Land Use Strategic Master Plans

93
LAND USE & DEVELOPMENT MASTER PLANS MUNICIPAL LEVEL (COUNTY LEVEL)

description

Shows how to make a land use "ordering" and development master plan based on trasect / new urbanism usage Since land is already "ordered" and "planned" in developed countries this presentation may not be applicable in those countries. Nevertheless, this model might be helpful for urban planners that need to "order" their territories, specially in underdeveloped (third world countries) The presentation is based in Ecuador´s territorial division (analogue to the US) The model target cities that may work together to stablish a "regional" authority, which may include cities for different counties I translated this from Spanish to English, sorry for the typos

Transcript of Land Use Strategic Master Plans

Page 1: Land Use Strategic Master Plans

LAND USE & DEVELOPMENT MASTER PLANSMUNICIPAL LEVEL (COUNTY LEVEL)

Page 2: Land Use Strategic Master Plans

AGENDA

• Urban Planning Introduction

• City Management - Legal Framework

• New Urbanism

• Land Use Ordering & Development Integration

• Plans Herarchy & Structure

• Work Breakdown Structure

Page 3: Land Use Strategic Master Plans

Background

• Chicago 1893• Overcrowding• Land Use

Separation

• Great Depression

• WWII• WWII Veterans

Page 4: Land Use Strategic Master Plans

Development

• “Suburbia”• “Fordism” • Cheap Gas

• Federal Highway Act• Cheap Land• Housing Bubble

Page 5: Land Use Strategic Master Plans

Maturity

• Stock Market

• Bonds

• Public Sector• Private Sector

• Maintenance• Construction / Expansión

Page 6: Land Use Strategic Master Plans

Downfall

• Car Oriented• Health Problems• Social

Disconnections

• Environment• AbandonedInfraestructure

• Crime

Page 7: Land Use Strategic Master Plans

City Management

• Systemic Approach• Traditional Approach

• Individual Actions • Syncronized Actions• Activities Balance

• “Community”

Page 8: Land Use Strategic Master Plans

Legal Framework

• Constitución• National Plans• Legal Constraints

• Constitution• Federal Laws• State Laws

Federal Government

States

County

City

Ejecutivo

Provincias / Estados

Cantones / Municipios

Parroquias

• Local Governments• Public Sector• Private Sector

Page 9: Land Use Strategic Master Plans

Transectos

Page 10: Land Use Strategic Master Plans

Theorical Framework Transectos

USGBC – CNU - LEED

Howard –Garden City

Christaller – Central Place Theory

Page 11: Land Use Strategic Master Plans

“New Urbanism”

• Pedestrian Oriented• Transects • Integral Transportation

Planning

• Region• City / Neihgborhoods

• Cuadrants / “Blocks”

Page 12: Land Use Strategic Master Plans

Lot, Block, Cuadrant, Neighborhood, District

Cuadrant

Blocks Lots PedestrianCircuits

Neigborhood District

¼ Milla (400m)

1/8 Mille (200m)

1/8 Mille (200m)

Page 13: Land Use Strategic Master Plans

Neighboorhood, District, City, Region

RegionDistrict

Neighborhod

City

Municipalities Public Transit Circuits

Page 14: Land Use Strategic Master Plans

Lot, Block, Cuadrant, Neighborhhod, District, City Region Definition

Page 15: Land Use Strategic Master Plans

Artificial & Natural Barriers

Roads / Railways

River / Buffer Zones

Natural Parks / Hills

Page 16: Land Use Strategic Master Plans

Conceptual Model for Barriers

City Divisions

Page 17: Land Use Strategic Master Plans

Region

• Smart Growth

• Affordable Housing

• Tax & Income Division

• Community Support

• NIMBY´s

• Water Usage

• City Growth

• Food Production

• Natural Reserves

Page 18: Land Use Strategic Master Plans

City / “Neighborhoods”

• Density

• Mix Use

• Size

• Corridors

• Housing Mix

• Design

• Green Spaces

• Accesibility

• Walkable

Page 19: Land Use Strategic Master Plans

Permited Uses / Retail Distribution

• Wanted • Not Wanted

LIMIT

CENTER

Page 20: Land Use Strategic Master Plans

“Walkable”

DISTRICTS

NEIGHBORHOODS CUADRANT

Page 21: Land Use Strategic Master Plans

“Neighborhood” Characteristics

Page 22: Land Use Strategic Master Plans

Uses

• Housing

• Retail

• Offcies• Residential

• Agricultural• Mix

• Workshops

• Industrial

Page 23: Land Use Strategic Master Plans

Cuadrants / “Blocks”

• Street Network

• Vehicule Speed

• Lighting

• Connections

• Multiple uses

• Right of Way (ROW)

• Size

• Pedestrian (ROW)

• Walkable

Page 24: Land Use Strategic Master Plans

Buildings

• Roads

• Forms

• Architectural Standards(Typology)

• Civic Spaces

• Permitted Uses

• Building Type

• Distribution

• Parking

• Publico / Private space

Page 25: Land Use Strategic Master Plans

Building Location

Page 26: Land Use Strategic Master Plans

Private / Public Spaces

Page 27: Land Use Strategic Master Plans

Form

Page 28: Land Use Strategic Master Plans

Building Type

Page 29: Land Use Strategic Master Plans

Architectural Standards (Typology)

• Edificable Mass

• Windows / Doors• Frontage

Page 30: Land Use Strategic Master Plans

Civic Spaces

Page 31: Land Use Strategic Master Plans

Neighborhood Urban “Equipment” Characteristics

Page 32: Land Use Strategic Master Plans

Urban Equipment Requirements

Lots

Blocks

Cuadrants

Neighboorhoods

Districts

Cities

Regions

Page 33: Land Use Strategic Master Plans

Equipment

• Education

• Fire Fighters

• Public Safety• Parks

• Health• Public AdminOffices

Page 34: Land Use Strategic Master Plans

Equipment

• Fields

• Libraries

• Cultural• Community

Centers

• Religious• Tots

Page 35: Land Use Strategic Master Plans

Equipment

• Arts

• InfraestructureNetworks

• Museums• Day Clinics

• Federal Offices

• Post Office

Page 36: Land Use Strategic Master Plans

Regional Transportation & Transit

Page 37: Land Use Strategic Master Plans

Planned Roads Vision

Page 38: Land Use Strategic Master Plans

Transect & Zoning

Page 39: Land Use Strategic Master Plans

City Level

Page 40: Land Use Strategic Master Plans

Regional Level

Page 41: Land Use Strategic Master Plans

Buffer Zones

Page 42: Land Use Strategic Master Plans

Special Districts

Page 43: Land Use Strategic Master Plans

Vertical Vision

Page 44: Land Use Strategic Master Plans

Transect Map

Page 45: Land Use Strategic Master Plans

Illustrations

Page 46: Land Use Strategic Master Plans

Code

Page 47: Land Use Strategic Master Plans

Business Process

Page 48: Land Use Strategic Master Plans

Scale Model

Page 49: Land Use Strategic Master Plans

Land use order & Development Integration

• SystemicApproach

• OrderedTerritory

• Developed Terriory

Page 50: Land Use Strategic Master Plans

Support Information

• Historica Maps

• Statistics

• Workshops

• Legal Framework

• Systematized

Page 51: Land Use Strategic Master Plans

Maps / Distribution Lines / Cartography

• Cartography

• Geo referencedAttractions

• Distribution Lines

• Cadastre

• Systematized(GIS)

Page 52: Land Use Strategic Master Plans

Human Settlements System

• Land uses• Stocking• Zoning

• Public Safety• Urban Mobility• Urban Standards

Page 53: Land Use Strategic Master Plans

Human Settlements System

• Public Works: Water, Sewage & GarbageCollection

• Land Tenure

• Health & Education

• UrbanEquipment

• Affordable Housing

Page 54: Land Use Strategic Master Plans

Mobility System

• Freight• Road Network • PublicTransportation

• Terminals• Road Safety• Transit

Page 55: Land Use Strategic Master Plans

Traffic Engineering & Land Use ViciousCircle

Land Use Planning

Traffic EngineeringCongestion

Development

Citizens demandingroad widening

Road Widening

No Congestion

Cheap Land Access

Land Price IncreasesCitizen DrivingIncrease

RezoningCheap Houses

Page 56: Land Use Strategic Master Plans

Environment System

• Soil• Water• Air

• Flood Plains / Risk zones

• FragileEcosystemes

• Non RenewableResources

Page 57: Land Use Strategic Master Plans

Economical Systems(Products / Services)

• Forest / Silviculture• Agro Businesses

• Minig

• ¨Patrimonial / Tourism• Eco Tourism• Industrial

Page 58: Land Use Strategic Master Plans

Economical Systems(Transformations)

• Value Added • Jobs • Support Infraestructure

• Financial Markets • Import / Export • Free Ports

Page 59: Land Use Strategic Master Plans

Energy & Connectivity System

• Land Lines• Cell Phone Networks

• Internet • Energy

• Tv & Radio

• Alternative Energy

Page 60: Land Use Strategic Master Plans

Socio-Cultural System

• Ethnic Groups

• Public Participation

• Cultural Identity

Page 61: Land Use Strategic Master Plans

Political – Institutional System

• Organizational Chart• Business Model

• Job Description • Job Sizing

• ContinouosImprovement

Page 62: Land Use Strategic Master Plans

Political – Institucional System

• Budgets

• Projects Portafolio

• Business Processes/ ServicesCatalogs

Page 63: Land Use Strategic Master Plans

Business Model

Page 64: Land Use Strategic Master Plans

Systemic Vision

Page 65: Land Use Strategic Master Plans

Plan Hierarchy

Federal Plan

Regional Plan 1

State Plan 1

County Plan 1

City Plan 1 City Plan 2

County Plan 1

City Plan 1 City Plan 2

County Plan 3

Metropolitan District Plan

State Plan 2

Region Plan 2

State Plan 1 State Plan 2

Region Plan 3

State Plan 4

County Plan 5

City Plan 1

Alignment

Feedback

Page 66: Land Use Strategic Master Plans

Objectives

¿What?

• Syntaxis

Page 67: Land Use Strategic Master Plans

Strategies

• Investment Projects

• Maintenance Projects

¿How?

• Business Processes

Page 68: Land Use Strategic Master Plans

Indicators

Page 69: Land Use Strategic Master Plans

Goals & Results

• Goals • Results

Page 70: Land Use Strategic Master Plans

Model Illustration

Page 71: Land Use Strategic Master Plans

Business ModelDistrictBoard

Urban Manager

Major

Division

FunctionalUnit

FunctionalArea

WorkGroup

Rural Manager

Major

Division

FunctionalUnit

FunctionalArea

WorkGroup

SupporManager

AreaChiefs

Division

FunctionalUnit

FunctionalArea

WorkGroup

N0

N1

N2

N3

N4

N5

N6

N7 – N9Information System (IT)

Strategic Area

Operative AreaFEEDBACK

Page 72: Land Use Strategic Master Plans

Executive office CEO

Coordination (CO) Urban Coordination Mayor / County Authority Coordinacion (CO) Rural Coordination Rural Cities Chief 

Strategic Objetives Strategic Objetives

Management Office Urban Cities  Urban City Authority Management Office Urban Cities  Urban City Authority Management Office Rural Cities  Rural City Authority Management Office Rural Cities  Rural City Authority

Strategic Objectives Strategic Objectives Strategic Objectives Strategic Objectives

Strategies Strategies Strategies Strategies

Macro Business Processes Macro Business Processes Macro Business Processes Macro Business Processes

Division Manager Division Chief of Division Division Manager Division Chief of Division Division Manager Division Chief of Division Division Manager Division Chief of Division Division Manager Division Chief of Division Division Manager Division Chief of Division

Operative Objectives Operative Objectives Operative Objectives Operative Objectives Operative Objectives Operative Objectives

Sub Processes Pool Sub Processes Pool Sub Processes Pool Sub Processes Pool Sub Processes Pool Sub Processes Pool

Projects Projects Projects Projects Projects Projects

Unit Functional Unit Chief of Unit Unit Functional Unit Chief of Unit Unit Functional Unit Chief of Unit Unit Functional Unit Chief of Unit Unit Functional Unit Chief of Unit Unit Functional Unit Chief of Unit

Sub Process Sub Process Sub Process Sub Process Sub Process Sub Process

Area Functional Area Chief of Area Area Functional Area Chief of Area Area Functional Area Chief of Area Area Functional Area Chief of Area Area Functional Area Chief of Area Area Functional Area Chief of Area

Chief of Task Chief of Task Chief of Task Chief of Task Chief of Task Chief of Task

N7

N8

N9

INFORMATION SYSTEM ORGANIZED BY MODULES

Average time for tasks Tareas

Part of functional area budget Part of functional area budget Part of functional area budget Part of functional area budget Part of functional area budget Part of functional area budget

Recruited by HR officeAverage time for tasks Tareas Average time for tasks Tareas Average time for tasks Tareas Average time for tasks Tareas Average time for tasks

N6

Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR officeTareas

Average time for activities

Activities

Part of functional area budget Part of functional area budget Part of functional area budget Part of functional area budget Part of functional area budget Part of functional area budget

Recruited by HR officeAverage time for activities Activities Average time for activities Activities Average time for activities Activities Average time for activities Activities Average time for activities

N5

Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR officeActivities

Responsible for the budget related to his subprocess (includes activities and tasks)  Responsible for the budget related to his subprocess (includes activities and tasks)  Responsible for the budget related to his subprocess (includes activities and tasks)  Responsible for the budget related to his subprocess (includes activities and tasks)  Responsible for the budget related to his subprocess (includes activities and tasks) Responsible for the budget related to his subprocess (includes activities and 

tasks) 

Recruited by HR officeBusiness Process IndicatorsBusiness Process 

IndicatorsBusiness Process Indicators Business Process Indicators Business Process Indicators

Business Process IndicatorsTactics (Continuos Improvement) Tactics (Continuos Improvement) Tactics (Continuos Improvement)

Responsible for the Division Budget. Includes all the sub processes in his division

N4

Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR officeTactics (Continuos Improvement) Tactics (Continuos Improvement) Tactics (Continuos Improvement)

Recruited by HR officeKPI KPI KPI KPI KPI KPI

Responsible for the Division Budget. Includes all the sub processes in his division Responsible for the Division Budget. Includes all the sub processes in his division Responsible for the Division Budget. Includes all the sub processes in his division

N3

Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR office Recruited by HR office

Responsible for the Division Budget. Includes all the sub processes in his division Responsible for the Division Budget. Includes all the sub processes in his division

KPI

Budget for Urban City Budget for Urban City Budget for Rural City Budget for Rural City

N2

Authority is elected by the public. Majors

Authority is elected by the public. Majors

Authority is elected by the public. Majors

Authority is elected by the public. Majors

KPI KPI KPI

N1

Coordinator appointed by the board

Coordinator appointed by the boardKPI KPI

Strategies Strategies

Group Budgets for Urban Cities (Urban Parroquias) Group Budgets for Rural Cities (Rural Parroquias)

N0

BoardCEO Appointed by member of the board. Board 

composed by all public elected 

mayors and councils at County Level

Mission 

Vision

Policies / Tranverse Strategies

Aprove Budget and Projects for Coordinations

INFORMATION TECHNOLOGYEXECUTIION

ORGANIZATION

SOCIO ‐ CULTURAL SYSTEM KEY RESOURCESKEY ACTIVITIES

COST STRUCTURE

ENVIRONMENTAL SYSTEM DISTRIBUTION CHANNELECONOMICAL SYSTEM RELATIONS WITH CLIENTS

ENERGY AND CONNECTIVITY SYSTEM CASHFLOW

BUSINESS MODEL METROPOLITAN DISTRICTS

LAND ORGANIZATION AND DEVELOPMENT SYSTEMS BUSINESS MODEL AREA 

HUMAN SETTLEMENTS SYSTEM CLIENT SEGMENTSMOBILITY SYSTEM VALUE PROPOSITION

Page 73: Land Use Strategic Master Plans

Vision

• Business Model• Territorial Development

Systems

• Regional Umbrella

Page 74: Land Use Strategic Master Plans

Methodology

• Proposal per System

• Diagnostics

• Deliverables

• Public Workshops • Feedback / Measurements

Page 75: Land Use Strategic Master Plans

Work Area

• Saturday / Rural (2 Cities)

• Nights / Urban (9 cities)

• 8 Workshops• 36 Workshops

• 8 ValidationWorkshops

Page 76: Land Use Strategic Master Plans

1. Gaps Workshop

• Today• Surveys • Tomorrow

• Gap• Support Team • Facilitators

Page 77: Land Use Strategic Master Plans

2. Diagnostic

• Statistics

• Workshops

• Checklists

VS

• Gaps

• Univeristies• Professional

Associations

• Chambers • Public Sector

Page 78: Land Use Strategic Master Plans

3. Diagnostic Validation

• Facilitators

• Support Team

• Surveys

• Feedback

Page 79: Land Use Strategic Master Plans

4A. Proposal / Stategies Development

• Stategies / Action Lines

• Workshops

• Validation

• Systematized

• Information

Page 80: Land Use Strategic Master Plans

4B. Design Workshops

• Options • Renders

• Typology Standarization • Public Participation

Page 81: Land Use Strategic Master Plans

Form Based Code Process

PHASES PLANNING REGULATIONS ADMINISTRATION

Documents

Assembly

Macro Scale• N´hood, Districts &

Corridors

Micro Scale• Existent Trasect Matrix• Micro Element

Documentation

Illustrative Plan & Images• Illustrative Plan • Vision per Transect

• Vision for Micro Elements

Regulatory Plan & Regulations• Regulatory Plan • Transect Matrix

• Regulation MatrixMicro Elements

• Uses Matrix Revision

Assembly• Additional Texts

Edition• Codes & Business Processes

Vision

Page 82: Land Use Strategic Master Plans

5. Plan Consolidation

• Ordered Information

• Field Work

• Calculations

• Proposal

• Universities• Professional

Associations

• Chambers • Public Sector

• Design

Page 83: Land Use Strategic Master Plans

6. Plan Validation

• Facilitator

• Deliverables

• Public Hearing

• Feeback

• Concensus

Page 84: Land Use Strategic Master Plans

7. Final Validation

• Deliverables Accepted

• Opening • Marketing Products

Page 85: Land Use Strategic Master Plans

Land Use – Form Based Code Deliverables

• Scale Model

• Transect – Land use Map

• Code / Plan / Business Processes / Standards

• Up to Date GIS Cadatre

• Public Work Line Projections

Page 86: Land Use Strategic Master Plans

Business Model Deliverables

• Organizational Chart – Job Descriptions

• Strategic & OperativePlan

• Investment & Maintenance

Budgets

• Business Processes / Services Catalog

• Project Portafolio

Page 87: Land Use Strategic Master Plans

Multimedia Deliverables

• Photos / Videos

• Multilingual Website

• Plan MonitoringSystem

• Digital Information (GIS)

• Marketing Products

Page 88: Land Use Strategic Master Plans

Supplies / Support Requirements

• Multimedia Equipment• Physical Space

• Transportation • Materials

• Lunch

• Plot / Printing

Page 89: Land Use Strategic Master Plans

High Level GantNumber Task Predecessor Approx Length

1 Define Work Area 0 3 days

2 Share Work Methodology 1 15 days

3 Plan Diagnostic Workshops 2 3 days

4 Assign Responsibilities 3 2 days

5 GIS Field Information 3 60 days

6 Workshops 4 21 days

7 Diagnostic Reports 6 45 days

8 Diagnostic Sharing 7 21 days

9 Generate Maps per System 5,8 21 days

10 Develop Plan Proposal 7,9 45 days

11 Share Proposal 10 21 days

12 Adjust Proposal 11 14 days

13 Final Validation 12 21 days

14 Release 13 5 days

15 Marketing Products 14 60 days

16 Digital Repository Generation 14 100 days

17 Digital Repository Launch 14 1 day

18 Digital Repository Release 17 1 day

19 Scale Model Construction 14 365 days

20 Scale Model nor Public 17 1 day

• InformationCustodian

• Project Manager

• InformationFlow

• MeetingsProtocol

Page 90: Land Use Strategic Master Plans

Route to Municipal Excellency

Principal Actions

BUSINESS PROCESSES / SERVICES AUTOMATIZATION

MULTIFINALITARY CADASTRE

LAND USE & DEVELOPMENT MASTER PLANS

Page 91: Land Use Strategic Master Plans

Systemic Vision

Page 92: Land Use Strategic Master Plans

[email protected]+(593) 994272615

Page 93: Land Use Strategic Master Plans

SMART URBANISM