LANDFILL GAS EXTRACTION SYSTEMS AND UTILISATION IN … · Presentation # 23, p.10 DAS – IB GmbH,...
Transcript of LANDFILL GAS EXTRACTION SYSTEMS AND UTILISATION IN … · Presentation # 23, p.10 DAS – IB GmbH,...
Presentation # 23, p.1
LFG - & Biogas -TechnologyDAS – IB GmbHFlintbeker Str. 55 D 24113 KielPreetzer Str. 207D 24147 Kiel
DAS – IB GmbHLFG - & Biogas - Technology
Biogas-, Sludge gas and Landfill gas technology:• Consulting, planning & design, project management• Familiarisation and training of system operators• Independent Expert & Specialist• Expert in ATEX – Zoning according to 99/92/EG and
94/9/EG
LANDFILL GAS EXTRACTION SYSTEMS AND UTILISATION IN HUNGARY PUSZTAZAMOR LANDFILL SITE OF FKF ZRT. BUDAPESTWOLFGANG H. STACHOWITZ*, GÁBOR EÖRSI-TÓTA** * DAS - IB GmbH – Flintbeker Str. 55, D - 24113 Kiel, Germany** ERBE ENERGETIKA Kft. – Budafoki út 95., H-1117, Budapest, Hungria
11th International Waste Management and Landfill Symposium / Sardinia 2007
October 1st – 5th
1.X. 2007
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
Presentation # 23, p.2
Flintbeker Str. 55 D 24113 KielTel. und Fax # 49 / 431 / 683814www.das-ib.deEmail: [email protected]
DAS – IB GmbH
LFG - & Biogas - Technology
Biogas-, Sludge gas and Landfill gas technology:• Consulting, planning & design, project management• Familiarisation and training of system operators• Independent Expert & Specialist• Expert in ATEX – Zoning according to 99/92/EG and 94/9/EG
Carbon Trading with Landfill Gas (LFG) and carbon credits; JI and CDM – projects
Trade with greenhouse gas emissions resp. greenhouse gas allowance
10th International Waste Management and Landfill Symposium / Sardinia 2005
3 – 7 October 2005
Learn CO2e – Trading …
… and get into the pole position.
4.X.2005
Do You remember ?
Presentation by Wolfgang H. Stachowitz DAS – IB GmbH, LFG & Biogas - Technology www.das-ib.de , phone & fax #49 / 431 / 683814
Presentation # 23, p.3
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
So we came to Hungria – Budapest – FKF Zrt (Budapest sanitation department) at Eastern 2005 to undertake our firststeps
The Pusztazámor landfill site was first started up with a area of approx. 18 ha for the disposal of waste in 2000. The entire future landfill placement area is divided into three segments with four sections each.
Presentation # 23, p.4
New situation later here
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
201720102000Start-up
716565mFilling height
9,63,92,82,9mill. tAmountof residual waste
15,36,24,54,6mill.m3Dumping volume
(without surfacesealing)
54,321,714,218,4haBase area
TotalExpansion stage 3
Expansion stage 2
Expansion stage 1
Presentation # 23, p.5
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
4th Section in segment 1 - Shows the connection point for the gas manifold station / Limitof performance & supply, pipes and gas wells and the civil work
Pumping trial in section IV because of the water situation in the side (wells)
Presentation # 23, p.6
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
The gas extraction system causing / with problems … 109 gas wells at all in 60 pipes
Presentation # 23, p.7
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
Pusztazamor Budapest Magyar FKF - Ausbaustufe 1
0,0
100,0
200,0
300,0
400,0
500,0
600,0
700,0
800,0
900,0
1.000,0
2001 2006 2011 2016 2021 2026 2031 2036 2041 2046
year
Gas
flow
[m3/
h]
gasproduction
by 50 Vol % CH4
gas extraction by 50 % eff.
gasprognosis by: DAS - IB GmbH, www.das-ib.de, [email protected]
Presentation # 23, p.8
Companies of the Project
•Budapest Sanitation Department (FKF Zrt.)
•DAS - IB GmbH
•ERBE ENERGETIKA Kft
•MÉLYÉPTERV KOMPLEX ENGINEERING Kft.
•Pro2-Anlagentechnik GmbH
•HEERS & BROCKSTEDT UMWELTTECHNIK GmbH
Presentation # 23, p.9
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
Construction phase in July and August 2006
New situation 3% gradient
Bellow expansion
GBS on hire
GMS & CS bought
Leachate water
Presentation # 23, p.10
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
2,5 MWth fireing capacity
German „TA Luft“ standard
Boiler since April 2007
Presentation # 23, p.11
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
Presentation # 23, p.12
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
-CH4, CO2, O2 (Vol%)
-F (m3/h)
-p (mbar)
-T (°C)
-FID (ppm)
-Full raw gas analysis
Presentation # 23, p.13
250275300325350375400425450
[m³/h
]
-150-130-110-90-70-50
[mba
r]
Q [m3/h] Vaacum [mbar]
354045505560
[%]
1,201,251,301,351,401,451,50
[%]
CH4 [%] CO2 [%] CH4 / CO2 [%]
Presentation # 23, p.14
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
Presentation # 23, p.15
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
raw gas concentrations
0,520,990,11mg/m3Decamethylene cyclopentasiloxane
<0,09<0,18<0,08mg/m3Decamethylene tetrasiloxane
1,353,310,42mg/m3Octamethylene cyclotrisiloxane
<0,09<0,18<0,06mg/m3Octamethylene trisiloxane
<0,28<0,57<0,19mg/m3Hexamethylene cyclotrisiloxane
0,221,270,21mg/m3Hexamethylene disiloxane
2625110mg/m3Total sulphur
21115mg/m3Total fluorine
7,41911,5mg/m3Total chlorine
38,440,241Vol-%Carbon dioxide
51,65454,4Vol-%Methane
11,343,6Vol-%Nitrogen
<0,50,90,7Vol-%Oxygen
September 2007März 2007September 2006
Concentration
Parameters, compound
Presentation # 23, p.16
Further steps*Aim to know the max.
gas quantity* New gas extraction
system with existingwells
* New wells* Gas engines
DAS – IB GmbH, LFG & Biogas – Technology, www.das-ib.de , phone #49 / 431 / 683814, fax #49 / 431 / 2004137
Problems & surprises:
* gas prognosis models* water lenses* gas temperature* foams in the condensate
shaft
At the end we made a tender document in June 2007 for another 1,000m3/h extraction system with new manifold station, condensate shaft, booster and flare station and a study about the utilisation in engines
DAS – IB GmbH – LFG- & Biogas – Technologywww.das-ib.de
Thank you for your attention – I´ve beenthere for over 2.5 years now