Shall the Town of Hampton vote to raise and appropriate the sum of $126,812.00 for the purpose of making the followingimprovements to the Lane Library: a) to replace the fan coils
and thermostats throughout the building; b) to replace the carpeton the first floor. This shall be a non-lapsing appropriation perRSA 32:7, VI and will not lapse until the purpose of this article
is completed or by March 31, 2017, whichever is sooner? (Majority vote required)
Lane Memorial LibraryImprovements
Warrant Article #23
Lane Memorial Library
Carpet detail photo
Installed 1985
There are several rippling areas like the one pictured here
Lane Memorial LibraryLane Memorial Library
Fan coil detail photoFan coil detail photo
Installed 1985Installed 1985
Paid $1,344 in maintenance to these devices in 2014Paid $1,344 in maintenance to these devices in 2014
Deferred an additional $1,426 in maintenanceDeferred an additional $1,426 in maintenance
Lane Memorial LibraryLane Memorial Library
Fan coil detail photoFan coil detail photo
Installed 1985Installed 1985
Paid $3,907 in maintenance to these devices in 2013Paid $3,907 in maintenance to these devices in 2013
Lane Memorial LibraryLane Memorial Library
Fan coil detail photoFan coil detail photo
Installed 1985Installed 1985
Lane Memorial Library
Thermostats photo
Installed 1985
Only one of the thermostats pictures is working. The building is currently being cooled and heated during closed hours at the same level as during operating hours.
Cost to replace $273
Lane Memorial Library
Thermostats photo
Installed 1985
This thermostat is effectively broken because the heating knob crumbled from age. Both the heating and cooling knobs are needed to communicate with the HVAC system.
Cost to replace $338