Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

30
Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA Yu.A.Murin LHEP JINR Yu.A.Murin, Kuokola, 25 June, 20

description

Yu.A.Murin LHEP JINR. Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA. Yu.A.Murin, Kuokola, 25 June, 2013. Global tasks of heavy ion high energy physics. Deconfined matter Chiral symmetry restoration Magnetic fields up to 10 18 G - PowerPoint PPT Presentation

Transcript of Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Page 1: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR,

Germany and MPD setup of NICA

Yu.A.MurinLHEP JINR

Yu.A.Murin, Kuokola, 25 June, 2013

Page 2: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Global tasks of heavy ion high energy physics

BM_N@

JINR

RHIC@BNL

MPD@

NICA-

JINR

CBM@

FAIR

ALICE@CERN

Yu.A.Murin, Kuokola, 25 June, 2013

Deconfined matter Confined matter

Spinodial decay ?

• Deconfined matter • Chiral symmetry restoration• Magnetic fields up to 1018 G• Strange matter continent

(“new hypernucler physics”)

Page 3: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Two major objectives to study heavy-ion collisions at intermediate energies

Deconfinement through SDNew Hypernuclear Physics

SIS-300 and NICA task

SIS-100 (FAIR) and Nuclotron-M (NICA) tasks

Superdense nuclear matter

Yu.A.Murin, Kuokola, 25 June, 2013

Page 4: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

4

Energy region covered by the LHEP and GSI facilities(in deutron energy, recalculated for Elab )

5 10 15 40 60 80 Elab , GeV/u

2015

2017

2018

2020

SIS-18 (GSI)

Nuclotron-N (JINR)

Booster (LHEP)

Collider NICA (JINR)

SIS-100 (FAIR)

SIS-300 (FAIR)

fixed target colliders

operational

Yea

r o

f p

utt

ing

in

op

erat

ion

RHIC & LHC(BNL, CERN)

Yu.A.Murin, Kuokola, 25 June, 2013

Page 5: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

UNILAC

SIS18 SIS100/300p-Linac

HESR

CR &RESR

NESR100 m

Primary Beams

• 1012/s; 1.5 GeV/u; 238U28+

• 1010/s 238U73+ up to 35 GeV/u• 3x1013/s 30 GeV protons

Storage and Cooler Rings• radioactive beams

• 1011 antiprotons 1.5 - 15 GeV/c,

stored and cooled

Secondary Beams• range of radioactive beams up to 1.5 - 2 GeV/u; up to factor 10 000 higher in intensity than presently • antiprotons 3 - 30 GeV

Technical Challenges• cooled beams • rapid cycling superconducting magnets• dynamical vacuum

SIS100: Au 11 A GeVSIS300: Au 35 A GeV

APPA

The Facility for Antiproton and Ion Research FAIR

Yu.A.Murin, Kuokola, 25 June, 2013

Page 6: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Modul 0SIS100

Modul 1CBM,APPA

Modul 3Antiproton-target, CR,p-Linac, HESR

Modul 2Super-FRS

The Facility for Antiproton and Ion Research FAIR

Yu.A.Murin, Kuokola, 25 June, 2013

Page 7: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Yu.A.Murin, Kuokola, 25 June, 2013

Page 8: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

STS

JINR-GSI coop.

Yu.A.Murin, Kuokola, 25 June, 2013

LHEP plans for new facilities within NICA megaproject

Page 9: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

The BM@N experiment project The BM@N experiment project • measurements of the multistrange objects (Ξ, Ω, exotics)

& hypernuclei in HI collisions

• close to the threshold production in the region of high sensitivity to the models prediction

GIBS magnet (SP-41)

TS-target station, T0- start diamond detector,

STS - silicon tracker, ST- straw tracker, DC- drift chambers, RPC- resistive plate chambers, ZDC- zero degree calorimeter, DTE – detector of tr. energy.

Yu.A.Murin, Kuokola, 25 June, 2013

Page 10: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

10

Beam EnergyIntensity

per cycle

p 4,5 GeV 21010

d 2,2 GeV 51011

12C6+ 300 MeV 71010

24Mg12+ 300 MeV 51010

40Ar18+ 300 MeV 61010

58Ni26+ 300 MeV 8109

84Kr34+ 0,3 -1 GeV 21010

124Xe48/42+ 0,3 -1 GeV 11010

181Ta61+ 1 GeV 2109

197Au65/79+ 3109

238U28+/73+

0,05-1 GeV 6109/21010

Beam

Nuclotron beam intensity (particle per cycle)

CurrentIon

source type

New ion source

+ booster

p 31010 Duoplasmotron

51012

d 31010 --- ,, --- 51012

4He 8108 --- ,, --- 11012

d 2108 SPI 11010

7Li 8108 Laser 51011

12C 1109 --- ,, --- 21011

24Mg 2107 --- ,, ---

14N1107

ESIS (“Krion-6T”)

51010

84Kr 1104 --- ,, --- 1109

124Xe 1104 --- ,, --- 1109

197Au - --- ,, --- 1109

HI beams of SIS18 (GSI) and Nuclotron (JINR)

Energy & Intensities, pcs per cycle

Page 11: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

The CBM experiment at FAIR

DipoleMagnet

Ring ImagingCherenkovDetector

SiliconTrackingSystem

Micro VertexDetector

Transition Radiation Detectors

Resistive Plate Chambers (TOF) Electro-

magneticCalorimeter

Projectile SpectatorDetector(Calorimeter)

Target

two configurations:

- electron-hadron - and muon setup

MuonDetection System

Yu.A.Murin, Kuokola, 25 June, 2013

Page 12: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

CBM(BM@N) STS design constraints• Coverage:

― rapitidies from center-of mass to close to beam

― aperture 2.5° < < 25° (less for BM_N)

• Momentum resolution ―δp/p 1% ― field integral 1 Tm, 8 tracking stations― 25 µm single-hit spatial resolution ― material budget per station ~1% X0

• No event pile-up― 10 MHz interaction rates― self-triggering read-out ― signal shaping time < 20 ns

• Efficient hit & track reconstruction close to 100% hit eff. > 95% track eff. for momenta >1 GeV/c

• Minimum granularity @ hit rates < 20 MHz/cm2

― maximum strip length compatible with hit occupancy and S/N performance

― largest read-out pitch compatible with the required spatial resolution

• Radiation hard sensors compatible with the CBM physics program

― 1 × 1013 neq/cm2 (SIS100)― 1 × 1014 neq/cm2 (SIS300)

• Integration, operation, maintenance― compatible with the confined space

in the dipole magnet

Yu.A.Murin, Kuokola, 25 June, 2013

Page 13: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

• Aperture: 2.5° < < 25° (some stations up to 38°).• 8 tracking stations between 0.3 m and 1 m downstream the target.• Built from double-sided silicon microstrip sensors in 3 sizes,

arranged in modules on a small number of different detector ladders. • Readout electronics outside of the physics aperture.

System concept

Yu.A.Murin, Kuokola, 25 June, 2013

Page 14: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Assessment of tracking stations – material budget

station 4

sensor: 0.3% X0

r/o cables: 2×0.11% X0

electronics

front view side view

Yu.A.Murin, Kuokola, 25 June, 2013

Page 15: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Assessment of tracking stations – sensor occupancy

sensor occupancy := ratio “nb. of hit strips : nb . of all strips“ in a sensor

station 1

Y/cm

Yu.A.Murin, Kuokola, 25 June, 2013

Page 16: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Assessment of tracking stations – hit cluster size

in station 4

mean: 2.7

distribution for full STS

cluster of strips := number of adjacent strips in a sensor that fire simultaneously

Yu.A.Murin, Kuokola, 25 June, 2013

Page 17: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Track reconstruction performance studies

momentum resolution

Ongoing layout improvements:

•aperture improvements to be done in some of the stations: better coverage around beam pipe

•optimize number and type of modules and their deployment in the stations

primary

secondary

track reconstruction efficiency

25 AGeV Au+Au central

Yu.A.Murin, Kuokola, 25 June, 2013

Page 18: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Au+Au, 8 AGeV

Physics performance studies – example hyperons

Au+Au, 25 AGeV

c several cm,decays just before/within STS

Yu.A.Murin, Kuokola, 25 June, 2013

Page 19: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

19

Hyperon and hypernuclei with STS with CBM-like STS at Nuclotron existing SP-42 magnet

H3 -

total efficiency 8% 2 %

central Au+Au collisions at 4 AGeV:

Silicon tracker: 8 stations microstrips (400 µm each) Strips with 50 µm pitch and 7,5o stereo angle full event reconstruction

Yu.A.Murin, Kuokola, 25 June, 2013

Page 20: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

NICA MPD-ITS

Th Computer model simulations by V.P.Kondratiev and N.Prokofiev, SPbSU

MPD ITS status

Yu.A.Murin, Kuokola, 25 June, 2013

Page 21: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

The need for modern fast and high precision instrumentation based on

microstrip sensors

Supermodule („the ladder“)=Sensitive modules on light weighedCF support frames with FEE in cooled containers at the rare ends

CBM/BM@N

NICA MPD

The Ladder

Yu.A.Murin, Kuokola, 25 June, 2013

Page 22: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

The CBM-MPD STS Consortium Since Nov 2008

Yu.A.Murin, Kuokola, 25 June, 2013

Page 23: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

23

CBM-MPD STS Consortium

• GSI, Darmstadt, Germany

• JINR, Dubna, Russia• IHEP, Protvino, Russia• MSU, Moscow, Russia• KRI, St.Petersburg, Russia• University, St.Petersburg• SE SRTIIE, Kharkov, Ukraine• NCPHEP, Minck,Belarus Rep.• PI AS, Prague,Czech Rep

• 8 institutes• 5 countries

• Components

• Modules assembly • Ladder assembly • Radiation tests• In-beam tests

• CBM in Darmstadt

MPD and BM@N in

Dubna

Yu.A.Murin, Kuokola, 25 June, 2013

Page 24: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Mechanics hardware:Punch@Mould Produced in SPb with a dozen CF space

frames manufactured @ CERN

Punch and Mold for production of true CBM supporting frames

Yu.A.Murin, Kuokola, 25 June, 2013

Page 25: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Demonstrators and prototypes

Yu.A.Murin, Kuokola, 25 June, 2013

Page 26: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

The CBM-MPD STS Consortium: change in sensor production policy – mixed DSSD

SSSD structure of STS (based on experience gotton!)

DSSD: German Party responsibility – CiS, Erfurt (62х62) + Hamamatsu, Japan (42х62), double metalization on P-side

SSSD-sandwich: the Consortium responsibilityHamamatsu, Japan (42х62), On-SemiConductor, Czech Rep. (62х62) + auxiliary chipcable (SE RTIIE) +RIMST,RF

Sensor development – involvement of Hamamatsu , Attepmpt to repeat at Vendors in

Russia, Belarusia, and Czeh Republics

Yu.A.Murin, Kuokola, 25 June, 2013

Usage of SINP MSU Si lab expertize ( Merkin M.M. et al)

Page 27: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Prototype Device for ladder assembling manufactured at PLANAR, Minsk , Rep. of

Belarus, 2012

Yu.A.Murin, Kuokola, 25 June, 2013

Page 28: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

The German forced change in tentative WP of the Consortium : TDR Jun 2013 –

Comissioning Oct 2017

Yu.A.Murin, Kuokola, 25 June, 2013

Page 29: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

•Equipment of JINR test bench with n-XYTER readout

•Mechanics preparation

•Slow Control for Protvino in-beam

•Logic Init for recording the external DAQ information into the ROC

Status: Preparations for the in-beam tests at Nuclotron

Preparations for the in-beam tests at Nuclotron

Yu.A.Murin, Kuokola, 25 June, 2013

Page 30: Large Area Fast Silicon Tracking Systems for CBM expriment at FAIR, Germany and MPD setup of NICA

Through years 2008-2013 the CBM-MPD STS Consortium demonstrated self-sustained growth of R& D activity which could be successfully accomplished within 1,5 -2 years

The Conclusions

In 2013 common GSI-JINR project started with resources (@around 3 M USD) released to develop corresponding infrastructure for massive production of modules and, especially, supermodules at LHEP JINR by mid-2015 for the BM@N and CBM STS projects, firstly, and NICA-MPD ITS, afterwards Young generation recruitment and training is the basic problem of the project to be discussed tomorrow in more details as well as more involvement of physicists from the Universities of both capitals of Russia

Thank you for your attention!Yu.A.Murin, Kuokola, 25 June, 2013