Lars Ingolf Eide 03 August 2010
Barents 2020 Phase 4 - Working group RN02
Kick-off meeting Moscow August 24 - 25, 2010
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN02
03 August 2010
2
Barents 2020 Phase 4 – Working Group 2 Members
Russian team Norwegian/OGP team
Marat N. Mansurov, VNIIGAZ, Coordinator
Marina M. Karulina, Krylov Shipbuilding Res. Inst
Irina A. Surikova, Russian Maritime Register of Shipping, TK 318
Sergei D. Kim, VNIIGAZ
Pavel Liferov, Shtokman Development AG
Nina Krupina, Arctic and Antarctic Res. Inst.
Yury Nemenko, Giprospetsgaz
Vakhtang M. Glonti, Gazprom
S.I Zibakin, Gazprom Shelf Production
Gleb Churkin, Agency of researches of industrial risks (observer)
Valery P. Nekrasov, Ministry of Emergency Measures of the Russian Federation (observer)
Vladimir A. Pestryaev, Sakhlinnipimorneft
Rod Allan, Transocean
Arne Gürtner, Statoil
Hans Martin Sand, Moss Maritime
Jean-Marc Cholley, Total/OGP
Graham Thomas, BP/OGP
Mike Orr, Cairn Energy/OGP
Guido Kuiper, Shell/OGP
DNV:
Per Olav Moslet,
Lars Ingolf Eide, Coordinator
Invited experts ??
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN02
03 August 2010
3
Objective and scope of RN02 work in Phase 4 Objective: Provide guidance and recommendations for design of stationary floating
installations in the Barents Sea against ice loads, to fill the gaps identified in the 2010 edition of the coming ISO 19906 Standard.
Scope of work: - Task 1 – Workshop on ISO 19900-series, with emphasis on ISO19906.
Objective: To harmonize understanding between Russian and Norwegian engineers with respect to reliability and probabilistic vs. deterministic design.
- Task 2 – Develop Guidance for design of stationary floating structures against ice loads.
Objective: Develop a Guidance Document that may serve as a common Russian-Norwegian Supplement to ISO19906 for use in the Barents Sea that fills identified gaps in ISO19906 with respect to ice loads against and the response of stationary floating structures. The Guidance will be based on state-of-the-art.
Preparation of a detailed and final Scope of Work for this task can only be made after the working group has been formally established with Russian and Norwegian experts.
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN02
03 August 2010
4
Key issues and challenges Finalize scope to focus on the right topics
Obtain sufficient commitment from group members
Find the optimal “mode of operation”
Produce a useful deliverable
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN02
03 August 2010
5
Decisions to be made at kick-off Decide details of Scope and Work Plan for 2010
Decide on workshop on ISO19906
Outline of Work Plan for 2011
Decide how we will work
Distribute assignments
Degree of involvement and choice of external verifiers
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN02
03 August 2010
6