![Page 1: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/1.jpg)
Land use transformation along the BRT corridor – Ahmedabad
Prof. Nitika Bhakuni, Prof. H.M. Shivanand Swamy , Swapna Ann Wilson
CEPT University
Ahmedabad
![Page 2: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/2.jpg)
Hypothesis
• “Land market has a tendency to place a higher premium on parcels that are in close proximity to the transit corridors due to the travel time saving and hence the land use transformation along the transit corridors is evident.”
![Page 3: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/3.jpg)
Objectives
• Study the land-use changes induced by the introduction of BRT in Ahmedabad.▫ Built Form▫ Land use▫ Property values
• Understand the implication of these changes-▫ Urban poor ▫ Transit supportive uses
![Page 4: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/4.jpg)
LEGEND
RESIDENTIAL
INDUSTRIAL
INSTITUTIONAL
AHMEDABAD -LANDUSE PLAN
Chandkheda
Naroda village
Odhav
Bopal
Narol
Kalupur Rly. Stn.
Maninagar Rly. stn.
RanipSola RoB
Shivranjani Nehrunagar
AECNaroda
Soni ni chaali
Ahmedabad Airport.
Naroda GIDC
Odhav Industrial estate
Vatva Industrial estate
Gandhigram Rly. stn
Sabarmati Rly. stn
Gujarat University
BRT Ahmedabad
RTORailway Stations
GSRTC terminals
Airport
University/ educational campus
Industrial estatesGeeta Mandir
Phase 1 corridors (58 kms.)
Phase 2 corridors (30.5 kms.)
Study Area (25.67Km)
RTO to Soni ni Challi
Total Number of bus stops- 52
![Page 5: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/5.jpg)
Total Bus stops - 41
STUDY AREA
Section No
Corridor Total Area(Km
2)
Total Length (Km)
1 RTO to Akhbarnagar 1.6 1.9
2 Akhbarnagar to Helmet 1.5 3.3
3 Helmet to Shivranjini 2 2.7
4 Shivaranjini to Chandranagar
2.4 4.7
5 Danilimda to CTM 5.8 9.9
6 CTM to Sonini Chali 2.3 3.17
Total Study Area 15.6 25.67
![Page 6: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/6.jpg)
Change in Built Up West stretch
East stretch
Total Plots Surveyed – 2430New built Up -10
![Page 7: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/7.jpg)
Built Up
Open
Vacant
2006
BUILT UP, OPEN AND VACANT -2006
![Page 8: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/8.jpg)
BUILT UP, OPEN AND VACANT -2010
Built Up
Open
Vacant
2010
![Page 9: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/9.jpg)
Helmet Cross Roads
![Page 10: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/10.jpg)
Change in Built form West stretch
East stretch
![Page 11: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/11.jpg)
LegendFloor Height(ft) 2006
Above G+5
G+5
G+4
G+3
G+2
G+1
Ground Floor
Vacant
Building Height- 2006
![Page 12: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/12.jpg)
LegendFloor Height(ft) 2010
Above G+5
G+5
G+4
G+3
G+2
G+1
Ground Floor
Vacant
Building Height- 2010
![Page 13: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/13.jpg)
LegendFloor Height(ft) 2006
Above G+5
G+5
G+4
G+3
G+2
G+1
Ground Floor
Vacant
West Stretch - 2006
Shivranjani Cross Roads
![Page 14: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/14.jpg)
LegendFloor Height(ft) 2010
Above G+5
G+5
G+4
G+3
G+2
G+1
Ground Floor
Vacant
West Stretch - 2010
Shivranjani Cross Roads
![Page 15: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/15.jpg)
LegendFloor Height(ft) 2006
Above G+5
G+5
G+4
G+3
G+2
G+1
Ground Floor
Vacant
East Stretch - 2006
![Page 16: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/16.jpg)
LegendFloor Height(ft) 2010
Above G+5
G+5
G+4
G+3
G+2
G+1
Ground Floor
Vacant
East Stretch - 2010
![Page 17: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/17.jpg)
Land Use Change West stretch
East stretch
![Page 18: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/18.jpg)
Landuse (2006)
Residential
Commercial
Industry
Public
Open Space
Vacant
LANDUSE-2006
![Page 19: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/19.jpg)
LANDUSE-2010
Landuse (2010)
Residential
Commercial
Industry
Public
Open Space
Vacant
![Page 20: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/20.jpg)
Land Use Change
Both Residential areas and Commercial areas being converted to industrial ( Service and Light, Automobile) on the eastern side of river.
Public areas increase as vacant lands and slums converted to Public.
![Page 21: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/21.jpg)
Changes in Sub-category Land use West stretch
East stretch
![Page 22: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/22.jpg)
CHANGE IN SUB CATEGORY RESIDENTIAL-2006
![Page 23: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/23.jpg)
CHANGE IN SUB CATEGORY RESIDENTIAL-2010
No of Slums in 2006-231
Slums in 2010- 128
Slum To Number
Appartment 25
Commercial 4
Mixed 13
Public 5
Service and Light Industry
40
Tenament 16
![Page 24: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/24.jpg)
No of Polygons
45
154
96
15
Land use Change Vs Passenger Numbers – West Side
![Page 25: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/25.jpg)
No of Polygons
140
316
313
15
Land use Change Vs Passenger Numbers – East Side
![Page 26: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/26.jpg)
Buffer150 250 350
1 3 0
0 3 5
4 8 6
14 11 9
Akbarnagar bus stop
Average Boarding/Day- 3065
![Page 27: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/27.jpg)
Buffer150 250 350
2 0 0
2 1 0
2 1 0
3 0 5
Memnagar bus stop
Average Boarding/Day- 2681
![Page 28: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/28.jpg)
Buffer150 250 350
0 0 1
0 12 2
15 18 10
2 16 4
Shivranjani, Nehru Nagar and Anjali bus stop
![Page 29: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/29.jpg)
Buffer150 250 350
0 3 6
1 29 13
7 46 15
7 8 27
Danilimda, Narol bus stop
![Page 30: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/30.jpg)
Buffer150 250 350
0 0 0
42 20 17
45 32 36
6 3 1
CTM, Jogeshwari Society, Soni ni Chali stop
![Page 31: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/31.jpg)
Changes in Property Value
![Page 32: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/32.jpg)
Implication• Urban Poor▫ Affordability of housing and accessibility issues may emerge in
future. Shortage of affordable housing in the eastern side of the city.
• Transit Supportive uses▫ Change in land use especially towards non transit supportive in
the eastern of the river needs to be checked. Unfavorable trend for Transit Oriented Development.
• Land values▫ Land prices in overall city have increase phenomenally. ▫ Although there is an increase in land values it is too soon to link it
to transit as the BRT has been operational for just over one year.
![Page 33: Land use transformation along the BRT corridor – Ahmedabad Bhakuni...Geeta Mandir Phase 1 corridors (58 kms.) Phase 2 corridors (30.5 kms.) Study Area (25.67Km) RTO to Soni ni Challi](https://reader034.fdocuments.us/reader034/viewer/2022051907/5ffa0f7f3a1d5a0e0066570a/html5/thumbnails/33.jpg)
Thank You