specifications
Bill of quantities, List unit prices
Lay-out, Prospectus and Sections
Details, Furniture
Details, schedules of fixtures
Structural
User requirements, Technical Specifications
Bill of quantities, List unit prices
Explanatory memorandum, geotechnical, materials on floors . . .
Structural calculations
Lay-out, Pillars table and Armour
Engineering – Civil Works
172014, Engineering
Conditioning User requirements, Technical Specification
Bill of quantities, List unit prices
Thermal calculation
Aerial sketches, Hydraulic sketches, Automation
Lay-out, Prospectus and Sections
Details
Sanitary Fluids User requirements, Technical Specifications
Bill of quantities, List unit prices
Lay-out, Prospectus and Sections
Technical & Medical Gasses User requirements, Technical Specification
Bill of quantities, List unit prices
Lay-out, P&ID, Sketches
Engineering – Critical Utilities
182014, Engineering
Equipments and Instrumentation summary
P&ID’s
Technical specification for equipments,
instruments, machinery and systems
Controls and automation systems
Process utilities summaries
Consumtion summaries
Piping technical specifications
Engineering – Process
192014, Engineering
User requirements, Technical specification
Bill of quantities, List unit prices
Cables sizing, lighting sizing, comunication
plants sizing
Block diagrams, Board diagrams
Lay-out for lighting, electrical plugs, power
Lighting protection diagrams
Electricals and comunication plants details
Engineering – Electrical & Special Plants
202014, Engineering
Many thanks for
your attention
Leandro [email protected]
www.latconsultores.com.ar
Gilberto [email protected]
www.latconsultores.com.ar