Lakefront West Public Meeting
June 4, 2015
Project Overview
• 3 Construction Projects
– Pedestrian Tunnels at Lake Avenue and West 76th
• Completed
– West 73rd Grade Separation
• Under Construction
• Roadways Open - December 2015
• Final Landscaping - Spring 2016
– Mainline - Lake Avenue/Clifton Boulevard to West 25th Street/Detroit Avenue
• Construction to Begin - June 22, 2015
• Roadways Open - December 2017
• Final Landscaping - Spring 2018
Lakefront West Corridor – Projects and Schedule
Construction Phasing
• 2 lanes of West Shoreway mainline traffic maintained in both directions within work zones for the majority of the project duration.
• Periodic off peak short term closures of additional lanes may occur as necessary.
• 3 lanes of traffic in each direction will be restored for over winter periods and when otherwise feasible.
• Speed Limits will be reduced to 40 mph over the summer of 2015 and then to 35 mph begin fall of 2015.
Construction Phasing
Phase 2
13’ 11’ 4’ 4’ 11’ 13’
Phase 1
4’ 11’ 11’ 11’ 11’ 4’
Construction Phasing
Completed Condition
13’ 11’ 12’ 12’ 11’ 13’
Construction Phasing
• Bridge over the Lake Avenue Eastbound Entrance Ramp– West Shoreway will be closed at Clifton Ave for 25 days.– Traffic to and from the West Shoreway will be maintained
via the Lake Avenue ramps.– Law Enforcement Officers will be utilized during peak
periods. Detours will be posted.– Construction of bridge anticipated as early as Fall 2016
• Entrance/Exit Ramp closures with posted detours will occur periodically at Lake Avenue, Edgewater Park, West 49th Street, West 45th Street and West 25th
Street.• Ramp closures are phased so reasonable detours are in
place and concurrent closures of multiple ramps are kept to a minimum.
Construction Phasing
• Access to Edgewater Park, Whiskey Island and Other Marinas, NEORSD Westerly Plant, Garrett Morgan Water Treatment Plant, and Cleveland Soap Box Derby will be maintained at all times.– Posted detours will be in place as necessary for restrictions in
place.
• Entrance/Exit Ramp closure durations vary by location with 21 days being the minimum and 120 days being the maximum.
• West 25th Street between Detroit Ave and Division Ave will be closed for 3 separate 21 day periods at various points of this corridor.– Access to The Flats and adjacent businesses and residences
will be maintained. Detours will be posted as necessary.
• Local access and pedestrian traffic maintained at all times. Notification will be given one week in advance of any restrictions or access changes to properties adjacent work zones.
Noise
• No pile driving between 7pm and 7am
• Waiver for restrictions on the following activities
– Traffic Pattern Changes
– Bridge Removal and Replacement
– Bridge Deck Concrete Prep and Placement
– Underground Utilities
– Pavement
– Other items per review and approval of Councilman
N
Boulevard Landscape Enhancements
Boulevard Enhancement Area 1 Overall Project Corridor Plan
N
Boulevard Landscape Enhancements
Boulevard Enhancement Area 2 Overall Project Corridor Plan
N
Boulevard Landscape Enhancements
Boulevard Enhancement Area 3 Overall Project Corridor Plan
N
Boulevard Landscape Enhancements
Boulevard Enhancement Area 4 Overall Project Corridor Plan
N
Boulevard Landscape Enhancements
Boulevard Enhancement Area 5 Overall Project Corridor Plan
N
Boulevard Landscape Enhancements
Boulevard Enhancement Area 6 Overall Project Corridor Plan
Boulevard Landscape Enhancements
Boulevard Landscape Enhancements
Boulevard Landscape Enhancements
West Boulevard & Lake Avenue Node
West Boulevard & Lake Avenue Node
West 25th Street Node
West 25th Street Node
Lighting Details
Structures
Florida Ashlar
Sawed Joint
Sheet Pile Wall with Concrete Face and Cap
Devon Brown
Autumn Honey
Florida Ashlar
Ex. Edgewater Park BridgeStructure Types ad Finishes
Fence and Railings
DarkBronze
Railings
Fence Along Water Department - Powder
Coat Black
Materials and Hardscape – Decorative Pavers
Sample Color Palette for Decorative Pavers
Typical Multi-Use Path Node
Colored Concrete
Wood Seating Surface
Sandstone Color Palette
Wood & Steel Trash Receptacle
Steel and Cable Trellis
Planting Palate – Nodes
Shrubs
TreesWhite Oak Red Oak Redspire Flowering Pear
Oak Leaf Hydrangea Knock Out Roses Japanese Spirea Viburnum
Low-Growing Juniper Ground Cover Juniper
Planting Palate – Nodes
Perennials
Happy Returns Daylily Russian Sage
Ostara Hyacinth
Dutch Master Daffodil Hyperion Daylily
Grass
Karl Foerster (Reed Grass)
Planting Palate – BoulevardTrees
Crusader Hawthorn Prairie Fire Crabapple Japanese Lilac
Centurian Crabapple Golden Rain Drop Crabapple Serviceberry Zelkova
Red Jewel Crabapple
Chinese Elm Golden Raintree Redspire Flowering Pear Ginkgo
Planting Palate – Boulevard
Trees (continued)Valley Forge American Elm Red Oak Black Gum
Oak Leaf Hydrangea Grow-low Sumac Buffalo Juniper Shrubs
Karl Foerster (Reed Grass) Japanese SpireaBlackhaw Vibunum
Planting Palate – Boulevard
GrassKarl Foerster (Reed Grass) Blue Lynn Cassian FountainMaiden
Walker’s Low Catmint Russian Sage Dutch Master Daffodil Frans Hals Daylily
Perennials
Hyperion Daylily Autumn Joy Sedum
Wayfinding
Wayfinding
Lakefront WestQuestions?