Lake Barton Dredging, Restoration and Riser Modification Project
July 16, 2019
![Page 2: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/2.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Meeting Agenda
Meeting Agenda
• Introduction
• Facility Overview
• Project Need
• Project Objectives
• Work Completed
• Construction
• Next Steps
2
Meeting Agenda
![Page 3: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/3.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Introduction
Introduction
• Fairfax County Staff
– Aaron George, PE, CFM - DPWES Maintenance and Stormwater
Management Division
– Chris Triolo, PE, CCM – DPWES Utilities Design and Construction Division
• Design Engineering Consultant
– Eric Neast, PE - Gannett Fleming, Inc.
3
![Page 4: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/4.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Facility Overview
Facility Overview
Lake Barton (9992WP)
• Constructed in 1978 to provide flood control by the Natural Resources Conservation Service (NRCS) with Fairfax County and Northern Virginia Soil and Water Conservation District (NVSWCD) as local sponsors
• One of six NRCS designed flood control dams in the Pohick Watershed
• Drainage Area - 538 acres (0.8 square miles)
• Surface Area - 9.6 acres
• Lake Barton Dam is regulated by the Department of Conservation and Recreation (DCR) with operation and maintenance completed by Fairfax County
• Last dredged in 2011
4
![Page 5: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/5.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Facility Overview 5
Facility Overview
![Page 6: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/6.jpg)
Project Need
Lake Barton Dredging, Restoration and Riser Modification Project
Project Need
6
![Page 7: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/7.jpg)
Project Need
Lake Barton Dredging, Restoration and Riser Modification Project
Project Need
7
![Page 8: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/8.jpg)
Project Need
Lake Barton Dredging, Restoration and Riser Modification Project
Project Need
8
![Page 9: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/9.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Project Objectives
• Dredge accumulated sediment
– Currently estimated to remove 15,700 CY
• Facility restoration
– Shoreline rehabilitation
– Riser rehabilitation
• Trash Rack
• Cold Water Intake
• Facility Improvements
– Secondary forebay
– Improvements to existing forebay
– Water quality benefits (forebay volume)
– Mid-level sluice gate
– Fish habitat
9
Project Objectives
![Page 10: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/10.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Work Completed
• Survey
– Bathymetric
– Topographic
– Utility
– Environmental
• Sediment Sampling
• Environmental Permitting
• Design
– 95% Design Plan
– Specifications
– Permitting
10
Work Completed
![Page 11: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/11.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Work Completed 11
Work Completed
![Page 12: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/12.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Work Completed 12
Work Completed
Forebay
Forebay
Berm
Forebay
Berm
Riser
Improvements
Access
![Page 13: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/13.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Construction
Mechanical Dredge (Dry)
• General Sequence– Initiate drawdown of lake
– Establish access and staging areas
– Establish diversion channels within lake
– Conduct dredging
• Benefits– Higher daily sediment removal rates
– Minimal sediment handling effort at disposal area
– Potentially lower cost
– Constructability of improvements
• Challenges– Very weather dependent
– Higher potential for delays due to weather
– Potential for odor from lake bottom being exposed
– Need to relocate/salvage fish
13
Construction
![Page 14: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/14.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Construction
Similar Projects
• Huntsman Lake
• Woodglen Lake
• Royal Lake
14
Construction
![Page 15: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/15.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Construction 15
Construction
![Page 16: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/16.jpg)
Lake Barton Dredging, Restoration and Riser Modification Project
Next Steps
• Finalize Design / Permitting / Disposal Options
– Plan, specifications, and permits to be acquired for construction
– 3 months
• Bid
– Acquire bids from qualified contractors
– 3-4 months
• Construction
– 12 months
16
Next Steps
![Page 17: Lake Barton Dredging, Restoration and Riser Modification ...](https://reader031.fdocuments.us/reader031/viewer/2022012514/618dd2d97e400113f94d4494/html5/thumbnails/17.jpg)
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/dpwes
Lake Barton Dredging, Restoration and Riser Modification Project
17
Aaron George, PE
703-877-2809