Language : English
Original : French
AFRICAN DEVELOPMENT BANK GROUP
PROJECT: JIJI AND MULEMBWE HYDROPOWER PLANTS DEVELOPMENT PROJECT
COUNTRY: BURUNDI
_____________________________________________________________________________
EXECUTIVE SUMMARY OF THE RESETTLEMENT PLANS
OF THE JIJI AND MULEMBWE PROJECTS
Project Team
Team
Leader Tanja Faller, Transport Economist ONEC2
Team Members:
Yousef Arfaoui, Chief Renewable Energy
Specialist ONEC3
Awatef SIALA FOURATI , Senior
Environmental Specialist ONEC3
Eloise FLUET, Senior Social Development
Specialist ONEC3
Ahmadou Moustapha Diallo, Senior
Procurement Officer Ext.
Aisha Mohamed Moussa, Senior Financial
Analyst ONEC2
DIOMANDE Mamadou, Financial
Management Specialist Ext.
AYISI-SALAWOU ADWOUA Legal
Consultant GECL1
Sector Division
Manager NEGASH ENGEDASOW ONEC2
Sector Director ALEX RUGUMBA ONEC
Regional Director GABRIEL NEGATU Ext.
2
Executive Summary of the Resettlement Plans
Jiji and Mulembwe Projects
Project name : JIJI AND MULEMBWE HYDROPOWER PLANTS
DEVELOPMENT PROJECT
Country : BURUNDI : ALGERIA, NIGER AND CHAD
Project Number : P-BI-FAO-100
1. Project Description
1.1 Description of the Jiji Hydropower Plant Project and Related Works:
The Jiji project is small-sized, with a 13.5-m high and run-of-river dam, that is, without a
significant reservoir. The impoundment is limited to 80,000 m3.
The production plant is located on the same river, about 2.5 km downstream of the dam. The
water is directed by a 710 m-long intake channel (buried), followed by a 1130 m-long
underground power tunnel and a 800m-long surface penstock (diameter, 1.8 m). The water
diversion produces the head height which, from the design flow, will produce the hydroelectric
power for the development. All the water flows into the dam up to 9 m3/s are diverted to the
water intake to be pumped through the turbines. Once pumped through the turbine, the water is
discharged back into the river. In addition, all flow rates above 9 m3/s are returned to the river.
In order that the stretch of river between the dam and the plant (2,500 m) does not dry up, there
are plans to install pumping equipment at the dam to ensure a minimum firm yield of 0.328 m3/s
at any time in this section.
The project characteristics are:
- Design flow: 9 m3/s
- Length of intake channel: 700 m of underground pipe
- Length of gallery: 1130 m with surge chamber
- Turbine height: 439 m (free fall)
- Installed capacity 31.5 MW
- Estimated production: 146.5 GWh/year
Other components of the project include the establishment of a base camp to accommodate
operating personnel after construction and various access roads, including the rehabilitation of
17.25 km of existing track roads (for access to the dam and plant) and the construction of 7.6 km
of new roads.
1.2 Description of the Jiji Hydropower Plant Project and Related Works:
The Mulembwé project is small-sized, with a less than 15-m high and run-of-river dam
(therefore not classified as a large dam), i.e. without a significant reservoir (limited to 50,000 m3
only). All the water flows into the dam up to 8 m3/s are diverted to the water intake to be
3
pumped through the turbines. In addition, all flow rates above 8 m3/s are pumped back into the
river.
The production plant is located on the same river, about 1.5 km downstream of the dam. Water
flows in through a 1.13 km-long underground intake tunnel (2.8m diameter) followed by a
600m-long surface penstock (diameter, 1.6 m).
In order that the stretch of river between the dam and the plant (1,500 m) does not dry up, there
are plans for pumping equipment at the dam to ensure a minimum firm yield of 0.424 m3/s at
any time in this section.
Other components of the project include the establishment of a base camp to accommodate
operating personnel after construction and various access roads, including the rehabilitation of 2
km of existing track roads (for access to the dam site) and the construction of 10.75 km of new
roads.
The project characteristics are:
- Design flow: 8 m3/s
- Length of intake channel: 600 m of buried pipe
- Length of gallery: 1130 m with surge chamber
- Turbine height: 258 m (free fall)
- Installed capacity 16.5 MW
- Estimated production: 90.5 GWh/year
2. Legal framework
2.1 At National Level
2.1.1 Burundi's new Land Code Law No. 1/13 of 9 August 2011 amending Burundi's Land
Code culminated in the "new Land Code," with major changes to its predecessor of 1986.
Accordingly, it provides for the formalization of unwritten rights and also defines the various
regulations, principles and legal regimes that govern them. The new Code establishes the
National Land Commission.
2.1.2 Provisional Declaration of Public Utility (PDPU): The PDPU lays down the stages
involved in the expropriation preparation and decision. It is published and submitted to the
appreciation of population and PAPs to elicit their support and involvement in all phases of the
resettlement process.
2.1.3 Expropriation Decree or Ordinance: This decree lays down all stages of loss
assessment and acceptance by project affected persons. It will be posted at the offices of the
municipalities and Ministry concerned, and published in Burundi's Official Gazette. It will then
be notified to those concerned through meetings with project affected persons to inform them of
their options, including redress, acceptance or not of one of the options proposed.
4
2.1.4 Ministerial Order No. 720/CAB/304/2008: Ministerial Ordinance No.
720/CAB/304/2008 of 20/3/2008 lays down the compensation rates for lands, crops and
buildings in the event of expropriation for public utility.
2.2 For Donors:
2.2.1 The Resettlement Action Plans are elaborated in compliance with the applicable
policies: (i) the African Development Bank's Involuntary Resettlement Policy (2003), the World
Bank's Operational Policy 4.12, and (iii) EIB procedures. In case of discrepancies between the
policies of donors, the more stringent requirements will be applied. The guiding principles of
donor resettlement policies are similar. They aim to avoid or minimize population displacement
or relocation and, when these are unavoidable, seek to improve their livelihoods and living
standards.
2.2.3 For all donors, summary resettlement plans are acceptable when the impacts are
"minor", or if less than 200 persons are displaced for the project needs. Considered globally
within the framework of this project (Jiji and Mulembwe hydropower projects and the 110 kv
transmission line for energy transportation to Bujumbura), the number of displaced persons
exceeds 200 and the impacts cannot be described as "minor". Thus, the preparation and approval
of a Resettlement Action Plan (RAP) is a prerequisite for project financing.
2.3 Comparison between national legislation and donor requirements: The following
table presents the similarities and differences between Burundian law and donor resettlement
policies.
TABLE 1
COMPARISON BETWEEN THE NATIONAL LEGAL FRAMEWORK AND DONOR POLICIES
PAP
CATEGORY/
LOSS TYPE
BURUNDIAN LAW DONOR POLICIES OPTION CHOSEN
Landowners
Monetary compensation based on
market value
Compensation in kind (land)
according to customary rules
Preference for compensation
in kind (land)
Other compensation at
replacement cost of lost assets
Implementation of donor policies
Compensation rates will be
determined according to the
provisions set out in this RAP
Land tenants Entitlement to compensation based
on the number of vested rights
Entitlement to compensation
regardless of the legal
recognition of their occupation
Implementation of donor policies
Compensation rates will be
determined according to the
provisions set out in this RAP
Land users
In some cases, land users are
entitled to property by extension
(regular use)
In other cases, land users are
entitled to compensation for crops
and all other economic activities
Rights to compensation for
loss of crops and possibly land
and income need to be
established for users
Implementation of donor policies
Compensation rates will be
determined according to the
provisions set out in this RAP
Owners of
"non-
permanent"
buildings
Monetary compensation based on
market value
Entitlement to compensation
in kind (building) or monetary
compensation at total
replacement cost, including
the cost of labour and
resettlement, prior to
relocation
Implementation of donor policies
Compensation rates will be
determined according to the
provisions set out in this RAP
5
PAP
CATEGORY/
LOSS TYPE
BURUNDIAN LAW DONOR POLICIES OPTION CHOSEN
Owners of
"permanent"
buildings
Monetary compensation based on
market value
Entitlement to compensation
in kind (building) or monetary
compensation at total
replacement cost, including
the cost of labour and
resettlement, prior to
relocation
Implementation of donor policies
Compensation rates will be
determined according to the
provisions set out in this RAP
Annual/pere
nnial crops
Monetary compensation based on
market rates
Compensation at full
replacement value of the crop
considered (taking into
account the value of the plant,
the work necessary to restore
the crop and the loss of
earnings during the period
necessary for re-establishing
the market value of the
product in question)
Implementation of donor policies
Compensation rates will be
determined according to the
provisions set out in this RAP
6
3. Institutional Framework
3.1 Ministries
3.1.1 Ministry of Energy and Mines (MEM): Responsible for implementing and monitoring
Government's policy on the country's energy infrastructure equipment and mining development,
it is the Contracting Authority for the construction of the Mulembwe and Jiji hydropower
development projects.
3.1.2 Ministry of Water, Environment, Regional Development and Urban Planning
(MEEATU): This Ministry is responsible for the design and implementation of Government
policy on land use and urban development, through its various directorates and services. Within
the framework of this project, it is in charge of developing the platform to accommodate all
persons to be resettled.
3.1.3 Ministry of Transport, Public Works and Equipment (MTTPE): This Ministry
conducts all operations related to the development of roads and tracks nationwide. Within the
framework of this project, it is responsible for the development of linear components (roads,
etc.).
3.2 Administrative Structures
3.2.1 REGIDESO: Within the framework of the project, Burundi's Water and Power
Production and Distribution Corporation will be the Delegated Project Management Authority.
3.2.2 Resettlement Committee: The Resettlement Committee will comprise members of
government, local authorities and PAP. It will determine compensation and support measures,
and organize resettlement. The Resettlement Committee will conduct information and
communication operations to publicize the various RAP components and the options available to
affected persons as well as receive feedback and suggestions.
3.2.3 Land Commission: The Land Commission will assess the compensation and review the
RAP based on the findings of public compensation budgeting consultations. It will be
responsible for forwarding the finalized RAP to regional authorities (area managers, community
leaders [chefs des collines]), to the Minister, and to the Minister of Finance for approval by the
project's supervisory Ministr(y)ies, the Ministry of Finance, the World Bank.
4. Eligibility and Entitlement to Compensation
4.1 Eligibility: Any person whose property or livelihood is adversely affected by the
project's implementation, be it through physical displacement (loss of home or business) or
economic displacement (loss of part or all property, assets and sources of income), identified
before the cut-off date. Specifically, eligible persons will include the following:
- Those who have written evidence of their rights to land prior to the cut-off date
according to the land or customary code: title, proof of purchase, administrative
documents, purchase deeds, deeds of sale by landlords, etc.
- Those who do not have written evidence, but have claims to the land prior to the
cut-off date and who are so recognized by customary law. These are entitled
7
customary landowners who, without land titles or deeds of sale or purchase, are
recognized as legitimate owners by customary and/or local administrative
authorities.
- Tenants who, prior to the cut-off date, are occupying houses, commercial
premises or land with written evidence.
- Tenants who, prior to the cut-off date, are occupying houses, commercial
premises or land without written evidence.
4.2 Cut-off Date: The cut-off date for eligibility to compensation is set at 1 month after
the date of posting of the provisional PAP list. Any person concerned, who is absent or not on
the list or with claims may contact the Sector Head during this period. REGIDESO will decide
on the posting, depending on the progress of the project schedule. Beyond this date, no new
occupation or use of land or resource affected by the Project will be subject to compensation.
4.3 Entitlement to Compensation: For two-parent families, both spouses will be
considered as entitled to a single financial compensation and there is provision for both of them
to benefit from livelihood restoration actions; respective procedures (for instance the signing of
compensation agreements) must be performed in the presence of both spouses. For single-parent
families, the rights will be in a single person's name, that of the head of household. The financial
compensation process should be monitored (see Section 17 on the monitoring and evaluation
mechanism) to ascertain that the money benefits the entire household.
5. Project Impacts in Relation to Involuntary Resettlement
5.1 Summary of Assets and PAPs Affected: Land needs for the project are 75.9 ha.
According to estimates of the resettlement plans for the Jiji and Mulembwe projects, the
project will cause the involuntary resettlement of 724 households, representing 4,749 persons.
This is mainly economic resettlement, given that physical resettlement is limited to less than 200
households.
TABLE 2
SUMMARY OF AFFECTED PERSONS No. of households No. of Persons
Jiji Site 341 2,237
Mulembwe Site 383 2,512
Total 724 4,749
8
TABLE 3
FOR THE TWO SITES: SUMMARY OF ASSETS AFFECTED
Item Non-linear Linear and
undefined Total
Surface area affected by project components 13.01 ha 52.57 ha 65.45
Number of households affected 262 465 724
Number of persons affected 1718 3,031 4,479
Number of households with more than 30% of
assets affected 159 255 414
Surface area of land assets affected 12.95 52.7 65.6
Farmland size of annual crops affected 14.67 59 71
Number of crops lost 8,442 34,040 42,522
Number of houses destroyed 22 89 111
Field survey results (PAP identification and census of assets affected by the non-linear components
of the project for each PAP)
Estimates made on the basis of ratio by surface or PAP (PAP identification, but no census of assets
affected for each PAP). These ratios were established during surveys of PAPs affected by the non-
linear components
5.2 Impact of Non-Linear Components
5.2.1 For the non-linear component, the number of PAP represents 262 households. The
same household could have several assets affected by the project.
5.2.2 Loss of land: Less than 13 hectares will be subject to expropriation for non-linear
components, which include the dams’ reservoirs. These hectares are shared among 227
households, which confirms the high fragmentation of land in the area (as is the case all over
Burundi).
5.2.3 Annual and perennial crops: Agricultural losses include both annual crops (cassava,
beans, maize, potato, onion, etc.) and perennial crops (citrus, banana, mango, avocado trees,
etc.).
9
TABLE 4
ANNUAL CROPS AFFECTED BY NON-LINEAR COMPONENTS
CROPS NO. OF HOUSEHOLDS
AFFECTED
FARMLAND SIZE TO BE
COMPENSATED (ARE)
JIJI PROJECT
Cassava 591 321
Beans 9 48
Combination of several crops:
eggplant, taro, corn, cassava, onion,
sweet potato, leek, Irish potato and
tomato
62 284
Other uses (perennial or non-
agricultural crops) 52 144
Subtotal Jiji 124 797
Mulembwe PROJECT
Cassava 47 243.3
Beans 5 20.5
Combination of several crops:
eggplant, taro, corn, cassava, onion,
sweet potato, leek, Irish potato and
tomato
28 128.1
Other uses (perennial or non-
agricultural crops) 17 279.3
Subtotal Mulembwe 97 671.2
TOTAL 221 1,468.2 1 Figures are rounded to the nearest unit (are or percentage). 2 Excluding duplicates. 3 For the record, the area of
linear components is 6.9 hectares. The gap corresponds to uncertainties and safety margins when estimating the
surface areas to be compensated per PAP.
TABLE 5
PERENNIAL CROPS AFFECTED BY NON-LINEAR COMPONENTS
CROPS NUMBER OF HOUSEHOLDS
AFFECTED
NUMBER OF CROP TREES
COMPENSATED (LOSSES)
Jiji Project
Banana tree 57 1,253
Coffee tree 12 517
Palm tree 59 410
Avocado tree 5 7
Mango tree 1 1
Subtotal for Jiji 112* 4,897
Mulembwe Project
Banana tree 42 2604
Coffee tree 9 664
Palm tree 25 245
Avocado tree 4 9
Mango tree 2 17
Subtotal for Mulembwe 55* 3,545
TOTAL 167 8,442
*Excluding duplicates.
10
5.2.4 Trees (timber): The trees observed are mainly eucalyptus and pinus.
TABLE 6
TREES AFFECTED BY NON-LINEAR COMPONENTS
(TIMBER AND FIREWOOD)
NUMBER OF CROP TREES
LOST
NUMBER OF HOUSEHOLDS AFFECTED
Jiji Site 138 16
Mulembwe Site 454 22
TOTAL 595 38
5.2.5 Constructions: Buildings affected by the non-linear component are detailed in the table
below. It should also be noted that the project will necessitate temporary relocation of the
primary school situated near the Jiji dam site.
TABLE 7
HOMES AND OTHER STRUCTURES TO BE COMPENSATED
NO. OF TOTAL
CONSTRUCTIONS TO
BE COMPENSATED
BUILDING AREA (M2 )
Jiji Site 18 749
Mulembwe Site 4 120
TOTAL 22 869
5.3 Linear and Undefined Components
A first estimation of the number of PAPs affected by the linear and non-defined components of
the two facilities (e.g. road building, workers camps, quoted operating) was conducted during the
elaboration of these RAPs. The final census, which will determine the number of PAPs affected
by these components will be conducted once the detailed designs of roads and the location of
camps / cities are finalized.
Guiding Principle: As specified in the Involuntary Resettlement Policy of the African
Development Bank, when finalizing the layout of roads and site selection for workers ‘camps,
borrow areas, the goal will be to avoid involuntary resettlement to the extent possible.
5.3.1 Methodology: Estimation of the assets affected by linear and undefined components of
the project is based on the following two assumptions:
The basic reasonable assumption is that the average compensation cost per unit
surface area affected is the same for the linear and non-linear components.
This assumption also means that the proportion of vulnerable persons is the same
for linear and non-linear components.
The surface areas affected by linear components were calculated on the basis of:
A permanent 4 meter-wide right-of-way for roads;
11
A permanent 2-meter easement for penstocks;
A temporary 2-meter right-of-way on both sides of roads or penstocks for the
passage of equipment;
An 8-hectare right-of-way for currently undefined project components for each
site, but which will occupy a surface area to be taken into account: (i) road
embankments in steep areas, (ii) quarry or borrow areas, (iii) dump sites for
excavated and other materials, and (iv) temporary workers' camps.
5.3.2 Determination of number of PAPs affected: There are 465 PAPs affected by the linear
components. The tables below show the breakdown with respect to works and property affected.
TABLE 8
BREAKDOWN OF PAPS FOR THE JIJI PROJECT Component Number of households
Penstocks 14
Road 1 39
Road 2 37
Road 3 41
Road 4 23
Road 5 25
Total Jiji 179
TABLE 9
BREAKDOWN OF PAPS FOR THE MULEMBWE PROJECT Component Number of households
Penstocks 8
Road 1 70
Road 2 55
Road 3 98
Road 4 55
Total Mulembwe 286
Table 10
Estimated Impacts of Non-Linear and Undefined Components for Jiji and Mulembwe Potential losses Jiji Site Mulembwe Site Total
Homes (No.) 73 16 89
Surface area of land assets affected (ha) 28 25 53
Number of households whose land assets are affected 154 233 387
Farmland size of annual crops affected (ha) 32 27 59
Number of households having lost annual crops 132 245 377
Number of perennial crop trees lost 19,831 14,249 34,080
Number of households having lost perennial crops 119 162 281
5.4 Other Impacts
5.4.1 Impacts on Social Facilities: Only one impact on social facilities (schools, health
centre, administrative building) was identified. This is the primary school near the Jiji site, which
will have to be moved temporarily. The school will be moved to a temporary site and rebuilt at
its original location with durable materials. The budget required based on 100 m2
is FIB
11,000,000. It is included in the ESMP.
12
5.4.2 Impacts on Cultural and Sacred Sites: No sites of cultural value (historical,
archaeological or religious), sacred sites or tombs were identified in the project area during field
visits or reported by residents. However, in case of accidental discovery during excavation, a
procedure for immediate cessation of work will be implemented in conjunction with Burundi's
Interior Ministry and local authorities to secure and preserve any physical cultural resource
discovered. Whenever necessary, in case of discovery of a tomb, the inhabitants will be allowed
the opportunity to move the latter.
5.4.3 If a PAP is deprived of a significant part of his or her assets, alternatives to financial
compensation such as compensation in kind should be considered (e.g. land for land, house
reconstruction, etc…).
13
5.4.3 Number of PAP significantly affected (more than 30% of their assets): For the non-
linear component, the number of PAPs with over 30% of their assets affected is 159 (114 for Jiji
and 45 for Mulembwe). PAPs significantly affected will benefit from additional compensation
measures and special assistance (see Section 6 below).
6. Vulnerable Persons
6.1 Eligibility Criteria:
The various categories of vulnerable persons proposed in the RAP are defined as described
below:
The poorest households, headed by persons without or almost without resources
(less than FIB 30,000 monthly income), i.e. those who cannot meet their needs.
Female heads of household farming on land at their disposal (usufruct) and/or
dependent on relatives (children, siblings, parents, etc.) for their income.
Children heads of households (orphans): these children are particularly
vulnerable and need special assistance to manage the compensation that could be
paid to them or used for their resettlement. The measures taken shall ensure in
particular that ties (if they exist) with relatives and neighbours offering them
support are maintained and that the resettlement offers them the same or
preferably improved conditions of access to social services (especially education)
compared to their current situation.
The elderly, particularly those living alone: they also often depend on their
relatives and/or neighbours to help them farm their lands or meet their needs.
Resettlement measures should provide them benefits similar to the pre-relocation
situation.
Farmers: they are vulnerable because they depend on seasonal farming, have
very few resources and limited access to land.
Physically (war) or mentally challenged, who depend on others to meet their
needs and are especially more vulnerable to any change in their lifestyle.
The sick (including those with HIV/AIDS or other serious or incurable diseases)
that are also particularly vulnerable to any change in their lifestyle and for whom
resettlement must consider access to health services and facilities (in conditions
similar to, or better than, the pre-relocation situation).
6.2 Valuation of the Number of Vulnerable PAPs
The number of vulnerable PAPs is estimated at 260. Whereas vulnerable PAPs were
specifically identified for non-linear components (see Table 11 below), the figure proposed for
non-linear and undefined components is based on the reasonable assumption that the proportion
of vulnerable PAPs is the same both for linear and non-linear components. Using the same
proportion, there would be 169 vulnerable PAPs for the linear components (57 for Jiji and 112
for Mulembwe).
14
Table 11
Vulnerable PAPs for Non-linear Components
Component No. of vulnerable PAPs
(Jiji)
No. of vulnerable PAPs
(Mulembwe)
Total
Dam and reservoir 26 3 29
Buried channel 8 8
Plant 4 8 12
Base camp 10 27 37
Transmission line 5 5
Total 53 38 91
7. Brief Socio-economic Analysis
7.1 Livelihood of PAPs
7.1.1 Agriculture: As is the case over the entire Burundian territory, subsistence farming is
predominant in the Songa and Buyengero municipalities. It hinges on a traditional farming
system based on a combination of crops, with very limited access to inputs, rudimentary tools
and almost no storage system. Land fragmentation, soil degradation and the inability to allow the
land to fallow (due to land pressure) are additional factors explaining low agricultural yields. It
should be noted that cassava is the most important subsistence crop and is vital to the food
security of the local population.
7.1.2 Livestock and Fisheries: The area is characterized by a strong pastoral tradition,
especially in the Buyengero municipality. The extensive system is the main mode of animal
production, but semi-intensive systems are beginning to develop as a result of population
pressure and the need to mix livestock and agriculture in order to restore and maintain soil
fertility. Compared to cattle rearing, other livestock types are marginal. Pig breeding is rare but
does exist. Poultry farming systems are exclusively based on the traditional system (free-range
hens).
7.1.3 Trade, Industry and Crafts: Rural markets (numbering 4 and 5 respectively in the
Buyengero and Songa municipal councils), cabarets and shops are the main areas of commercial
activity. The key products are food and household items. There are no industrial facilities in the
Buyengero and Songa municipalities, with the exception of three small coffee pulping and
washing units. Handicraft is not developed and is limited to two municipal councils with thirty
carpentry workshops, about sixty brickyards, some bakeries and garages.
7.2 Access to Basic Facilities and Services:
7.2.1 Health: The Buyengero municipality has 2 health centres located in the Muyama and
Muzenga areas. The Songa municipality has 4 health centres located in the Muheka, Kiryama,
Ndago and Songa areas. There is a regional hospital at the level of the province. Malaria is the
most prevalent disease in the two municipalities, followed by acute respiratory infections and
diarrhoeal diseases.
7.2.2 Education: The Buyengero and Songa municipalities have 71 complete functional
primary schools. They total 274 classrooms and 130,170 pupils, of which approximately 45%
girls. Pupil-per-classroom ratios show slight variations between 60 and 79 between the zones.
Pupil-teacher ratios are more balanced among zones with ratios between 26 and 37. The average
primary school drop-out rate is 3.10%, while repetition rate stands at 30.7%. Twelve secondary
schools, of which 2 are full-cycle, are functional in the Buyengero and Songa municipalities.
15
They total 89 classrooms and 1,421 pupils, of which approximately 37% girls. The average
secondary school drop-out rate is 0.6%, while repetition rate stands at 2.9%. There is only one
vocational technical school in the Songa, with an enrolment of 821 students, of which 14.4%
girls.
7.2.3 Household energy: The Buyengero municipality gets electricity from the Manga plant
and the Mugamba-Tora-Buyengero 30 kW medium voltage line. In addition to the medium
voltage lines, Buyengero has some standby generators used in the headquarters of the
municipality in the event of power failure. The Songa municipality is connected by the Kiryama-
Rumeza line. For want of sufficient hydropower, firewood is an important energy source in the
two municipalities. Coal is rarely used.
7.2.4 Drinking water: The Songa and Bunyengero municipalities each have several hundred
water points managed by the Municipal Water Authority (RCE). These water sources include
harnessed water sources, standpipes and private connections, a number of which are not working.
Each household has access to a water point within 500 meters of home.
7.2.5 Transport and access roads: The asphalted sections of road infrastructure are in good
condition. However, all dirt and rural roads are in very poor condition, which is an inaccessibility
factor for certain areas of the municipality and a major handicap for trade with neighbouring
municipalities.
8. Loss Valuation and Compensation
8.1 Calculation Method According to National Legislation
8.1.1 Provisions of the Ordinance Updating Compensation Rates (2008): In Burundi, the
provisions on land expropriation for public utility are governed by the Land Code and
supplemented by Ministerial Order No 720/CAB/304/2008 20/03/2008 updating the
compensation rates for land, crops and buildings in case of expropriation for public utility (the
Ordinance). This order establishes procedures for calculating compensation, using formulas
adapted and applied to annual and biennial food crops, perennial crops (banana, coffee, tea, etc.)
and constructions.
8.2 Basis of Valuation Chosen
8.2.1 Lands: Lands were assessed based on a workshop held on 18 October 2013 in
Bujumbura with REGIDESO, representatives of institutions and representatives of inhabitants
living around the Jiji and Mulembwe rivers. The participants highlighted the shortcomings of the
2008 Ordinance and indicated that the rates depend on several factors: slope, soil quality,
existing relationships between the buyer and seller, etc. Land is generally sold among people of
the same family and rarely to a third party outside the family circle; where this is the case, the
price can be much higher than for intra-family land transactions. In the project area, participants
were of the opinion that the price of farmland on steep slopes and with poor soil quality stood at
around FIB 2,500/m2, and good quality agricultural land on a mild slope and with rich soils
could go up to FIB 5,000/m2. The working group's proposal is to adopt a median price of
FIB 4,000/m2 and, accordingly, this is the unit rate of farmland used in this RAP.
16
8.2.2 Homesteads: The compensation price per m2 of buildings is determined on the basis of
a typical building (brick walls, ceiling batts). The price of the built square meter was estimated at
FIB 146,200 (based on the price of a semi-durable house of FIB 60,000 pursuant to the 2008
Ordinance but increased by an inflation rate of 16% over 6 years - that is, about 2.5 times the
base value of 2008), namely:
FIB 4,385,000 for a building of 30 m2
FIB 8,700,000 for a building of 60 m2
FIB 14,600,000 for a building of 100 m2
8.2.3 Annual crops: Compensation rates for annual crops were estimated based on the rates
specified in Order No. 720/CAB/304/2008 20/03/2008, taking into account an annual inflation
rate of 16% over the 2008-2014 period (6 years), which is equivalent to about the initial value of
2008 multiplied by 2.5. If new crops are identified at the time of final implementation of the
RAP, their rates would be calculated on this basis, factoring in inflation. This method allows for
a valuation close to, or slightly higher than market rates (depending on the crop).
TABLE 11
UNIT PRICE OF ANNUAL CROP TREES Crops identified during the socio-economic surveys of
2011, 2012 and 2013 Price/are (in FIB)
Cassava 66,367
Beans 15,788
Taro 43,504
Onion 72,819
Maize 17,542
Leek 55,901
Sweet potato 35,279
Cabbage 36,254
Tomato 203,488
Egg plant 112,464
8.2.4 Perennial crops: The compensation rates for perennial crops were also estimated based
on the rates specified in the Ordinance of 2008, taking into account an annual inflation rate of
16%.
TABLE 12
UNIT PRICE OF PERENNIAL CROP TREES
Type of crop Coffee tree Banana tree Avocado tree Mango tree Palm tree
Unit price per crop
(BIF) 3,360 14,009 32,553 59,204 126,388
17
8.2.5 Trees (timber): The compensation for trees (pinus and eucalyptus are the predominant
species) is based on the "softwood lumber and timber" table of the 2008 Ordinance, taking into
account inflation rate of 16% over 6 years (over the 2008-2013 period) and considering an
average diameter of between 30 and 59 cm. The unit price (per tree) was thus estimated at BIF
3,300.
9. Additional Resettlement and Livelihood Restoration Measures
Implementation of the RAP includes a set of measures in addition to compensation and
assistance as outlined in the previous sections. These measures aim to satisfy the requirement
that the project ought to improve the general living conditions of persons affected.
9.1 Livelihood Improvement Measures (M1)
9.1.1 A small Farmers' Organization (FO) adapted to the status of PAP will be
established to coordinate and stimulate the economic agricultural activities handled by men
as well as those handled by women. Considering the population density and very low offer of
farmland for sale in the region, it is unlikely that the PAPs losing farmlands will find others
through financial compensation.
9.1.3 The FO will propose and promote the following initiatives:
Training farmers in new agricultural practices for better yields;
Pooling the purchase of farm inputs in bulk to benefit from better prices;
Research on high-yield seeds and plants;
Pooling of resources to access the best markets for agricultural products.
9.1.4 The budget required is estimated based on the following principles:
The budget is to be allocated between the Jiji project (40%), Mulembwe project
(40%) and HT lines (20%)
Project duration: 5 years
Full-time positions for Burundians: (i) one manager (BIF 15,000/day), (ii) one
secretary (10,000 BIF/day), (iii) three agronomists (BIF 15,000/day), (iv) two
supervisors (10,000 BIF/day). That totals BIF 165,000,000 over five years.
A utility vehicle for the unit and its operation over 5 years: BIF 50,000,000
The visit of an international expert ten days every year for 5 years: BIF
150,000,000
A non-salary operating budget of BIF 10,000,000 per year over 5 years
An investment budget of BIF 50,000,000 per year over 5 years (nurseries, plants,
seeds, tools, soil improvements, ...)
18
Total: BIF 665,000,000 to be broken down as follow:
– Jiji hydropower project BIF 266,000,000
– Mulembwe hydropower project BIF 266,000,000
– Power lines project: BIF 133,000,000
9.2 NGO Support during the Resettlement Process (M2)
9.2.1 All PAPs will be assisted, if they so desire, during the resettlement process by a local,
national or international NGO (to be identified before the start of the project), whose operation
will be covered by a budget included in this RAP. This NGO will be supported by the services
and mediation of local facilitators. Assistance may take the form of:
Training/sensitization on the use of compensation (NGO);
Assistance for land search and price negotiation;
Assistance in the opening of postal accounts (or in credit agencies such as the
Savings and Credit Cooperative - SACCO) for vulnerable PAPs, primarily those
for whom the compensation amount will be high.
And in general:
– Implementation of actions for the protection of vulnerable persons;
– Implementation of actions to ensure that women receive equal treatment in
access to compensation and technical assistance measures. 9.2.2 The budget required is estimated below:
The budget to be allocated between the Jiji project (40%), Mulembwe project
(40%) and HT lines (20%).
Project duration: 5 years;
Full-time positions for Burundians: (i) one manager (BIF 15,000/day), (ii) one
secretary (BIF 10,000 /day), (iii) one specialist in land tenure law (BIF
15,000/day), 5 field facilitators (BIF 10,000 /day). That totals roughly BIF
165,000,000 over five years.
A utility vehicle for the unit and its operation over 5 years: BIF 50,000,000:
A non-salary operating budget of 10,000,000 per year over 5 years;
Total: BIF 265,000,000 to be distributed as follows:
– Jiji hydropower project BIF 106,000,000
– Mulembwé hydropower project BIF 106,000,000
– Power lines project: BIF 53,000,000
19
9.3 Food Aid for the Transition Period (M3): There is provision for food support to assist
identified vulnerable PAP and tenants. Each family (regardless of the number of children per
family), over a period of six months, will receive per day on average: 2 kg of cassava, 500 g of
beans, 500 g of meat, ¼ litre of oil and 250 g of sugar. Based on 2013 prices adjusted at a 16%
inflation rate for 2014, the fixed amount per day is BIF 5,500, i.e. food aid to the tune of BIF
990,000 over 6 months.
9.4 General Assistance to Resettlement and Arrangements Regarding all PAPs (M4):
This measure covers a range of costs caused by the several arrangements attendant to the
successful conduct of the resettlement. The amount is set at BIF 17,000/PAP.
9.5 Training in financial management (M5): From experience, the payment of financial
compensation can generate unintended negative effects, especially for women and children. To
minimize these adverse effects of sudden cash availability within the household, the project will
provide training on the rational use and management of compensation prior to any compensation
payment. The budget required is BIF 35,000 per household.
9.6 Additional Measures: Rural Electrification This measure aims to improve the living
conditions of inhabitants of the project area. It is a major factor for social acceptability of the
project. Rural electrification costs will be included in the project budget and does not represent a
specific expenditure item in this RAP.
20
TABLE 13
COMPENSATION MATRIX
# PAP
ASSET
AFFECTED/TY
PE OF LOSS
ENTITLEMENTS
COMPENSATION
TRAINING
PROGRAMME FOR
RESTORATION OF
LIVELIHOODS
1 Owner
Homesteads/
Residential
structures
Option 1: Resettlement
Allocation of residential land on agreed resettlement site, with land title
Reconstruction of a homestead of at least similar quality to original homestead
and compensation at replacement cost for each item that could not be included in the replacement
home
Resettlement assistance: resettlement allowance and payment of transaction costs
Training in
household finance
management
If the PAP loses
farmland, he/she
should also benefit
from the livelihoods
restoration
programme
Training in
household finance
management
If the PAP loses
farmland, he/she
should also benefit
from the livelihoods
restoration
programme
Training in
household finance
management
Participation in the
livelihoods
restoration
programme
Option 2: Financial compensation
Financial compensation at replacement cost for the loss of housing
Financial compensation for the loss of the land on which the homestead is located, at replacement cost
Financial compensation at replacement cost for the loss of other elements
Financial compensation at replacement cost for the permanent loss of crops in the homestead's garden
Plus all transaction costs
2 Owner Farmlands
Compensation at replacement cost or land allocation at an acceptable distance from the homestead and
having at least an equivalent yield
Compensation for loss of trees and perennial crops and replacement cost
Compensation for the loss of seasonal crops at market prices
Compensation for any development carried out on land at replacement cost
Plus all related transaction costs
3
Tenant or
sharecropp
er
Farmlands
If a contract/formal agreement exists with the tenant or sharecropper
Compensation for perennial crops (replacement cost) according to the formal contract (between the
landowner and the tenant/sharecropper);
Compensation for annual crops at market price (only if annual crops cannot be harvested before the
date of loss) according to the formal contract (between the landowner and the tenant/sharecropper);
Compensation at replacement cost of land improvements, paid to certified owner of the improvements
The RAP Implementation Unit (RIU) will work to facilitate an agreement with the owner regarding the
allocation of compensation for perennial crops (replacement cost) in accordance with existing informal
agreements (between landowner and tenant/sharecropper)
Compensation for annual crops at market price (only if annual crops cannot be harvested before the
date of loss) according to the informal agreements (between the landowner and the
tenant/sharecropper);
Compensation at replacement cost of land improvements, paid to certified owner of the improvements
21
# PAP
ASSET
AFFECTED/TY
PE OF LOSS
ENTITLEMENTS
COMPENSATION
TRAINING
PROGRAMME FOR
RESTORATION OF
LIVELIHOODS
4 Tenant
Tenant in an
affected
structure
Residential
use
Relocation allowance (including all costs
related to moving plus compensation for transaction costs)
A transition allowance to cover the time needed to find a place of residence (usually 3 months’ rent and
a maximum of 6 months’ rent)
Tenant in an
affected
structure
Residential
and
commercial
use
Relocation allowance (including all moving costs plus compensation for transaction costs)
A transitional allowance to cover the time needed to find a place of residence or commercial activity
(usually 3 months’ rent and a maximum of 6 months’ rent)
Compensation for loss of revenue during the period required to restore business activity (typically 3
months of revenue and up to a year's revenue)
5 Owner
(private or
cooperative
)
Fixed
commercial
structure
Compensation at replacement cost of fixed assets (including any commercial land associated with the
structure)
Plus: all related transaction costs
Compensation for loss of revenue for the time necessary to relocate the business and restore revenue -
usually three months of revenue and up to a year's revenue
6
Mobile
business
structure
(e.g. kiosk)
Relocation allowance (to cover moving and transaction costs)
Transitional allowance to cover the period until the commercial structure is 100% operational again
following relocation (generally three months of revenue up to a year's revenue)
7 Owner
Other
immovable
structures
Compensation at replacement cost
Plus all related transaction costs
8 Employee
Loss of
earnings due
to job or
business
activity loss
Compensation for loss of earnings for employees working within structures displaced is part of the
compensation paid to the owner of the structure/business activity
If there is no contract between the employee and the owner/employer, the RAP Implementation Unit
(RIU) will endeavour to find some arrangement between the two regarding the employee's
compensation
22
10. Environmental Protection
10.1 The negative impacts of reconstruction activities on the environment will be similar to
those of an isolated housing site with very limited noticeable impact on the immediate
environment of the building. These potential impacts concern mainly noise and dust nuisance in
the neighbourhood. Mitigation measures are outlined in the Environmental and Social
Management Plan (ESMP).
11 Integration with Host Communities:
11.1 Insofar as the PAPs will remain in their hill or area of origin, integration in host
communities is not a subject of concern and relevant action for this RAP. There is no foreseen
impact or specific provisions to be implemented for the grouped integration of displaced persons.
12 Organizational Responsibility
12.1 REGIDESO: REGIDESO will be responsible for implementation of RAPs through a
dedicated RAP Implementation Unit (RIU). REGIDESO will work with the Resettlement
Committee (RC) and an NGO for the implementation of RAPs. REGIDESO will also be
responsible for monitoring the performance of the resettlement operation and participate in
control audits. REGIDESO will maintain close collaborative relations with public technical
structures involved in the resettlement, interested PAPs and NGOs.
12.2 RAP Implementation Unit: The RIU will be responsible for the implementation of
RAPS and coordination with the various stakeholders. It will maintain permanent presence in the
Project area and constant communication with the administrative bodies, local government
structures as well as persons affected and their local resettlement committees. The RAP
Implementation Unit will be established by REGIDESO and will include: a project manager, a
land specialist and a sociologist.
12.3 Resettlement Committees (RC): The RC is a high-level committee that will oversee
and guide the overall implementation of RAPs for the various components of the Project. The
Ministry of Mines and Energy will be responsible for appointing the committee members.
Representatives will be appointed by ministerial decree, except in the case of private companies.
The Committee will comprise at least the representatives of municipalities, sectors, REGIDESO,
the Ministry of Finance, the works contractor, civil society and PAPs.
12.4 Local Resettlement Committees: Local resettlement committees will be established upon approval of the PRC and RAP summary. They will play a key role in the consultation process, facilitate communication with PAPs and be actively involved in consultation activities.
12.5 National Land Commission (NLC): The NLC is established by the Land Code (Art.
452) and is tasked with assisting the government in the preparation, implementation, monitoring
and evaluation of the national land policy. Its composition is established by decree; it is required
to issue an opinion prior to expropriation to ensure proper implementation of land legislation.
23
13. Participatory Process
13.1 Description of the Participatory Process Conducted to Date:
13.1.1 Consultation process: There was extensive public consultation during successive
studies undertaken on the project since 2010:
The former Consultant, Fichtner, organized several meetings at the level of the
municipalities and hills concerned by the project; communication with
stakeholders was maintained throughout the period of socio-economic surveys
conducted in 2010-2011.
In addition to Fichtner's surveys in 2011, public consultations were held between
August and September 2013 by ARTELIA and SHER, during which each person
identified as a PAP was presented and called upon to participate in the socio-
economic survey.
Local consultations: On 6 August 2013, a briefing and sensitization meeting on
the Mulembwe and Jiji projects was held in the Songa municipality at
Nyamitanga, for the populations of the Muheka and Musenyi hills; 61 people took
part in this meeting. A second briefing and sensitization was organized in the
Byengero municipality at Songorero for the populations of the Karambi and
Kanyinia hills during which 34 participants were recorded.
National consultations: The first national consultation took place on 23 August
2013 in Bujumbura. The consultation concerned Jiji and Mulembwe hydropower
development projects as well as the High Voltage Overhead power lines (HVOL)
and electrical sub-stations. The first public consultation was attended by 50
representatives of central and regional administrations, project affected persons
and NGOs. The second consultation was held on 18 October 2013 with 49 persons
following submission of the draft ESIA report.
13.1.2 Main Topics
The concerns and expectations of the various stakeholders include:
– Safety measures planned in the vicinity of dams and roads;
– Equity with respect to the compensation of affected assets;
– Equity regarding the persons impacted, in particular consideration for non-
owner operators;
– Compensation in connection with natural species in the right-of-way;
– Hiring of local labour during the works and sub-contracting to local firms -
development of income generating activities during and after project
implementation;
24
– Financing of community groves in villages in compensation for felled trees
along the road during works, with the choice of species to be planted left to
the populations concerned and technical services; and
– Organisation of information and awareness campaigns on issues related to
safety, hygiene and prevention against sexually transmitted diseases
(HIV/AIDS in particular) as well as preservation of natural resources,
cultural sites and monuments (specific measures relating to the marking of
sacred places).
13.2 Consultations During Project implementation
13.2.1 During RAP implementation, the RAP Implementation Unit (RIU) will be responsible
for planning and regular consultation with affected communities, thus covering the various PAP
groups, including vulnerable persons.
13.2.2 From the beginning of RAP implementation, the RIU will set up an office on the project
site. Information concerning the opening of the office will be widely communicated to the
affected persons, including schedules during which the staff contact person will be available. The
office location will be properly signposted. The office will be set up in a location where access
shall in no way be hindered or blocked by the works.
13.2.3 All consultation and communication activities will be recorded (in reports) and
archived. Attendance sheets signed by the participants will be established for each consultation
and information activity.
13.3 Dissemination of RAPs:
13.4.1 PAPs and communities in the project area will be provided a summary of measures, as
explicit and as precise as possible, written in French and Kirundi. This information sheet will be
given to councils and organizations that will so request during consultations. The persons
consulted will have time, between presentation of the final RAP measures and expression of their
opinion, to deepen their knowledge of the proposals from the information sheet.
13.4.2 After approval by the Government of Burundi and the World Bank, the plan will be
published in the Official Gazette of the Republic of Burundi, the World Bank Info-Shop and the
websites of the African Development Bank and European Investment Bank.
14 Grievance Redress
14.1 Grievance Recording and Monitoring
14.1.1 The grievance mechanism will be available to all affected parties, including vulnerable
persons. Therefore, it will be possible to record grievances at the local level through
resettlement committees, the RIU office and REGIDESO offices. For each grievance, a file will
be opened, containing a grievance form (in Kirundi or French), an acknowledgement of receipt
of grievance to be handed to the complainant, a follow-up sheet and a closure sheet.
25
14.2 Three Levels of Grievance Redress
14.2.1 First Level: Local Level in Cooperation with the RIU: Resettlement
committees/village leaders receive training from the RIU in order to deal with problems that can
be addressed by explanations (that is, explanation of the resettlement policy, determination of
compensation strategy or eligibility, construction regulations). The grievance redress team will
cooperate with representatives of local resettlement committees and representatives of the
construction contractor, and will meet directly with the complainant to provide detailed
explanations and, if necessary, combine the explanations with a field visit to the area subject to
dispute/construction grievance.
14.2.2 Second Level: Mediation Committee: The second level will handle grievances that the
first level is unable to resolve and will come up with solutions which, if accepted, will be binding
on the implementing agency and the complainant(s). However, the objective is to avoid legal
proceedings and to try to reach an amicable settlement, if possible. The second level of grievance
redress will work with a Mediation Committee established at the level of the municipality and
will include a representative of the Municipality, the RIU and three representatives of affected
persons.
14.2.3 Third Level: Legal Redress
If this mechanism fails to come up with an amicable agreement, the complainant or respondent
may seek legal redress (at any time).
15. Implementation Schedule
In accordance with the implementation schedule of the basic project and particularly the
resettlement plan, the duration of services, including compensation of all beneficiaries, will be
four (4) months. This timeframe includes the phase of negotiation with PAPs, and monetary
compensation for the physical resettlement of displaced persons, the provision of additional
services, capacity building, etc.
26
TABLE 14
ESTIMATED SCHEDULE
ACTIVITIES MONTHS
1 2 3 4 5 6 7
Submission of project to the Minister in charge of rural lands x
Provisional declaration of public utility x
Posting and convening of stakeholders x x
Establishment of the Resettlement Committee (RC), Project
Implementation Unit (PIU), Local Committee (LC) and the RAP
implementation support NGO (M2)
x x
Organization and execution of the additional household survey mission,
production of findings x
Organization and execution of the property valuation mission, production
of findings x
Updating of databases and preparation of final RAP draft with updated
financial data, forwarding to Minister x x
Establishment, with local authorities, of information and stakeholders
convening process, public consultation on the draft RAP x x
Review of public consultation findings and assessment of compensation
by the National Land Commission x x
Preparation of final RAP taking into account the Commission's opinions
provided; x
Forwarding of the final RAP for approval to the project's supervisory
Ministr(y)ies, the Ministry of Finance, World Bank x
Expropriation decree or ordinance: x
Notification of interested parties x
Monitoring and evaluation x
16 Cost and Budget
The budget for compensation, support and assistance to PAPs for non-linear components was
calculated based on a comprehensive census of PAPs, as set out in the annexes. Hence, it is a
reliable estimate of assets affected by non-linear components. The budget for compensation,
support and assistance to PAPs for linear components and undefined components has been
estimated. The "final" compensation costs will be determined after negotiations with PAPs,
based on signed agreements.
The estimated costs of the Resettlement Plan include:
Compensations to affected populations;
A set of measures and activities to be undertaken for implementation of the RAP
rated from M1 to M5.
An operating budget for the RAP;
A RAP update budget;
10% contingency allocation
The total budget for the RAPs of the Jiji and Mulembwe projects stands at USD 4,349,816 (BIF
6,796,788,133). The tables below provide a summary of the budget for each site.
27
Table 15
Jiji Project Budget Jiji Hydropower Project RAP Summary USD BIF
Compensation for land 885.414 1,383,458,610
Compensation for annual crops 120.061 187,594,948
Compensation for perennial crops 381.979 596,842,200
Compensation for forest trees 1.467 2,292,033
Compensation for buildings 264.562 413,377,851
Support for farmland development 44.271 69,172,931
(M1) Livelihood restoration support measures 170.240 266,000,000
(M2) Support by an NGO for resettlement process 67.840 106,000,000
(M3) Support to vulnerable PAPs and tenants 69.696 108,900,000
(M4) General assistance for resettlement and related arrangements 4.092 6,394,267
(M5) Displacement of primary school and reconstruction in durable material 7.040 11,000,000
(M6) Training of households in financial management 8.425 13,164,667
Resettlement Committee 14.976 23,400,000
Technical Secretariat of the RC 33.024 51,600,000
RAP Implementation Unit 33.024 51,600,000
Support by international experts for operation and control 51.840 81,000,000
Local Resettlement Committee 922 1,440,000
Updating of lists 52.480 82,000,000
Contingency (10%) 221.135 345,523,751
TOTAL (USD) 2,432,487 3,800,761,256
Average per household 7.071 11,048,725
Table 16
Mulembwe Project Budget
Mulembwe Hydropower Project RAP Summary USD BIF
Compensation for land 792.066 1,237,603,117
Compensation for annual crops 102.864 160,725,127
Compensation for perennial crops 229.299 358,280,156
Compensation for forest trees 4.797 7,495,426
Compensation for buildings 42.265 66,038,997
Support for farmland development 39.603 61,880,156
(M1) Livelihood restoration support measures 170.240 266,000,000
(M2) Support by an NGO for resettlement process 67.840 106,000,000
(M3) Support to vulnerable PAPs and tenants 95.040 148,500,000
(M4) General assistance for resettlement and related arrangements 4.167 6,511,000
(M5) Training of households in financial management 8.579 13,405,000
Resettlement Committee 14.976 23,400,000
Technical Secretariat of the RC 33.024 51,600,000
RAP Implementation Unit 33.024 51,600,000
Support by international experts for operation and control 51.840 81,000,000
Local Resettlement Committee 922 1,440,000
Updating of lists 52.480 82,000,000
Contingency (10%) 174.303 272,347,898
TOTAL (USD) 1,917,329 2,995,826,877
Average per household 5.006 7,822,002
28
17 Monitoring and Evaluation
The monitoring of activities will include three main components:
Internal monitoring of RAP implementation (activities/results): evaluation of
activities, implementation timelines, degree of compliance with RAPs and directly
measurable results, such as:
- The total compensation amount paid over a period of one month (see below)
- The number of persons undergoing livelihood restoration training sessions
- The number of lost and restored homes, surface areas of replacement land affected
- Business activities restored.
Remark: the monitoring of compensation/benefits payment will be entrusted to an external
independent entity.
External monitoring (by external experts): Internal monitoring will ascertain
progress and analyse problems at regular intervals (for instance quarterly) to
provide information for necessary updates of RAP procedures.
Final RAP audit (by one or more international experts): The final compliance
audit aims to ascertain project compliance with the conditions set out in the RAP
and the fulfilment of commitments by all parties.
CONTACTS:
African Development Bank
Ms Tanja Gabrielle FALLER, Senior Energy Economist, Department of Energy, the
Environment and Climate Change, African Development Bank, P.O. Box 323 - 1002 Tunis
Belvedere, Tunisia, Tel: +216 71 10 2268, E-mail: [email protected]
Ms Awatef SIALA FOURATI, Principal Environmental Officer, Department of Energy, the
Environment and Climate Change, African Development Bank, P.O. Box 323 - 1002 Tunis
Belvedere, Tunisia, Tel: +216 71 10 3854, E-mail: [email protected]
Ms Eloise FLUET, Senior Socio-economist, Department of Energy, the Environment and
Climate Change, African Development Bank, P.O. Box 323 - 1002 Tunis Belvedere, Tunisia,
Tel: +216 71 10 2929, E-mail: [email protected]