Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed...
Transcript of Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed...
![Page 1: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/1.jpg)
Project Status PresentationOctober 2018
Lake Worth Road
Multimodal Corridor Study
![Page 2: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/2.jpg)
A Multi-Agency Approach ...
… for broad perspective & input
![Page 3: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/3.jpg)
BIG MOVES
• Safer Roadway Design
• Speed Considerations
• Safer Crossings & Neighborhood Connections
• Dedicated & Enhanced Space for People Walking & Biking
• Transit Stops & Bus Bays
• Beautification, Comfort & Shade
OTHER CONSIDERATIONS
• Clear Walkways
• Corridor Lighting
• Drainage & Flooding Remedies
• Driveway Consolidation & Clean-Up
• Building Setbacks
• Landscaping Requirements
Study Need & Purpose
![Page 4: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/4.jpg)
PBC Sheriff’s Deputies, as reported on WPTV25
Long-Standing Safety Concerns
![Page 5: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/5.jpg)
Mil
itar
y
Co
ngr
ess
Land Use• C4 – General Urban
Roadway Classification• C4 – General Urban
Corridor Context for
Complete Streets
SOURCE: FDOT D4
![Page 6: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/6.jpg)
Corridor Context for
Complete Streets
SOURCE: FDOT Context Classification Manual, August 2017
![Page 7: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/7.jpg)
Corridor Context for
Complete Streets
SOURCE: FDOT Context Classification Manual, August 2017
![Page 8: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/8.jpg)
• Avg. 108 crashes per year over 5 years
• Crash approx. every 3 days
• 7% of all crashes involve a serious injury or fatality
Safety Statistics
![Page 9: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/9.jpg)
Vehicle Speed vs.
Chance of Survival
![Page 10: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/10.jpg)
30 mph 20 mph
40 mph 35 mph
What
Drivers
See …
![Page 11: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/11.jpg)
Design Speed Discussion
VS.
Speed Reduction has been requested by Village of Palm Springs and City of Greenacres
Observed Speed
![Page 12: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/12.jpg)
Pedestrian Crossings &
Neighborhood Connections
![Page 13: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/13.jpg)
• Six 11’ wide through lanes (Design Speed = 40 MPH between from Congress & Military)
• Landscaped median with left turn pockets
(dual left turn lanes at major intersections)
• 3’ shoulders
• 5’ sidewalk with 3’ planted buffer (typical) on the north side
• 8’ sidewalk with 5’ planted buffer (typical on the south side
• 40-45,000 AADT
• Formal pedestrian crossings spaced between ¼ - ½ mile, on average
Decision 1: Roadway Speed & Design
![Page 14: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/14.jpg)
• Reduce 4 inside lanes to 10’ (Design Speed = 35 MPH)
• Reduce center median landscape strip from 17’ to 10’
• Add 5’ bike lanes with 3’ buffer (curb or low landscaping?) for bike lanes
• Maintain 8’ sidewalk (south side)
• Expand planted buffer from 5’ to 6’ to accommodate trees (south side)
• Provide 8’ sidewalk by utilizing utility strip (north side)
• NOTE: Also add Davis Road signal & 2 pedestrian-only mid-block crossings
Location of Existing Median
Location of Existing Curbs
Decision 1: Roadway Speed & Design
![Page 15: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/15.jpg)
Location of Existing MedianLocation of Existing Median
Location of Existing Curbs
• Reduce to 4 lanes (10’ and 11’) (Design Speed = 35 MPH)
• Maintain center landscape median
• Add 6 ½’ bike lanes with 8’ landscape buffer
• Maintain 8’ sidewalk (south side)
• Expand planted buffer from 5’ to 6’ to accommodate trees (south side)
• Provide 8’ sidewalk by utilizing utility strip (north side)
• NOTE: Also add Davis Road signal & 2 pedestrian-only mid-block crossings
Decision 1: Roadway Speed & Design
![Page 16: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/16.jpg)
Decision 2: Pedestrian Crossings
(Potential Locations)M
ILIT
AR
Y TR
AIL
KIR
K R
OA
D
CO
NG
RES
S A
VE
(SW
AP
SH
OP
)
GU
LFST
REA
M R
OA
D
DA
VIS
RO
AD
HO
ME
DEP
OT
42
nd
WA
Y/C
OO
LEY
CT)
C&
DP
RO
DU
CE
YUA
N L
AN
E
LEGEND
EXISTING TRAFFIC SIGNAL
PROPOSED TRAFFIC SIGNAL
PROPOSED PEDESTRIAN CROSSING
EXISTING BUS STOP
![Page 17: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/17.jpg)
Pedestrian Signals
Decision 2: Pedestrian Crossings
(Design)
![Page 18: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/18.jpg)
Decision 2: Pedestrian Crossings
(Design)Signalized Pedestrian Crossing Concept @ 42nd Way
![Page 19: Lake Worth Road Multimodal Corridor Study · BIG MOVES • Safer Roadway Design • Speed Considerations • Safer Crossings & Neighborhood Connections • Dedicated & Enhanced Space](https://reader030.fdocuments.us/reader030/viewer/2022041219/5e08f0d70a27d06f473ba709/html5/thumbnails/19.jpg)
KIM DELANEY, PH.D.
DIRECTOR OF STRATEGIC DEVELOPMENT & POLICY
TREASURE COAST
REGIONAL PLANNING COUNCIL
(TCRPC)
(772) 221-4060
FOR MORE INFORMATION: