lABOR RELATIONS ll!iiiii ~UNITED POSTIJL SERVICE
Transcript of lABOR RELATIONS ll!iiiii ~UNITED POSTIJL SERVICE
lABOR RELATIONS
~UNITED STIJTES ll!iiiii POSTIJL SERVICE
April 1, 2013
Mr. Cliff Guffey President American Postal Workers
Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC 20005-4128
Dear Cliff:
Certified Mail Tracking Number: 7012 2920 0000 8277 3215
As information, enclosed is a copy of the second and final Post Implementation Review for the Portsmouth, New Hampshire Processing & Distribution Facility (P&DF) Area Mail Processing (AMP).
In accordance with the Non-Disclosure Agreement dated February 11, 2013, the Postal Service is providing both redacted and unredacted copies of the PIR.
If you have any questions, please contact Rickey Dean at extension 7412.
Sincerely,
Patrick M. Devine Manager Contract Administration (APWU)
Enclosure
4 7 5 l: ENFANT PLAZA SW
WASHINGTON DC 20260-4101
WWW.USPS.COM (CA2013-340)
',I,
VVi! 1 ,-\tv~:'
:~: 11.\'t
iiii.!'!!!fl Ut'IJ!TED~T4T£S ~ POSTIJ.L SERVICE
March 22, 2013
RICHARD P. ULUSKI
SUBJECT: Final Post-Implementation Review (PIR)- Portsmouth, New Hampshire Processing and Distribution Facility (P&DF) -Area Mail Processing (AMP)
The AMP proposal for the transfer of destinating operations from Portsmouth NH P&DF into the Manchester NH Processing and Distribution Center (P&DC) and the Southern Maine P&DC was approved on August 5, 2011, with implementation completed by January 1, 2012. The final PIR shows a first year savings of $8,61 0,203, which exceeded the financial expectation of the first year savings of $6,599,188 for the AMP.
I extend my appreciation to the Northern New England District and the Northeast Area for successfully completing the implementation of the Portsmouth NH Destinating AMP. Please ensure that all supporting documentation is maintained at the Area Office for three years from the date of this memorandum.
If you have any questions or concerns, please contact Jack Larrimore, Manager, Area Mail Processing & Facility Consolidation at (202} 268-3160.
f
o~~~~- 0uuams
-- Summarized PIR Header Page --
Type of Distribution to Consolidate:: Destinating Facility Name & Type:, Portsmouth P&DF
Street Address:! 345 Heritage Ave City: I Portsmouth
State:i NH 50 Facility ZIP Code: i 03801
District: • Northern New England Area:! Northeast
Finance Number: I 32-6920 Current 3D ZIP Code(s): i 038, 039
Miles to Gaining Facility:; 41 miles to Manchester, 53 miles to Southern Maine EXFC office: • Mike Walsh
Plant Manager:! N/A Senior Plant Manager:! Michael Labrie
District Manager: I Deborah Essler
Facility Name & Type:! Manchester P&DC Street Address: 1 955 Goffs Falls Rd
City:j Manchester State:' NH
50 Facility ZIP Code:! 03103 District:! Northern New England
Area: I Northeast Finance Number: i 32-4801
Current 3D ZIP Code(s): i 030-034 EXFC office: • Yes
Plant Manager:! N/A Senior Plant Manager:! Michael Labrie
District Manager: I Deborah Essler
Approval Date:! August 5, 2011 Implementation Date:1 January 1, 2012
PIR Type: Final PIR
I Southern Maine P&DC 79 Postal Service Way
I Scarborough
I ME $
I 04074 Northern New England Northeast
i 22-6901 039-043, 045, 048
I Yes James Lentz Michael Labrie
?§
I Deborah Essler
Date Range of Data:; January 1, 2012 ' December 31, 2012 Date this workbook was last saved: I 211/2013
Area Vice President:! Richard P. Uluski Vice President, Network Operations: I David E. Williams
Area AMP Coordinator: i Stu Teger NAI contact: ; Barbara Brewington
PIR Data Entry Page
Approval Signatures
PIR Type: F!n81 PJ8 lmplllmentatlon Dele: 01101/12
Dele....,.. of Dllla: ..l!ln-01-2012 - Dec>31-i912
lilA
2
Losing Facility Name and Type: Street Address:
City:
State:
Current SCF ZIP Code(s):
Type of Distribution Consolidated:
Gaining Facility Name and Type: Street Address:
City:
State:
Current SCF ZIP Code(s):
Savings/Costs
Staffing
Function 1 Workhour Savings
Non-Processing Craft Workhour Savings (less Maint!Trans)
PCES/EAS Workhour Savings
Transportation Savings
Maintenance Savings
Space Savings
Total Annual Savings
Total One-Time Costs
Total First Year Savings
Craft Position Loss
Executive Summary PIR Type: Final PIR Last Saved: February 1, 2013 Date Range of Data: 1/1/10-6/30/10
Portsmouth P&DF 345 Heritage Ave Portsmouth NH
038,039
Destinating
PIR vs Pre AMP PIR vs Approved
$4,674,033 $1,537,692 from Workhour Costs - Combined
$176,064 ($2,353) from Other Curr vs Prop
$922,880 ($227,394) from Other Curr vs Prop
$112,761 $585,280 from Transpottation HCR and Transpottation PVS
$2,765,657 $111,102 from Maintenance
$0 $0 from Space Evaluation and Other Costs
$8,651,396 $2,004,327
($41,193) $6,687 from Space Evaluation and Other Costs
$8,610,203 $2,011,014
116 47 from Staffing-Craft
15 8 from Staffing-PCESIEAS PCES/EAS Position Loss
::FIJ!\ilii~!ll!ll1:'!1:!"'1%'1~116~;@;m00 •••• 1~-~--~D~,~~::I1~.j;,~~-m .. ~------~~-WmF~-~w:~.G~~.ii!G~~-~·.;W:;·~~}'etJ>i!Jilit-·<iA-111 Ji L u•JJJGJJ
Service
First-Class Mail Service Performance (EXFC 0/N)
First-Class Mail Service Performance (EXFC 2 Day)
First-Class Mail Service Performance (EXFC 3 Day)
Customer Experience Measurement Overall Satisfaction - Residential at PFC level
Customer Experience Measurement Overall Satisfaction - Small Business at PFC level
3
Latest Quarter
Portsmouth P&DF Manchester P&DC Southern Maine P&DC
93.64% 95.73% 96.33%
90.59% 92.49% 93.85%
90.26% 89.43% 89.95%
93.0%
88.4%
PIR Executive Summary
Calculation Befe[eoctus Combined Losing and Gaining Facility Data: PreAMP Proposed PIR
Function 1 Workhour Costs $57,271,004 $54,134,663 $52,596,972 Non-Processing Craft Workhour Costs
$2,022,183 $1,843,766 $1,846,119 (less Maintenance & Transportation)
PCES/EAS Workhour Costs $8,300,360 $7,150,085 $7,377,479 Transportation Costs $7,750,110 $8,222,630 $7,637,349
Maintenance Costs $23,334,566 $20,680,011 $20,568,908 Space Savings $0 $0 $0
Total Annual Costs $98,678,223 $92,0311155 $90,026,827
Total One-Time Costs $0 $47,880 $411193
Total First Year Costs $98,678,223 $92,079,035 $90,068,020
Staffina
Craft Position Total On-Rolls 1,035 966 919 PCES/EAS Position Total On-Rolls 89 82 74
Approved AMP
Function 1 Workhour Savings $4,674,033 $1,537,692 $3,136,341 Non-Processing Craft Wor1<hour Savings $176,064 ($2,353) $178,418 (less MainVTrans}
PCES/EAS Workhour Savings $922,880 ($227,394) $1,150,274 Transportation Savings $112,761 $585,280 ($472,520)
Maintenance Savings $2,765,657 $1111102 $2,654,555 Space Savings $0 $0 $0
Total Annual Savings $8,651,396 $2,004,327 $6,647,068
Total One-Time Costs ($41 1 193) $6,687 ($47,880)
Total First Year Savings $8,610,203 $2,011,014 $6,599,188
Staffing Craft Position Loss 116 47 69
PCES/EAS Position Loss 15 8 7
PIR Executive Summary 4
5
Summary Narrative Last Saved: February 1, 2013
Losing Facility Name and Type: Portsmouth P&DF Current SCF ZIP Code(s): 038, 039
Type of Distribution Consolidated: Destinating
Gaining Facility Name and Type: Manchester P&DC and Current SCF ZIP Code(s): 030-034
Southern Maine P&DC 039-043, 045, 048
The Northern New England (NNE) District has successfully completed the destinating Portsmouth P&DF Area Mail Processing (AMP) plan. This plan transferred destinating SCF 038 mail processing operations and mail volume to the Manchester P&DC (NH) and destinating/originating SCF 039 mail processing operations and mail volume into the Southern Maine P&DC in Scarborough, Maine. The Portsmouth P&DF originating AMP (038-039) was finalized on October 1, 2009 into the Manchester P&DC. With this current destinating AMP, SCF 039 originating operations migrated to the Southern Maine P&DC along with destinating operations concurrently.
BACKGROUND
The Portsmouth P&DF is a postal owned facility that has been vacated of all Function 1 mail processing operations. Remaining at this facility are the Portsmouth City/Greenland delivery operations, Business Mail Entry Unit (BMEU), HQ/NEA Administrative field offices, training rooms, and building maintenance services.
The destinating Portsmouth P&DF AMP was conducted in three (3) phases;
Phase 1 redirected both originating and destination operations from eleven (11) 5 digit 039 zones into the Southern Maine P&DC on October 1, 2011. One (1) Delivery Bar Code Sorter (DBCS) machine from the Portsmouth P&DF was relocated along with the mail volume for SCF 039; this DBCS machine has been subsequently moved into the Manchester P&DC. On 8/1/11, a DIOSS machine was moved into the Manchester P&DC for processing STD "A" volumes from Portsmouth P&DF as part of the official AMP movement of mails.
Phase 2 coordinated the movement of two (2) DBCS machines along with a portion of the seventy eight (78) 5 digit SCF 038 zones for DPS and CR processing into the Manchester P&DC on November 12, 2011.
Phase 3 entailed the relocation of two (2) additional DBCS machines into the Manchester P&DC for handling the remainder of the SCF 038 zones into both DPS and CR processing and was finalized on November 19, 2011.
All Function 1 mail processing operations ceased in the Portsmouth P&DF after Dispatch of Value (DOV) on Saturday, November 19, 2011.
FINANCIAL SUMMARY
Financial savings from the consolidation of destinating operations were achieved via mail processing workhour savings and Transportation savings. First year savings are partially offset by one-time costs to relocate mail processing equipment from the Portsmouth P&DF to both the Southern Maine P&DC and the Manchester P&DC.
Total First Year Savings: AMP proposed savings $6,599,188 PIR vs. Pre AMP $8,610,203 Difference to proposed $2,011,014
Significant Function 1 work hour savings can be attributed to tour compression, increased BPI/productivity and overtime control in the gaining facilities.
PIR Summary Narrative
6
STAFFING IMPACTS
The AMP projected a reduction of 69 craft positions. Actual PIR craft reductions were 116 positions, a savings of an additional47 craft employees.
The AMP projected a reduction of 7 EAS positions. Actual PI R EAS reductions were 15 positions, a savings of an additional 8 EAS employees.
CUSTOMER & SERVICE IMPACTS
SCF 039 was upgraded from within the Southern Maine P&DC (AADC 040-043, 045, 048) in overnight First-Class Mail (FCM) service standards and downgraded to 2-day service from the Manchester P&DC (AADC 030-034) and Middlesex-Essex P&DC (AADC 018-019). It should be noted that SCF 039 is located within the state of Maine and was originally processed out of the Portland Maine facility prior to the opening of the Portsmouth P&DF in New Hampshire.
Service improvement across all performance categories as noted below in overnight, 2-day and 3-day measurements for both absorbing facilities:
PIR Summary Narrative
7
EXFC 0/D
EXFC 0/D
EXFC 0/D
The Customer Experience Measurement (CEM) Overall Residential at PFC level is 92.70% for Q3 FY12. The CEM for Small Business at PFC level in Q3 FY12 is at 87.40%.
RETAIL AND BUSINESS MAIL ENTRY UNIT (BMEU) IMPACTS
The Portsmouth P&DF contained no retail operations and the BMEU operations were not affected. All mail processing operations have been removed from Portsmouth. Carrier and other customer service operations remain.
PIR Summary Narrative
TRANSPORTATION CHANGES
Total First Year Cost: AMP proposed cost PIR vs. Pre AMP Difference to proposed
($472,520) $112,761 $585,280
The Transportation savings were based on the consolidation and rearrangement of Associate Office (AO) runs and the elimination of facility interchange trips (Portsmouth to Manchester and Manchester to Portsmouth). Other Transportation changes that are updated are due to renegotiation and increased fuel costs.
EQUIPMENT RELOCATION
A total of five (5) Delivery Bar Code Sorters and one (1) DIOSS machine were relocated as a result of this AMP.
Proposed relocation costs Actual relocation costs
($47,880) ($41,193)
A relocation savings of $6,687 were realized from the original AMP proposal due to the use of internal resources.
MAINTENANCE IMPACTS
The Maintenance slight overrun to the original AMP proposal is due to the filling of vacancies that were originally withheld.
Total First Year Savings: AMP proposed savings $2,654,555 PIR vs. Pre AMP $2,765,657 Difference to proposed $ 111,1 02
SUMMARY
The AMP feasibility study to move destinating operations into the Manchester P&DC and Southern Maine P&DC indicated a potential First-Year Savings of $6,599,188. The Post Implementation Review (PIR}, after finalization of the AMP process, indicates a First-Year Savings of $8,610,203. Overall results reflect a greater than expected potential savings than originally planned by a total of $2,011,014, with improvements to make service for overnight, 2-day and 3-day for all related service areas.
PIR Summary Narrative
8
9
Service Performance and Customer Satisfaction Measurement Last Saved: February 1, 2013
PIRType: Final PIR Implementation Date: 01/01/12
EXFC 0/D I I I
EXFC 0/D
EXFC 0/D
1 Overall Satisfaction (Overall Experience)
Satisfaction with Receiving (Experience with receiving)
Satisfaction with Sending (Experience with sending)
Satisfaction with most frequently visited PO (Experience with most frequently visitec
Satisfaction with most recent contact with USPS {Experience with most recent conta
Ukely to recommend the USPS
PIR Service Performance and Customer Satisfaction Measurement
I otilerworkhour Move Analysis I Losing Facilrty: Portsmouth P&DF Gaining Facility: Manchester P&DC Date Range of Data 01/01/12 to 12131/12
10
PIR Workhour Costs - Combined Facilities
.. &, ' 0 '" • T
~ ~ ~ ~
Totals 1 22,865
11
PIR Workhour Costs- Combined Facilities
•••• -~ ~ Totals 1 s33
I Distribution to Other AMP Worksheet Tabs I
1- ~··:1 -=r -· -.. :1 I ~7·:4 - ~7·:1 $71.·:1 Maintenance - Losing Maintenance - Gaining
12
PIR Workhour Costs- Combined Facilities
Supervisor Summary - Losing Supervisory - Gaining
summary l>y Group PreAMP ombined Proposed - Combined PIR -Combined Special Adiustments PIR to Prooosed- Change PIR to Pre-AMP- Ch~e ............ -~ """""""' """" ........... """"" """""""' -.. WKtnChange IPen:entChangEi ~Change PercertChar~ge WKinChonge Percent Change """"""'""' PercentCNinge
"Other Craft" Ops(less Ops going to 'Trans-PVS' 'Maintenance' Tabs 42,246 $1,912,41 36,606 $1,750,83 35,809 $1,662,057 $C -3,077 -791 -$88,7801 -5.07> -6,437 -15.2 .. -$250,358 -13.09%
Transportation Ops(goingto Trans-PVStab 26,552 $1,150,8 2-4,809 $1,082,14 30,368 S1,155,n4 5,559 22.41 $73,576' 6.80'.< 3,816 14.37 $4,894 0.43' Maintenance Ops (going to Maintenance tab 460,150 $20,236,87 •04.262 $17,789,76! 399,908 $18,091,232 -4,354 -1 OS> $301,467 169'.< ..00,241 -13.09'> -$2,145,641 -10.60'
SuDerVisorY 0 159,118 $8,300,36! 136,253 $7,150,08! 133,823 $7,377,.7S ~ -2,430 -1.7"' $227,394' 3.18 -25,295 -15.,.,., -$922,680 -11.120A Supervisor/Craft Joing Op •• 049 $109,76! 3,576 $92,92! 7,5C $184,062 3,971 111.03' $91,1331 9807> 3,499 86.42 $74,294 67.61r%
T~ 692,114 $31,710,24 607,787 $27,865,76! 607,455 $26,470,55· $C -332 -0.05 $604,7891 2.17> ..84,659 -1~ -$3,239,692 -10.22% -33 -0.05 804,78 2.17 --84,65 -1223 -3,239,6 -10.22'1<
consolidated with second gaining site
13
PIR Workhour Costs - Combined Facilities
I other Workhour Move Analysis I to 12131/12
14
PIR Workhour Costs - Combined Facilities
15
PIR Workhour Costs - Combined Facilities
[ --Distribution to Other AMP \1\/orkSheet Tabs I
Ops 617, 679, 764(31)
Ops765, 700 (34)
l---1 I I I I I J Maintenance - Losing
16
Ops 765,766 (34)
Maintenance -Gaining
PIR Workhour Costs- Combined Facilities
Supervisor Summary - Losing
PreAMP -"'Other Craft"' Ops(less Cps going to irans-PVS 'Maintenance' Tabs 22,410
Transportation Ops(going to Trans-PVS tab 23,173
Maintenance Ops (going to Maintenance tab 246,979
Supenriso<yO n.a1o Supervisor/Craft Johlg 0 2,830
Tota 368,201
Total Ad. 0 $0
17
:;ombined
-~
$1,011,921
$1,014,761
$10,550,581
$3,768,46e
$68,500 $16,414,29C
Pr sed - Combined .......... 22,410
23,173
248,484
n.a1o 2,830
369,706
Operation Number
"""~
$1,011,921
$1,014,76
$10,619.25
$3,768,46
$88,58 $16,482,961
PIR - Combined
'"""""""' -~ 20,179 $942,71
28,735 $1,064,27
233,443 $10,488,80<
70,122 $3,765,87
5,195 $119,62 357,674 $16,401.~
Supervisory - Gaining Annual Workhours
summary by Group
Special Ad'ustments PIR to Proposed - Change PIR to Pre-AMP- Change - """'" Wl<tnet.nge PercertCt.ng """"Cho""' Pe~Change -~0..,. Peroent CNrnge """'"0..,. -""'""' $() -2,231 -9.95~ -$69,209 -6.84% -2,231 -9.95 ...$69,209 -6.84-A $() 5,5fl2 24.00'! $69,509 6.85 5,5fl2 24.00 $69,509 6.85-A $() -15,041 -6.05 ..$130,454 -1.2:3% -13,536 -5.48'A -$61,775 -059% $() -2,688 -369'> .-$2,591 -0.07 -2.688 -3.68'A -$2,591 -O.OJO.A $() 2,365 83.69'> $51,065 74.48% 2,365 83.59'A $51,065 74.46'* $() -12,033 -3.25 -$81,680 -050% -10,527 -286'A -$13,001 -0.08%
-12,03 -325 -81,68 -050 -10,521 -2 -13,001 -0.08"A
PIR Workhour Costs- Combined Facilities
Losing Facility: Portsmouth P&DF
Type of Distribution Consolidated: Destinating
Workhour Costs - Losing Facility last Saved: February 1, 2013
~ !!Jili!l1,.,unction 4
11 41
12 42
,. " ,. .. 10 ..
" .. 17 47 ..
PIR Type•: -i;~i::i:,;:•c;';~:-i~i;i~R>:co:::lo:::,..,=,c::;,-::an::n:.c,_:::,~::od:<ti::O<:<F=o"' PIR.
Date Range of Data: Jan-01-2012 to Oee-31-2012
PIR Workhour Costs- Losing
PIR Workhour Costs· Losing
I Percent I -100.0"A> I IOIV/0! ~~----;;;rcent I -100.0% I IOIV/0! II Percent I -100.0% I IRJowu• II r••=n 1 ··~-~· 1 ... ---· II . -·----- I I (27) NOTES:
=============================================================================-~--~b·;~
20 PIR Workhour Costs - Losing
Gaining Facility: Manchester P&DC
Type of Distribution Consolidated: Oestinating
Workhour Costs - Gaining Facility last Saved. February 1, 2013
PIR Type*: ""~"i~;;;•:r,li:;-;~i;i~R>Cco:;;l;;-;umn=sT.;;s-:::an;;;n;;;ual"'~;:;e:;;-d ;;;fo<;-;F"-;n;td"PtR.
Date Range of Data: ~ to Dec:-31-2012
PIR Workhour Costs - Gaining
PJR Workhour Costs - Gaining
PIR Workhour Costs- Gaining
I ••·• ~ I I L..:=:::=:.__.L___::.__ _ ____,'--
(27) NOTES: -~J1'iJ!:·.''J%f:~
24 PIR Workhour Costs~ Gaining
Workhour Costs - Gaining Facility
Gaining Facility: Southern Maine P&DC
• .. • • .. • . • I PIR Type•: .;,;D,;;;i:,i';;a';;l,~;i~i;i~R,-;coiu=mns=;;;is-;;;an;;;o;;;u~""•"'ed«!o<=F;;:;;;,.., PIR Function 1 Function 4
11 $40.07 41 12 $47.00 --
Type of Distribution Consolidated: Destinating 1l $44..45 Date Range of Data: Jan-01-2012 to Dec-31-2012 14 $35.75 16 $25.73 ,.
PIR Worthour Costs- Gaining
PIR Workhour Costs. Gaining
-.._ .... ,v
(27) NOTES: :;'J@j,:I~H ,'gj;t~l~f',"Hn,:,~
28 PIR Workhour Costs- Gaining
Staffing - Craft PIRType: Final PIR
Data Extraction Date: 1/9/13 --------
Craft Positions
Gaining Facility: Manchester P&DC Finance#: 32-4801
Finance#:
Craft Positions
, . ._ . ._ . ._ . ._ . ._._, . ._ . ._ . ._ . ._ . ._._, I I I
j PIR vs Pre AMP j PIR vs Proposed j
Total Craft Position Loss:! 116 ! 47 ! .............. __ .~ ................ ~ (Above numbers are carried forward to the Executive Summary)
29 PIR Staffing -Craft
Staffing - PCES/EAS
Data Extraction Date: 1/9/2013 PIR Type: Final PIR
Losing Facility: Portsmouth P&DF Finance# ..:::3.::.2-..:::6:..:92:..:0:..._ ____ _
PCES/EAS Positions On-Rolls
EAS Staff currently on rolls detailed to other offices.
30
PIR Staffing- PCES/EAS
Gaining Facility: Manchester P&DC Finance # 32-4801
PCES/EAS Positions
31
PIR Staffing - PCES/EAS
Gaining Facility: Southern Maine P&DC Finance# 22-6901
PCES/EAS Positions
~--.--.-.-----------------------~---------------------~--------------------------~ ' ' (37) ' (38) ' 1 Total PCES/EAS Position~ PIR vs Pre AMP 1 PIR vs Proposed 1
I Lossl 15 I 8 I I I I I
L-------------------------------_._·------------------~--------------------------~ (Above numbers are carried forward to the Executive Summary)
32
PIR Staffing- PCES/EAS
Losing Facility: Portsmouth P&DF
Type of Distribution Consolidated: Destinating Data of HCR Data File:
Route#
33
Transportation - HCR
PIR vs Pre AMP Change Analysis
PIRvs Proposed
PIR Type: Final PIR
PIR
PIR Transportation HCR - Losing
Transportation - HCR
Gaining Facility: Manchester P&DC and Southern Maine P&DC
Date of HCR Data File: 01/01/13 CET for Inbound Dock:
CET for Cancellations:
Route#
34
PIR Type: Destinating
CETforOGP: ------CT for Outbound Dock:
PIR
PIR Transportation HCR - Gaining
Totals 993,315 891,837
35
$2.36 $0.00
Summary HCR Losing & Gaining
Change Analysis Pre PIRvs Pre PIRvs
Losing
Gaining
Total PIR vs Pre AMP Transportation-HeR Savings: ($117,655) (from losing and gaining facilities)
Total PIR vs Proposed Transportation-HeR Savings: ($658,856) (from losing and gaining facilities)
Total Transportation
PIRvs Pre AMP
HCR ($117 655) PVS $4,894
Total PIR vs Pre AMP Transportation (PVS & HCR): ($112,761) (This number carried forward to the Executive Summary)
Total PIR vs Proposed Transportation (PVS & HCR): (This number carried forward to the Executive Summary)
PIRvs Proposed
($658 85Sl $73,576
($585,280)
PIR Transportation HCR -Gaining
Date Range of Data: Jan-01-2012 --to-- Dec-31-2012
Facility: Portsmouth P&DF Finance Number: 32-6920
····- (2) I (3)
Proposed I PIR
Variances Total Annual Costs
Change Analysis
Dollars
(11) Total PIR vs Pre AMP PVS Savings: (This number added to the HCR worksht)
36
PIRvs PIRvs PreAMP Proposed
J$68,68_'1_} $0
$4,894
I I
Transportation - PVS
PIRType: Final PIR
Manchester P&DC Southern Maine P&DC 32-4801 22-6901
I (8)
I •P.:odl (11)
PIR PIR
Variances Total Annual Costs Variances Total Annual Costs
PIRvs PIRvs PIRvs Change Analysis PreAMP Proposed
Change PIRvs Analysis PreAMP Proposed I
Dollars $4067 _______H.067_ Dollars
(11) Total PIR vs Proposed PVS Savings: (This number added to the HCR worksht)
$6!MQ9 $69,509
$73,576
PIR Transportation - PVS
J
MPE Inventory Last Saved: February 1, 2013
Data Extraction Date: 1/26/2013 -==..:..::.... ___ _ PIR Type: Final PIR
Facility: Portsmouth P&DF Manchester P&DC Southern Maine P&DC
PIR Equipment
Proposed PIR Variance in
Relocation Relocation Costs Costs Costs
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$39,900 $34,219 ($5,681)
$0 $0
$7,980 $6,974 ($1,006)
$0 $0
$0 $0
$0 $0
$0 so I $0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0
$0
$0
~~
$47,880 $41193 ($6 687 --:,.. ...:; ;:>..
Notes: Carriedto J
Space Evaluation and Other Costs
37 PIR MPE Inventory
LDC 36
I LDC 37
LDC 38
LDC39
I LDC 93
Maintenance
Date Range of Data: Jan-01-2012 --to- Dec-31-2012
Facility: Portsmouth P&DF Finance Number: ..:3.;;;2...;-6;..;9.;;;2;;;.0 __ _
Work hour Activity
Mail Processing Equipment $
Building Equipment $
Building Services $ (Custodial Cleaning)
Maintenance Operations $ Support
Maintenance
Wotkhour Cost Subtotal
Maintenance Parts, Supplies & $ Facility Utilities
Grand Total $
Ol
9,2091
8,201 I
Ol
Ol
17,409 I
Variances Total Annual Costs
Change Analysis PIRvs Pre PIRvs AMP Proposed
Dollars _($3 135 873} J.$25 097)
0
0
0
0
0
0
$0
0
PIR vs Pre AMP - Maintenance Savings: PIR vs Proposed - Maintenance Savings:
38
PIR Type*: Final PIR
Manchester P&DC Southern Maine P&DC 22-6901
Proposed I PIR
4,157,620 I 4,473,280 $ 4,904,861 4,800,617
642,4261 680,598 $ 1,320,101 1,400,707
$ 1,926,030 I 1,945,372 3,467,872 3,408,779
426,4761 460,747 775,747 721,006
$.Wtlli·- 5681 42,429 150,679 157,696
$-'-I!Pn 7,153,120 I 7,602,426 10,619,259 10,488,806
$ $ $1,242,8661 $1,247,4661 $1,058,415
•• I $
Variances Total Annual Costs Variances Total Annual Costs
Change Analysis PIRvs Pre PIRvs Change Analysis PIRvs Pre PIRvs AMP Proposed AMP Proposed
Dollars $616 441 $233 499 Dollars ($246,226) J..$319 505)
$2.765,657 $111,102
(These numbers carried forward to the Executive Summary) (These numbers carried forward to the Executive Summary)
PIR Transportation- PVS
(1)
Distribution Changes Last Saved: February 1, 2013
Losing Facility : Portsmouth P&DF PIR Type: Final PIR
Type of Distribution Consolidated: Destinating Date Range of Data: Jan-01-2012 --to-- Dec-31-2012
Place a "X" next to the DMM labeling list(s) revised as result of the approved AMP.
DMM L001 DMM L011
Identify the date of the Postal Bulletin that contained DMM labeling list revisions.
(2) Postal Bulletin 1 0-6-11 (PB 22321)
X DMM L002
X DMM L003
X DMM L004
X DMM L005
DMM L006
DMM L007
DMM L008
DMM L009
L_~ DMM L010
-
DMM L201
DMM L601
DMM L602
DMM L603
DMM L604
DMM L605
DMM L606
DMM L607
X DMM L801
Was the Service Standard Directory updated for the approved AMP?
(3) Yes
(4) Drop Shipments for Destination Entry Discounts
FAST Appointment Summary Report NASS
Facility Name Total No-Show Late Arrival 0 en
Month Losing I Gaining Facility Code Schd Count % Count % Count %
Nov '12 Losing Facility 038 Portsmouth N/A
Dec '12 Losing Facility 038 Portsmouth N/A
Nov '12 Gaining Facility 030 Manchester N/A
Dec '12 Gaining_ Facility_ 030 Manchester N/A
Nov '12 Gaining Facility 040 Southern Maine 528 168 31.82% 123 23.30% 0 0.00%
Dec '12 Gaining Facility_ 040 Southern ~~ine _ ·~~ ~ 141 33.25% 81 19.1~ 0 0.00% -~ -
(5) Notes: Portsmouth goes to Manchester. Manchester goes to Nashua L&DC.
Count
360
283
Closed %
68.18%
66.75%
39 PIR Distribution Changes
Unschd Count
10
7
Losing Facility: Portsmouth P&DF
5-Digit ZIP Code: .;:0.:::38:,:0:.,.:1~----Data Extraction Date: 01/24/13
1. Collection Points Number picked up before 1 p.m.
Number picked up between 1-5 p.m.
Number picked up after 5 p.m.
Total Number of Coiled ion Points
2. How many collection boxes are currently designated for "local delivery"?
3. How many "local delivery" boxes were removed as a result of AMP?
4. Delivery Perfonnance Report
% Carriers returning before 5 p.m.
Customer Service Issues Last Saved: February 1, 2013
r=o= J
I o I
5. Retail Unit Inside Losing Facility (Window Service Tlmes) 6. Business (Bulk) Mail Acceptance Hours
7. Can customers obtain a local postmark in accordance with applicable policies in the Postal Operations Manual? Yes
8. Notes:
Gaining Facility: Manchester P&DC Gaining Facility: Southern Maine P&DC
9. What postmark is printed on collection mail?
Line 1 Manchester NH 030 Line 1 So. Maine P&DC 040
Line 2 date & time Line 2 date & time
40
. .,~ ... ,~ PIR Customer Service Issues
Space Evaluation and Other Costs Last Saved: February 1, 2013
Losing Facility: Portsmouth P&DF Date: ----=0=2/'-"0.:..:1/-'-13"----
Space Evaluation
1. Affected Facil~y
2. One-Time Costs -Enter any one-time costs: _ _.;$::.::0:.....- $0 $0 (These numbers carried below to One-Time Costs section.)
3. Savings Information
Space Savings ($): _ _..$_0 __ $0 $0 (These numbers carried forward to the Executive Summary)
4. Did you utilize the acquired space as planned? Explain. All mail processing operations have been removed from the Portsmouth building. Carriers and other customer svc operations remain.
5. Notes:
One-Time Costs
Employee Relocation Costs $0 $0 $0
Mail Processing Equipment Relocation Costs $47,880 $41,193 ($6,687)
41
(from MPE Inventory)
Facility Costs $0 $0 $0 (from above)
Total One-Time Costs $47,880 $41,193 ($&,687) PIR costs carried forward to Executive Summary)
Remote Encoding Center Cost per 1000 Losing Facility: .:..P..:o.:..;rt.:..;snno.:..;.:..;u:;.;th:.:....:...P.:..;&;:.D:....F _______ _
Pre AMP- FY 11 Range of Report:
Gaining Facility: Manchester P&DC & Southern Maine P&DC
PIR- FY 12