Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
LegendBoundary Line
Security Perimeter
Buildings
Existing Historically Significant Trees
Cemetery
Parcel Major Open Space
1. Meadow
2. Woodland
3. Forest Preserve
4. Managed Forest Preserve
5. Arboretum Setting
6. Courtyard and Stormwater Retention
7. Woodland Landscape
LANDSCAPE STRATEGY
Barry Farm
Martin Luther King Jr. Ave.
I-295
Shepherd Parkway
Congress Heights
To Malcolm X Avenue
Cemetery
1
1
22
2
2
2
2
3
4
4
5
5
5
6
7
ProposedGate 4
Gate 1 ProposedGate 3Gate 2
6
4
7
1A
Woodland Landscape
Arboretum Setting Courtyards and Stormwater Retention
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
LANDSCAPE STRATEGY - IMAGES
Woodland Landscape
Arboretum Setting Courtyards and Stormwater Retention
Cemetery Forest Preserve
Meadow
Woodland
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
LANDSCAPE STRATEGY - IMAGES
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
STORMWATER MANAGEMENT
Legend
green Roofs
Grass Infiltration Swales
Bioretention Zones
Stormwater Management Facility
Underground Stormwater Management Facilities
Underground Parking Structures with At-grade Landscape
Cedar Dr.
Cedar Dr.
Holly
St.
Ash
St.
Redwood Dr.
Ceda
r Dr.
Spruce St. Plum St.
Redwood Dr.
Hemlock St.
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
STORMWATER STRATEGY - IMAGES
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
PAVING IMPROVEMENTS
Legend new Pavement - Impervious new Pavement - Pervious
Replace pavement with pervious pavement - was pervious pavement in 1937
Replace pavement with pervious pavement - was impervious pavement in 1937 Replace pavement with lawn - was lawn in 1937 Replace pavement with lawn - was pavement in 1937
Cedar Dr.Cedar Dr.
Holly
St.
Ash
St.
Redwood Dr.
Ceda
r Dr.
Spruce St. Plum St.
Redwood Dr.
Hemlock St.
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
SITE SECTIONS LOOKING NW
ALTERNATIVES 4 AND 5
USCg Building
undergroundparking proposed addition to
bldg 46Command CtrZone
bldg 08bldg 46
connection to bldg29
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
SITE SECTIONS LOOKING WEST
ALTERNATIVE 4
ALTERNATIVE 5
Proposed B3.1
Proposed B2.1
bldg. 68
bldg. 68
Proposed B2.1
Proposed B3.1
bldg 64
bldg 64
bldg 40
bldg 40
bldg 2 and 1(Center Building)
bldg 2 and 1(Center Building)
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
SITE SECTIONS LOOKING SOUTH
bldg. 73
bldg. 73
Proposed B3.1 and B3.2
Proposed B2.1 and B2.2
ALTERNATIVE 4
ALTERNATIVE 5
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
BUILDING SECTIONS
PROPOSED USCG BLDG ALTERNATIVE 4 AND 5
Floors above existing and “virtual” gradeFloors below “virtual” grade and above proposed grade
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
BUILDING SECTIONS
ALTERNATIVE 4 WEST SECTION OF PAVILION SITE
Floors above existing gradeFloors below existing grade
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - ARLINGTON HOUSE
ALTERNATIVE 4
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - ARLINGTON HOUSE
ALTERNATIVE 5
B
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - HAINS POINT
ALTERNATIVE 4
B
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - HAINS POINT
ALTERNATIVE 5
C
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
ALTERNATIVES 4 AND 5
EXTERNAL VIEWS - SOUTH CAPITOL BRIDGE
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - NAVY YARD
ALTERNATIVES 4 AND 5 D
E
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - WASHINGTON SAILING MARINA ALONG GW PARKWAY
ALTERNATIVE 4
E
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
EXTERNAL VIEWS - WASHINGTON SAILING MARINA ALONG GW PARKWAY
ALTERNATIVE 4
21
21
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
NEIGHBORHOOD VIEWS - GATES 1 & 2
1 – View looking south along Martin Luther King Jr. Avenue
ALTERNATIVES 4 AND 5
ALTERNATIVES 4 AND 5
2 – View Looking South along Martin Luther King Jr. Avenue
4
4
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
NEIGHBORHOOD VIEWS - 2ND ST.
4 – View from Fifth Street looking towards Building 68
ALTERNATIVE 5
ALTERNATIVE 4
1 – View looking south along Martin Luther King Jr. Avenue
7
6
7
6
Update of Master Plan Analyses Consulting Parties Meeting - October 14, 2008
NEIGHBORHOOD VIEWS - SOUTH CAPITOL ST.
6 – View from South Capitol Street Looking Towards Power House and Warehouse
ALTERNATIVE 5
ALTERNATIVE 4