LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are...

8
DATE No. DESCRIPTION BY GENERAL NOTES REVISIONS REVISIONS THE POSITION OF POLE LINES, CONDUITS, WATERMAINS, SEWERS AND OTHER UNDERGROUND AND ABOVE GROUND UTILITIES AND STRUCTURES ARE NOT NECESSARILY SHOWN ON THE CONTRACT DRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. BEFORE STARTING WORK, THE CONTRACTOR(S) WILL PROVE THE POSITION OF ALL SUCH UTILITIES AND STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE TO THEM. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE NOTED. ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF CURB AT GUTTER. MUNICIPAL SERVICES: EX. SANITARY SEWER EX. STORM SEWER EX. WATER MAIN PROP. SANITARY SEWER PROP. STORM SEWER PROP. WATER MAIN UTILITIES: BELL TELEPHONE UNION GAS FESTIVAL HYDRO ONTARIO HYDRO CABLE TELEVISION PROPERTY: PROPERTY LINE THE CORPORATION OF THE CITY OF STRATFORD INFRASTRUCTURE AND DEVELOPMENT SERVICES DEPARTMENT CHAINAGE PROP.SAN. SEWER (INVERTS) PROP.STM. SEWER (INVERTS) PROP.STM. TRUNK SEWER (INVERTS) SHEET: DRAWN BY: DESIGNED BY: K.GUGLIELMO DATE: MAY 25, 2017 SCALE: REVIEWED BY: CHAINAGE PROP.SAN. SEWER (INVERTS) PROP.STM. SEWER (INVERTS) EXIST.CL PROFILE (ROAD) 0 5m 10m P:\WORK\TP115071\MUNICIPAL\DWG\CONTRACT\03-PP-REV.DWG GEODETIC BENCHMARK ELEV. = 360.702m 5/25/2017 11:42:34 AM CITY OF STRATFORD MONUMENT No. 20020068. CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE INTERSECTION OF ONTARIO STREET AND QUEEN STREET. M.PORTUGAL A. POIRIER 1 60% DESIGN SUBMISSION APR.2017 MP KEY PLAN PROP.STM. TRUNK SEWER (INVERTS) EXIST.CL PROFILE (ROAD) 09 OF 17 QUEEN ST STORM DIVERSION STATION 0+000 TO STATION 0+130 HORIZ: 1:200 VERT: 1:50 LAKESIDE DR. 348 349 350 351 352 354 355 356 353 LAKE VICTORIA MATCHLINE STATION 0+130 SEE SHEET 10 OF 17 348 349 350 351 352 354 355 356 353 PROPOSED MAJOR TRUNK STORM SEWER QUEEN ST QUEEN ST ELEVATION (m) ELEVATION (m) 358 357 NOTES: 1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD. 2. LAKE WATER ELEVATION INFORMATION PROVIDED BY UPPER THAMES RIVER CONSERVATION AUTHORITY. NO BENCHMARK REFERENCE WAS PROVIDED. 3. STM.MH.1 DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO PROVIDE SHOP DRAWINGS. PROP. PEDESTRIAN HANDRAIL (OPSD 980.101) JACKING PIT (JP1) (10.4m I.D/12.2m O.D) (CAISSON WALL TO BE CUT DOWN BY APPROX. 2.0m AFTER MT OPERATIONS) CONNECT TO EXIST. 150mm WATERMAIN PROP. %(1'6 PROP. PAVED WALKWAY ON TOP OF PROP. CONCRETE BOX CULVERT PROP. CONCRETE CURB & GUTTER (AS PER OPSD 600.040) PROP. CONCRETE SIDEWALK (AS PER STFD.6) CONNECT EX. STM. SEWER TO PROP.STM.MH.1 CONNECT PROP. STM.SEWER TO PROP. CONCRETE BOX CULVERT PROP. CONCRETE HEADWALL CONTRACTOR TO MATCH EXIST. SIDEWALK GRADE TO PROP. WALKWAY PROP. 150mm THICK CONC. DISTRIBUTION SLAB WHERE COVER IS LESS THAN 600mm (LOCATION TO BE CONFIRMED BY CONTRACTOR) CONNECT TO EXIST. 150mm WATERMAIN PROP. %(1'6 MATCH EXIST. SIDEWALK MATCH EXIST. CURB MATCH EXIST. CURB MATCH EXIST. CURB PROP. CONCRETE CURB & GUTTER (AS PER OPSD 600.040) MATCH EXIST. CURB STM.MH.1 5200x1700mm (SHOP DRAWINGS TO BE PROVIDED BY CONTRACTOR) REINSTALL PARK STOP BLOCKS REINSTALL PARK STOP BLOCKS TEMPORARY WATERMAIN BY-PASS PROP. WM TO BE INSTALL AFTER MT OPERATIONS

Transcript of LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are...

Page 1: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

2:3

4 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

09 OF 17

QUEEN ST STORM DIVERSION

STATION 0+000

TO

STATION 0+130

HORIZ: 1:200

VERT: 1:50

LA

K

E

S

ID

E

D

R

.

348

349

350

351

352

354

355

356

353

LAKE

VICTORIA

MA

TC

HL

IN

E S

TA

TIO

N 0

+1

30

S

EE

S

HE

ET

1

0 O

F 1

7

348

349

350

351

352

354

355

356

353

PROPOSED MAJOR

TRUNK STORM SEWER

QUEEN ST

QUEEN ST

ELEVATION (m)ELEVATION (m)

358 357

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

2. LAKE WATER ELEVATION INFORMATION PROVIDED BY UPPER THAMES RIVER

CONSERVATION AUTHORITY. NO BENCHMARK REFERENCE WAS PROVIDED.

3. STM.MH.1 DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO PROVIDE SHOP

DRAWINGS.

PROP. PEDESTRIAN HANDRAIL

(OPSD 980.101)

JACKING PIT (JP1)

(10.4m I.D/12.2m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

CONNECT TO EXIST.

150mm WATERMAIN

PROP.

2 - 45° BENDS

PROP. PAVED WALKWAY

ON TOP OF PROP.

CONCRETE BOX CULVERT

PROP. CONCRETE CURB & GUTTER

(AS PER OPSD 600.040)

PROP. CONCRETE SIDEWALK

(AS PER STFD.6)

CONNECT EX. STM. SEWER TO

PROP.STM.MH.1

CONNECT PROP. STM.SEWER

TO PROP. CONCRETE BOX

CULVERT

PROP. CONCRETE

HEADWALL

CONTRACTOR TO MATCH

EXIST. SIDEWALK GRADE TO

PROP. WALKWAY

PROP. 150mm THICK CONC. DISTRIBUTION SLAB

WHERE COVER IS LESS THAN 600mm

(LOCATION TO BE CONFIRMED BY CONTRACTOR)

CONNECT TO EXIST.

150mm WATERMAIN

PROP.

2 - 45° BENDS

MATCH EXIST.

SIDEWALK

MATCH EXIST.

CURB

MATCH EXIST.

CURB

MATCH EXIST.

CURB

PROP. CONCRETE

CURB & GUTTER

(AS PER OPSD 600.040)

MATCH EXIST.

CURB

STM.MH.1

5200x1700mm

(SHOP DRAWINGS TO BE PROVIDED

BY CONTRACTOR)

REINSTALL PARK

STOP BLOCKS

REINSTALL PARK

STOP BLOCKS

TEMPORARY

WATERMAIN BY-PASS

PROP. WM TO BE INSTALL

AFTER MT OPERATIONS

Page 2: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

3:2

2 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

10 OF 17

HORIZ: 1:200

VERT: 1:50

BA

LL

AN

TY

NE

S

T

MA

TC

HL

IN

E S

TA

TIO

N 0

+1

30

S

EE

S

HE

ET

0

9 O

F 1

7

355

356

357

358

359

361

362

363

360

354

PROPOSED MAJOR

TRUNK STORM SEWER

QUEEN ST STORM DIVERSION

STATION 0+130

TO

STATION 0+260

QUEEN ST

QUEEN ST

353

352

351

350

355

356

357

358

359

361

362

363

360

354

353

352

351

350

ELEVATION (m)ELEVATION (m)

MA

TC

HL

IN

E S

TA

TIO

N 0

+2

60

SE

E S

HE

ET

1

1 O

F 1

7

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

Page 3: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

4:1

1 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

11 OF 17

HORIZ: 1:200

VERT: 1:50

QUEEN ST

WA

TE

R S

T

355

356

357

358

359

361

362

354

360

MA

TC

HL

IN

E S

TA

TIO

N 0

+2

60

S

EE

S

HE

ET

1

0 O

F 1

7

355

356

357

358

359

361

362

354

360

PROPOSED MAJOR

TRUNK STORM SEWER

QUEEN ST STORM DIVERSION

STATION 0+260

TO

STATION 0+390

QUEEN ST

ELEVATION (m)ELEVATION (m)

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

4:1

4 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

11 OF 17

353

352

351

353

352

351

MA

TC

HL

IN

E S

TA

TIO

N 0

+3

90

SE

E S

HE

ET

1

2 O

F 1

7

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

350 350

CAISSON SHAFT (5.0m I.D/6.2m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

STM.MH.2

1200mm (OPSD 701.010)

PROP.STM.SEWER TO

CONNECT TO EX.STM.MH

AFTER MT OPERATIONS

TEMPORARY STORM

FLOW BY-PASS

363 363

Page 4: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

5:0

2 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

12 OF 17

PROPOSED MAJOR

TRUNK STORM SEWER

SCALE:

HORIZ: 1:200

VERT: 1:50

QUEEN ST

CO

UB

UR

G S

T

355

356

357

358

359

354

360

MA

TC

HL

IN

E S

TA

TIO

N 0

+5

25

S

EE

S

HE

ET

1

3 O

F 1

7

MA

TC

HL

IN

E S

TA

TIO

N 0

+3

90

S

EE

S

HE

ET

1

1 O

F 1

7

355

356

357

358

359

360

ON

TA

RIO

S

T

354

QUEEN ST STORM DIVERSION

STATION 0+390

TO

STATION 0+525

QUEEN ST

ELEVATION (m)ELEVATION (m)

355 355

354

353

354

353

352

351

352

351

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

CAISSON SHAFT (5.0m I.D/6.2m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

STM.MH.3

1500mm (OPSD 701.011)

PROP.STM.SEWER TO

CONNECT TO EX.STM.MH

AFTER MT OPERATIONS

TEMPORARY STORM

FLOW BY-PASS

CONNECT EX.STM.SEWER

TO PROP. CBMH

Page 5: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

5:5

2 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

13 OF 17

HORIZ: 1:200

VERT: 1:50

QUEEN ST

355

356

357

358

359

361

353

354

360

MA

TC

HL

IN

E S

TA

TIO

N 0

+6

50

S

EE

S

HE

ET

1

4 O

F 1

7

MA

TC

HL

IN

E S

TA

TIO

N 0

+5

25

S

EE

S

HE

ET

1

2 O

F 1

7

355

356

357

358

359

361

353

354

360

AL

BE

RT

S

T

PROPOSED MAJOR

TRUNK STORM SEWER

QUEEN ST STORM DIVERSION

STATION 0+525

TO

STATION 0+650

QUEEN ST

ELEVATION (m)ELEVATION (m)

352352

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

CONTRACTOR TO ENSURE

ENOUGH CLEARANCE

FROM EX. SAN.MH

Page 6: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

6:4

0 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

14 OF 17

HORIZ: 1:200

VERT: 1:50

QUEEN ST

355

356

357

358

359

361

353

354

360

MA

TC

HL

IN

E S

TA

TIO

N 0

+6

50

S

EE

S

HE

ET

1

3 O

F 1

7

355

356

357

358

359

361

353

354

360

BR

UN

SW

IC

K S

T

PROPOSED MAJOR

TRUNK STORM SEWER

QUEEN ST STORM DIVERSION

STATION 0+650

TO

STATION 0+720

QUEEN ST

362 362

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

2. STM.MH.2 DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO PROVIDE

SHOP DRAWINGS.

45° H.

BEND 45° H.

BEND

MATCH

EXIST. CURB

P

R

O

P

. 8

9

.3

m

- 2

0

0

0

m

m

Ø

C

O

N

C

.S

T

M

T

R

U

N

K

S

E

W

E

R

@

0

.5

%

C

L

.1

4

0

-D

45° H.

BEND

45° H.

BEND

352 352

SEE SHEET 15 OF 17

MATCH

EXIST. SIDEWALK

TACTILE WARNING PLATES

(AS PER STFD.8)

RECEPTION PIT (RP1)

(8.0m I.D/9.4m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

STM.MH.4

3000x3000mm

(SHOP DRAWINGS TO BE

PROVIDED BY CONTRACTOR)

CONNECT TO EXIST.

WATERMAIN

CONTRACTOR TO ENSURE ENOUGH

CLEARANCE FROM EXIST. STM. SEWER

CONNECT TO EXIST.

STM.SEWER

PROP. HYDRANT

(AS PER STFD.W2)

CONNECT TO EXIST.

WATERMAIN

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

CONNECT TO EXIST.

SAN. SEWER

PROP. CONCRETE SIDEWALK

(AS PER STFD.6)

PROP. CONCRETE

CURB & GUTTER

(AS PER OPSD 600.040)

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

CONNECT TO EXIST.

SAN. SEWER

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

TACTILE WARNING PLATES

(AS PER STFD.8)

PROP.STM.SEWER TO

CONNECT TO STM.MH.2

AFTER MT OPERATIONS

TEMPORARY STORM

FLOW BY-PASS

TEMPORARY

WATERMAIN BY-PASS

PROP.WM TO BE INSTALLED

AFTER MT OPERATIONS

Page 7: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

7:2

6 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

15 OF 17

PROPOSED MAJOR

TRUNK STORM SEWER

QUEEN ST STORM DIVERSION

STATION 0+980

TO

STATION 1+110

HORIZ: 1:200

VERT: 1:50

BRUNSWICK ST

EXISTING ℄ ELEVATION

355

356

357

358

359

361

353

354

360

SEE SHEET 14 OF 17

355

356

357

358

359

361

353

354

360

QU

EE

N S

T

SEE SHEET 16 OF 17

TR

IN

IT

Y S

T

BRUNSWICK ST

CONNECT TO EXIST.

STM. SEWER

CONNECT TO EXIST.

SAN. SEWER

CONNECT TO EXIST.

WATERMAIN

CONNECT TO EXIST.

STM.SEWER

TACTILE WARNING PLATES

(AS PER STFD.8)

CONNECT TO EXIST.

SAN. SEWER

PROP. CONCRETE SIDEWALK

(AS PER STFD.6)

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

P

R

O

P

. 8

9

.3

m

- 2

0

0

0

m

m

Ø

C

O

N

C

.S

T

M

T

R

U

N

K

S

E

W

E

R

@

0

.5

%

C

L

.1

4

0

-D

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

MATCH

EXIST. CURB

PROP. 4.5m - 1219x1930mm

ELLIPTICAL STM SEWER

@ 0.50% CL-140-D

PROP. CONCRETE SIDEWALK

(AS PER STFD.6)

PROP. CONCRETE

CURB & GUTTER

(AS PER OPSD 600.040)

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

2. STM.MH.2 AND STM.MH.3 DIMENSIONS ARE APPROXIMATE. CONTRACTOR

TO PROVIDE SHOP DRAWINGS.

JACKING PIT (JP2)

(8.0m I.D/9.4m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

CONNECT PROP. SAN.

SEWER TO EXIST. MH

CONTRACTOR TO ENSURE

ENOUGH CLEARANCE FROM EX.

900mm DIA. SAN. SEWER

(OVAL SHAFT MAY BE AN OPTION)

CONTRACTOR TO ENSURE

ENOUGH CLEARANCE FROM

EX. 1670x1120 ARCH SEWER

362 362

STM.MH.5

3000x3000mm

(SHOP DRAWINGS TO BE

PROVIDED BY CONTRACTOR)

RECEPTION PIT (RP1)

(8.0m I.D/9.4m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

CONNECT TO EXIST.

STM.SEWER

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

PROP. CONCRETE

CURB & GUTTER

(AS PER OPSD 600.040)

STM.MH.4

3000x3000mm

(SHOP DRAWINGS TO BE

PROVIDED BY CONTRACTOR)

MATCH

EXIST. CURB

℄ O

F R

OA

D

PROP.STM.SEWER TO

CONNECT TO STM.MH.2

AFTER MT OPERATIONS

TEMPORARY STORM

FLOW BY-PASS

TEMPORARY

WATERMAIN BY-PASS

PROP.WM TO BE INSTALLED

AFTER MT OPERATIONS

Page 8: LAKE LAKESIDE DR. QUEEN ST - Home - Stratford · PDF fileground utilities and structures are not necessarily shown on the contract drawings, ... queen st storm diversion station 0+130

DATENo. DESCRIPTION BY

GENERAL NOTES

REVISIONSREVISIONS

THE POSITION OF POLE LINES, CONDUITS, WATERMAINS,

SEWERS AND OTHER UNDERGROUND AND ABOVE

GROUND UTILITIES AND STRUCTURES ARE NOT

NECESSARILY SHOWN ON THE CONTRACT DRAWINGS,

AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF

SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.

BEFORE STARTING WORK, THE CONTRACTOR(S) WILL

PROVE THE POSITION OF ALL SUCH UTILITIES AND

STRUCTURES AND WILL ASSUME LIABILTY FOR DAMAGE

TO THEM.

ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE

NOTED.

ALL DIMENSIONS RELATED TO CURB ARE FROM BASE OF

CURB AT GUTTER.

MUNICIPAL SERVICES:

EX. SANITARY SEWER

EX. STORM SEWER

EX. WATER MAIN

PROP. SANITARY SEWER

PROP. STORM SEWER

PROP. WATER MAIN

UTILITIES:

BELL TELEPHONE

UNION GAS

FESTIVAL HYDRO

ONTARIO HYDRO

CABLE TELEVISION

PROPERTY:

PROPERTY LINE

THE CORPORATION OF THE CITY OF STRATFORD

INFRASTRUCTURE AND DEVELOPMENT

SERVICES DEPARTMENT

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

PROP.STM.

TRUNK

SEWER

(INVERTS)

SHEET:

DRAWN BY:

DESIGNED BY:

K.GUGLIELMO

DATE:

MAY 25, 2017

SCALE:

REVIEWED BY:

CHAINAGE

PROP.SAN.

SEWER

(INVERTS)

PROP.STM.

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

0 5m 10m

P:\W

OR

K\T

P1

15

07

1\M

UN

IC

IP

AL

\D

WG

\C

ON

TR

AC

T\0

3-P

P-R

EV

.D

WG

GEODETIC BENCHMARK ELEV. = 360.702m

5/2

5/2

01

7 1

1:4

8:1

2 A

M

CITY OF STRATFORD MONUMENT No. 20020068.

CAP IN CONCRETE LOCATED ON THE N/W CORNER AT THE

INTERSECTION OF ONTARIO STREET AND QUEEN STREET.

M.PORTUGAL

A. POIRIER

1 60% DESIGN SUBMISSION APR.2017 MP

KEY PLAN

PROP.STM.

TRUNK

SEWER

(INVERTS)

EXIST.CL

PROFILE

(ROAD)

16 OF 17

QUEEN ST STORM DIVERSION

STATION 0+000

TO

STATION 0+040

HORIZ: 1:200

VERT: 1:50

TRINITY ST

355

356

357

358

359

361

360

355

356

357

358

359

361

360

BR

UN

SW

IC

K S

T

362 362

354 354

TRINITY STSEE SHEET 15 OF 17

PROPOSED MAJOR

TRUNK STORM SEWER

CONNECT TO EXIST.

SAN. SEWER

JACKING PIT (JP2)

(8.0m I.D/9.4m O.D)

(CAISSON WALL TO BE CUT DOWN BY

APPROX. 2.0m AFTER MT OPERATIONS)

P

R

O

P

. 8

9

.3

m

- 2

0

0

0

m

m

Ø

C

O

N

C

.S

T

M

T

R

U

N

K

S

E

W

E

R

@

0

.5

%

C

L

.1

4

0

-D

PROP. 4.5m - 1219x1930mm ELLIPTICAL

STM SEWER @ 0.50% CL-140-D

MATCH

EXIST. SIDEWALK

MATCH

EXIST. CURB

PROP. CONCRETE SIDEWALK

(AS PER STFD.6)

PROP. CONCRETE

CURB & GUTTER

(AS PER OPSD 600.040)

MATCH

EXIST. CURB

MATCH

EXIST. CURB

NOTES:

1. BASE PLAN INFORMATION PROVIDED BY THE CITY OF STRATFORD.

2. STM.MH3 DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO PROVIDE

SHOP DRAWINGS.

353 353

MATCH

EXIST. CURB

STM.MH.3

3000x3000mm

(SHOP DRAWINGS TO BE PROVIDED

BY CONTRACTOR)

MATCH

EXIST. SIDEWALK

CONTRACTOR TO ENSURE

ENOUGH CLEARANCE FROM

EX. 900mm DIA. SAN. SEWER

CONNECT PROP. SAN.

SEWER TO EXIST. MH