No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTS
SN-1Phase I Environmental
Assessments for City's Brownfields Program
Nuna Tersibashian SRCRDConduct Phase I Environmental Assessments in Pacoima and Wilmington Areas.
$ 115,000 Tetra Tech 12/1/2014 COMPLETED
SN-2ASewer Planning Support Services
(Task 1)Fernando Gonzalez WESD
Provide sewer planning and Technical support and as-needed services
$ 2,600,000 Tetra Tech 10/9/2014 Issued NTP 11/21/2014
SN-2BSewer Planning Support Services
(Tasks 2 and 4)Fernando Gonzalez WESD
Provide Public Outreach and GIS Enterprise support and as-needed services
2,800,000$ Brown and Caldwell 10/9/2014 Issued NTP 11/21/2014
SN-2CSewer Planning Support Services
(Task 3)Fernando Gonzalez WESD
Provide Sewer Condition Assessment support and as-needed services
2,600,000$ CDM Smith 10/9/2014 Issued NTP 11/21/2014
SN-3Implementation of Fleet
Optimization Program Phase II & III
Sal Aguilar SRSSD
Deploy services with the Zonar 2020 Mobile Communications Tablet and provide as-needed support including planning, facilitation, coordination of activities for: the full Valley Division Zonar Deployment represented by East Valley (Phase II - A) and by West Valley (Phase II - B); and for the remaining full City Zonar deployment and implementation represented by South Division (Phase III).
$ 2,703,576 AECOM 5/26/2015 COMPLETED
SN-4MIKE Urban Hydrodynamic Model
ValidationManik Mohandas WESD
Perform a model validation of existing MIKE Urban Hydrodynamic Model; Compare the model results against the newly measured flow data being collected by the City at approximately 170 flow monitoring locations; Re-calibrate dry- and wet-weather models if model validation shows that the existing model does not meet the calibration criteria.
$ 480,000 CH2M 5/28/2015 COMPLETED
SN-5GIS Support for Implementation of
Routing ProgramsSal Aguilar SRSSD
Provide one (1) GIS Supervisor and eight (8) Specialist/Analysts to work under direction of LA San TOS Manager to provide technical services for the implementation of Solid Resources Collection Vehicle Routing Programs including addressing Point-To-Point (PTP) and Continuous Routing Solutions.
$ 3,899,556 Tetra Tech 11/12/2014 Issued NTP 2/13/2015
SN-6
Implementation Support Services for the Exclusive Commercial and Multifamily Solid Waste Franchise
System
Daniel Meyers SRCRDAssist the City in evaluation, negotiation, and implementation of Franchise system
$ 10,200,000 CH2M 11/25/2014 Issued NTP 1/9/2015
SN-7Environmental Assessment for
DCTWRP Lease ExtensionKwasi Berko WESD
Perform both the Environmental Baseline Studies and the Environmental Assessment for the lease renewal at DCTWRP
$ 198,835 Tetra Tech 12/30/2014 Issued NTP 2/25/2015
SN-8East West Valley Interceptor
Sewer Planning StudyMario Dimzon WESD
Conduct a study to determine the feasibility of increasing flow into Donald C. Tillman Water Reclamation Plant (DCTWRP) by diverting additional wastewater to DCTWRP primarily from the North Hollywood area.
$ 149,500 ARCADIS
(top ranked firm)11/7/2014 COMPLETED
SN-9Wastewater Collection Flow
Gauging Service IIFernando Gonzalez WESD
Installation, calibration, collection and maintenance of 91 permanent gauging units in the wastewater collection system for dry- and wet-weather calibration and validation of the RD/I study
$ 625,000 TRC 11/16/2014 Issued NTP 1/20/2015
SN-10
Slurry Fracture Injection Well #1 Deepening At Terminal Island Water Reclamation Plant (TIWRP) for Terminal Island Renewable Energy (TIRE) Project
Alan Tran HTPDeepening well work Slurry Fracture Injection (SFI) well #1
$ 285,000 CANCELED
SN-11Franchise Information System Implementation and Integration
Anita Fernandez ICSDCreate and implement a complete Franchise Information System (FIS) solution
$ 3,500,000 Tetra Tech 11/24/2014 Issued NTP 3/19/2015
LA SANITATION - ON-CALL CONTRACT TASK ORDER SOLICITATION (TOS) LIST STATUS
AWARDED TOS
Page 1 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-12Technical Services for Monitoring in the Upper LA River and Santa
Monica Bay WatershedsVivian Marquez WPD
Establish two (2) new sampling locations equipped with autosamplers to meet stormwater permit monitoring requirements
$ 148,000 Brown and Caldwell 2/10/2015 Issued NTP 5/8/2015
SN-13 InfoMaster Sewer Planning Tool Mario Dimzon WESDReplace the existing Sewer Planning Optimization Tool (SPOT) application with a new Commercial-Off-The-Shelf (COTS) software program called InfoMaster
$ 140,000 Stantec
(formerly MWH)12/30/2014 COMPLETED
SN-14On-Call Environmental Services To
Support City's Brownfields Program
Nuna Tersibashian SRCRDProvide on-call services to conduct various environmental assessment investigations throughout the City
$ 400,000 Carollo 1/27/2015 Issued NTP 2/11/2015
SN-15
Safety Analysis for Natural Gas Fueling Infrastructure and
Vehicular Fueling Operations at Solid Resources Collection Yards
Bernadette Halverson SRSSD
Provide one (1) qualified Safety Engineer to assist LA SAN and recommend safety improvements to the design, operation, and maintenance of the natural gas (liquefied and compressed natural gas) fueling infrastructure and vehicular fueling operation at the Solid Resources Collection Yards
95,000$ CANCELED
SN-16North District Wastewater
Maintenance Yard Relocation and Improvement
Vincent Tan WCSD
Require the services of a consulting firm experience in dealing with commercial real estate to provide a feasibility study and come up with the best alternative between rehabilitating and relocating WCSD, North District Wastewater
80,000$ ARCADIS 2/5/2015 COMPLETED
SN-17 One Water LA Phase II Lenise Marrero WESD
Provide baseline study of the City's current water situation; Develop City's future water potential; Develop Water Strategies and Alternatives including climate change mitigation and adaptation; Develop Cost-Benefit Analysis, Near-Term Comprehensive Capital Improvement Program, and Implementation Strategies; Pilot studies and reports; Develop recommendations for Citywide Policies and Ordinances; Prepare Final Plan and Programmatic Environmental Documenation; Conduct Stakeholder Workshops and Advisory Committee Meetings, Public Outreach, and Marketing Strategy
5,775,000$ Carollo 7/29/2015 Issued NTP 8/19/2015
SN-18Finished Water Disinfection
Standard Study at TIWRP AWTFSeung Tag Oh TIWRP
Evaluate the use of free chlorine in lieu of combined chlorine as a residual disinfectant for the injection of 100%, or near 100%, of advanced treated recycled water in the Dominguez Gap Barrier Project (DGBP). The issues to be evaluated will include well fouling protection, and blending TIWRP water that will contain free chlorine with the Metropolitan Water District of Southern California (MWDSC) water that is chloraminated
42,169$ CH2M 2/26/2015 COMPLETED
SN-19DCT Groundwater Replenishment
(GWR) Advanced Water Purification Facility Pilot Test
Roshanak Aflaki DCTWRP
Test and identify the most suitable membrane technology and disinfection for advanced treatment. The selected firm will provide technical assistance, coordinate data collection and analysis as well as providing test units for pilot testing.
2,957,917$ Brown and Caldwell 4/6/2015 Issued NTP 6/30/2015
SN-20Westinghouse Distributed Process Family (WDPF) Sytem Support at Hyperion Treatment Plant (HTP)
Charles Lee ICSD
Support WDPF Distributed Control System (DCS) at HTP including 24/7 and telephone supports and as-needed basis Field Engineering Support; provide recommendation for WDPF de-commissioning for LAWINS at HTP
$ 510,000 ARCADIS 1/26/2015 Issued NTP 01/07/2016
SN-21Specialized and Expert Services
for TMDLs and Related Regulatory Support
Vivian Marquez WPD
conducting technical analysis; organizing and conducting scientific studies; preparing technical and regulatory documentation for TMDLs and related water quality standards; preparing technical packages; providing support for hearings and testimony; providing technical support for the integrated monitoring programs, and lending data analysis support for permit reporting requirements
$ 1,500,000 Larry Walker Assoc. 3/27/2015 Issued NTP 6/3/2015
Page 2 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-22 EWMP Project Concept Reports Hubertus Cox WPD
Develop four (4) EWMP Concept Reports: 1) the Pan Pacific Park Regional EWMP Projects; 2) the Adams Drain Low Flow Diversion in the Ballona Creek watershed; 3) the Rivera Country Club Stormwater BMP Project in the Santa Monica Bay watershed; and 4) the “Triangle Area” Stormwater BMPs in the Marina del Rey watershed
80,000$ GeoSyntec
(top ranked firm)4/20/2015 COMPLETED
SN-23Environmental Monitoring Support
ServicesFarhana Mohamed EMD
To coordinate outsourcing of various legally mandated and other analyses of various samples that the Environmental Monitoring Division (EMD) cannot analyze in-house as well as very specialized training
$ 2,980,000 TRC 5/26/2015Issued NTP 6/29/2015$2,980,000 for 4 years
SN-25Brownfields Program Support
ServicesNuna Tersibashian SRCRD
Provide on-call technical consultation, Grant writing, and project delivery services for potential or actual grant-funded brownfield sites within the City
100,000$ TRC 6/11/2015 Issued NTP 7/23/2015
SN-26 ATF Optimization Project Cyrous Gilani WESD
Provide the fund to purchase the testing equipment required to perform the tests for City’s Air Treatment Facilities (ATFs) on both biological and carbon odor scrubbers. This TOS will also be used to compensate for odor and VOC tests required to verify the odor removal improvement
$ 130,224 Hazen & Sawyer 6/9/2015 COMPLETED
SN-28
Technical Services, Research, and Analysis regarding Wastewater Flow Gauging (WFG) Used to
Charge Burbank for Wastewater Services
(Wastewater Flow Research and Analysis)
Susan Rocha FMD
LA San and City of Burbank are jointly hiring a consultant to determine flow gauging discrepancies that directly impact City of LA's wastewater net flow and strength calculation and to determine a representative way to calculate Burbank's net flow and strength.
$ 149,000 CDM Smith 8/28/2015 Issued NTP 6/23/2016
SN-29Developing Program for Clean
Water CampusScott Hare WESD
Provide a workplace relocation strategy, develop preliminary schedule, survey work styles of all LASAN employees, conduct programing interviews to identify facility requirements and technology assessment, incorporate findings into proposed workplace standards in a design planning report, investigate and report on different methods project delivery, assist the bureau with financial feasibility and investigate and report on alternative methods of financing, file for grants where appropriate and as well as coordinate the community outreach and stakeholder engagement including the Council office, other bureaus and departments. Assist with the acquisition of adjacent property, by interacting with all stakeholders, including GSD, Council Committees, BOE, DBS and others.
$ 795,898 Arcadis 11/16/2015 Issued NTP 01/06/2016
SN-30
Construction Management Consulting Services for CLARTS
Stormwater and Safety Improvements Project
Rosalia Rojo SRPCD
Provide technical support and guidance on the construction management for the successful construction of the CLARTS Stormwater and Safety Improvements project in order to complete the construction in a limited time, necessary remain compliant with the 2014 General Permit and the City’s LID Ordinance, and ensure that CLARTS daily operations are minimally impacted.
$ 657,000 ARCADIS 8/10/2015 Issued NTP 10/7/2015
SN-31Hollenbeck Park Lake
Rehabilitation Feasibility StudyWing Tam WPD
Provide technical expert services to WPD to develop and implement a Floating Wetland Island (FWI), and an enhanced Aeration system and necessary pumps and piping in the Lake at Hollenbeck Park lake to improve the Lake’s water quality
$ 146,296 CH2M 6/5/2015 COMPLETED
Page 3 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-32
Technical Support Services for Phase IV of Catch Basin Screens
& Insert for the Machado Lake Trash TMDL
Alice Gong WPD
Technical support services in meeting TMDL mandated requirements for Machado Lake. Services may include providing engineering technical support and assistance with water quality monitoring, improvements to existing screens and inserts, and meeting compliance deadlines
$ 295,586 TRC 9/25/2015 COMPLETED
SN-33Strategies and Support for Water
Resources SystemsLenise Marerro WESD
Provide support for sustainable water resource programs; ensure accountability and alignment with the Mayor's sustainability plan by incorporating plan progress and outcomes to WESD programs; act as liaison to regional agencies to achieve integrated and coordinated planning; identify sustainable practices to be weaved into current and future water resources planning efforts; provide expert review of WESD reports to identify gaps in and opportunities for integration; conduct technical presentations and outreach in coordination and alignment with LASAN's clean water program marketing & branding efforts; collect and perform expert analyses of data in collaboration with City staff
$ 149,117 Parsons Brinckerhoff
(2nd ranked firm)7/21/2015 COMPLETED
SN-34
Specialized and Expert Services for Implementation of Enhanced
Watershed Management Programs
Hubertus Cox WPD
Provide technical and expert services to support the LASAN Watershed Protection Division in implementing the new MS4 Stormwater Permit and the associated Enhanced Watershed Management Programs (EWMPs). Services will include: finalization of draft EWMP plans; technical and regulatory support for TMDL implementation and development and implementation of related Time Schedule Orders; preparation of annual reports to RWQCB and development of applications for watershed-wide data collection and analyses; technical and regulatory support for the adaptive management of the EWMPs and preparation of revised EWMPs as needed; development and preparation of project plans and concept reports for watershed control measures and BMPs; modeling of impacts and benefits (water quality improvements, integrated water resources) of watershed control measures; technical support for identifying and implementing funding strategies for the EWMPs.
$ 1,990,000 Larry Walker Assoc. 8/11/2015 Issued NTP 10/16/2015
SN-35 Treatment Plants Planning Support Cyrous Gilani WESD
Provide technical and expertise to support the advanced planning needs for City's wastewater Treatment plants and DGUP implementation and monitoring; augment the existing staff in project management and control, evaluating and recommendation process improvement actions, review plans
$ 2,600,000 Kenndey/Jenks 11/10/2015 Issued NTP 4/4/2016
SN-36Hyperion Regional Water Reuse
Alignment Study Phase IIHi Sang Kim HTP
Development of strategy approach for reuse of Hyperion water; Identify approach for LADWP/MWD and other relevant agency discussions; Identify approach for West Basin negotiations; Regulatory issues; Institutional issues; Legal and Adjudication Issues associated with groundwater basins; Water Rate Strategy; Decentralized Treatment; Los Angeles Basin Recycled Water Demand and Water Quality Analysis; Cost-Benefit Analysis of various treatment/distribution alternatives; Analysis of the existing processes as an evaluation of potential changes to the treatment processes and the impact that these changes may have on the balance of the plant; Phasing/Modernization alternatives; Pilot Study approach on recommendation treatment process alternative; and Consultation Assistance.
$ 145,000 Stantec
(formerly MWH)9/4/2015 COMPLETED
Page 4 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-37Sewer Laterals Connection
Financial Assistance ProgramAbdul Danishwar WESD
Provide technical services related to the City’s Sewer Backwater Prevention Valve (SBV) Rebate Program, Sewer Laterals Connection Financial Assistance Pilot Program, and Sewer Laterals Condition Assessment; Public Outreach
$ 150,000 7/22/2016 ON HOLD
SN-39Proposition O Projects
OptimizationWing Tam WPD
Provide technical services related to the City's Prop O projects; examine as needed: physical, chemical, and biological characteristics of the Prop O projects and prepare operations management manuals that will establish proper protocols for long term sustainability of the completed projects; provide training of City staff to optimize performance of the projects.
$ 1,305,572 Carollo 7/20/2015 Issued NTP 8/1/2015
SN-40Chief Sustainability Officer Network Mobilization and
ManagementDoug Walters WESD
Assit City staff to create and maintain a committed group of CSOs to drive implementation of the City of Los Angeles’ Sustainable City pLAn. The services include but are not limited to: provide technical advice on sustainability initiatives and environmental regulations; facilitate workshops; conduct surveys and assessments; prepare next steps and write reports per the Sustainable City pLAn requirements.
$ 372,673 AECOM 8/28/2015 Issued NTP 11/02/2015
SN-41University Park Rain Gardens Pilot
StudyWing Tam WPD
Provide technical services to conduct the pilot study of the University Park Neighborhood Rain Gardens Project. Develop concepts and implement 35 rain gardens and evaluate water quality improvements
$ 510,000 GeoSyntec 9/25/2015 Issued NTP 12/22/2015
SN-42NEIS Division Street Shaft Site
RemediationScott Hare WESD
Provide technical services for the NEIS Division Shaft Site remediation at 2110 San Fernando Rd. Operate a Soil Vapor Extraction System in order to remediate Volatile Organic Compounds (VOCs) at the site, and prepare associated reports and case closure documents. Monitor groundwater and may install additional wells at the Regional Water Quality Control Board's request
$ 518,800 Brown and Caldwell 8/13/2015 Issued NTP 8/25/2015
SN-43Pilot-to-Scale Stormwater Capture
InitiativeKosta Kaporis WPD
Provide as-needed support and guidance on the planned pilot study. Services include but are not limited to: leading a collaborative governance exercise between the three participating agencies, oversee the planning, design, and installation of stormwater managment systems, such as networking cisterns, rain gardens, and infiltration drywells at five to ten locations, coordinate the data collection, and communicate their expertise and observations as part of the stakeholder process with all involved agencies and the larger community
623,650$ Tetra Tech 9/25/2015 Issued NTP 10/01/2015
SN-44Specialized and Expert Regulatory
ServicesPaul Cobian RAD
Provide highly specialized and expert services on as needed basis during the course of four year period. These services may include, but are not limited to; preparation of environmental documents; analysis of regulatory, legislative and compliance issues; conducting water, wastewater, biosolids, and air quality studies; reviewing and responding to draft documents, communications; and/or any related work related to regulatory, legislative, permit, and legal issues pertaining to LASAN operations.
$ 3,600,000 Larry Walker Assoc. 10/7/2015Issued NTP 01/25/2016
$3.6M for 4 years ($600K annually)
Page 5 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-45Implementation of Hollenbeck Park
Lake Rehab ProjectWing Tam WPD
Provide technical services to WPD to implement the lake rehabilitation project as recommended during the feasibility study which was completed in June 2015. The project includes; preparation of plans and installation of additional 25 Floating Wetland Islands(FWIs), installation of aeration system, evaluation, restoration of repair of existing filtration and chemical feed system; start-up and optimization services, and water quality assessment.
$ 800,000 CH2M 11/10/2015 Issued NTP 01/27/2016
SN-46Vegetation Risk Assessment and
Preliminary Design to Protect Trees at DCTWRP
Kwasi Berko WESD
Provide technical services for vegetation risk assessment and preliminary design to protect trees on berms at Donald C. Tillman Water Reclamation Plant (DCTWRP)
143,393$ Arcadis 10/20/2015 Issued NTP 11/12/2015
SN-47Public Right-of-Way Stormwater Low Impact Development (LID)
Wing Tam WPD
Support stormwater project management for construction and reconstruction in public streets ordinance development; Develop green street infrastructure implementation details, process, and data collection; develop green streets design criteria; develop GIS overlays; Stormwater management for public right-of-way projects handbook; hanbook rollout; as-needed services; and project management
410,000$ Geosyntec 6/2/2016 Issued NTP 8/1/2016
SN-48HTP Recycled Water Market Rate
StudyDale Burgoyne FMD
Review all pertinent documents, reports, assignments, capital projects, and water quality reports, etc.; Develop the theoretical framework for pricing the HTP’s effluent; Evaluate the supporting data; Develop alternatives for pricing and recommend a pricing approach, including recommended prices, addressing the elements of the theoretical framework developed for pricing HTP effluent;
$ 146,949 Parsons W&I 12/28/2015 COMPLETED
SN-49Wastewater Design Storm and Per-
capita Rate AnalysisManik Mohandas WESD
Revise the important guiding factors of wastewater per-capita generation rates, projection trends for future years and design storm methodology, that are crucial for the long term planning of the sanitary sewer infrastructure
230,027$ Arcadis 2/18/2016 Issued NTP 4/28/2016
SN-51Water Resources Planning Support
Lenise Marrero WESD
assist LASAN staff with work including, but not limited to: coordination with key non-profit organizations to develop cohesive integration strategies for water resources including maximizing recycled water; working with regional agencies to develop multi-beneficial projects and improve regional integration strategies (including regional project cost-sharing); participating in City wide programs (such as Green Streets, Living Streets, re:Code LA, and others) and providing expert review of Citywide reports to identify gaps and opportunities for integration and funding; collecting and performing expert analyses and reviews of data in collaboration with City staff as related to recycled water, stormwater capture and all other water resources planning.
400,000$ Parsons Brinckerhoff 3/8/2016 Issued NTP 4/22/2016
SN-52 Management Support for LAWINS Anita Fernandez ICSD
Review and respond to Requests for Information (RFI), Requests for Changes, and Requests for Special Plant Accommodations (RSPAs), construction shop drawings and submittals and provide assistance with Distributed Control System contract management for the LAWINS project; assist LASAN with proficiency in control system vendor selection and hands‐on delivery experience with complex and long term control system delivery contracts
1,100,000$ CH2M 12/15/2015 COMPLETED
Page 6 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-53LASAN Program Management
ServicesAlex Vazquez FMD
Tasks include but not limited to: 1) Programs’ policies: review, analyze, recommend practices and policies for each program including asset management, establish short/long term goals, and strategies for each program; 2) Resources to gather information to respond in a factually, efficient, and timely manner to various requests from elected officials, community groups, public, media, etc.; 3) Mid-term review of Clean Water Program’s 10 year CIP and rate analysis; and 4) Any tasks relating to LASAN programs as directed by LASAN Director
$ 14,000,000 Carollo 1/15/2016 Issued NTP 6/1/2016
SN-54East West Valley Interceptor
Sewer (EWVIS) Concept ReportAlbert Lew WESD
A Planning Study Report has been completed for EWVIS, which include a selected sewer alignment, preliminary pipe sizes, number of pump stations and diversion structures, and other miscellaneous etc. Now, LASAN plans to hire a consultant to repare a concept report for the proposed EWVIS to convey the additional wastewater from the North Hollywood area to DCTWRP to increase the production of recycled water at DCTWRP.
$ 129,502 Arcadis 2/18/2016 COMPLETED
SN-55
Environmental Review and Analysis for the Lopez Canyon
Equestrian Trails and Trail Head Project
Adriana Borrayo SRPCD
Perform an environmental review and analysis of a project consisting of a series of equestrian trails and trail heads including two additional trail routes in the vicinity of Lopez Canyon Landfill. Route A connects to the east side of the landfill slopes across the canyon to an existing County trail; and Route B connects to the north side of the landfill boundary along a ride connecting to an existing trail on the north side of the landfill boundary.
$ 139,480 HDR 3/8/2016 Issued NTP 4/26/2016
SN-56Phase II Environmental Site Assessment for Wilmington Industrial Park Block 27
Nuna Tersibashian SRCRDProvide Phase II Environmental Site Assessment for Wilmington Industrial Park Block 27 at 518-230 North McFarland Avenue in the City of Los Angeles
94,856$ TRC 3/10/2016 Issued NTP 4/13/2016
SN-57Analysis of a Proposed Solid
Resources Joint Partnership Plan & Related Support
Rosalia Rojo SRPCD
Prepare a conceptual facility plan and env. analysis study for material recovery & organic mgmt. facility at 6001 Jefferson; cost analysis for a 20-yr and 50-yr financial plan showing the required investment including capital investment needed, O&M costs, permitting required; analysis & assistance in drafting MOU establishing a joint solid resources mgmt. partnership between LASAN and Culver City; related community outreach
300,000$ HDR 6/1/2016 Issued NTP 10/17/2016
SN-58Landfill Technicians to Support
Environmental Compliance Inspectors
John Hamilton SRPCD
Technician(s) needed to support the landfill monitoring group for the following: Air quality surface and ambient monitoring of five landfills throughout the City, Landfill Groundwater sampling for five landfills, Landfill gas collection well Tuning, Instrument calibration, Stormwater inspections and sampling
99,000$ CANCELED
SN-59N-nitrosodimethylamine (NDMA) Precursor Control Strategies for
Direct Potable ReuseRoshan Aflaki DCTWRP
Assist LASAN in the study to: characterize sources of NDMA precursors, optimize NDMA and NDMA precursor removal during the Modified Ludzack-Ettinger (BNR-MLE) secondary treatment; evaluate NDMA and NDMA precursor removal across the full advanced treatment (FAT) and alternative direct potable reuse (DPR) treatment trains; and evaluate NDMA formation post-advanced treatment
140,000$ Black & Veatch 6/10/2016 Issued NTP 6/10/2016
SN-60LNG/CNG Safety Evaluation and
RecommendationsJonathan Zari SRSSD
Conduct a thorough evaluation of LASAN’s LNG and CNG fueling stations, fueling operations, and clean fuel vehicles, and to make the recommendations for safety improvement to LASAN Clean Fuel operation
112,161$ AECOM 7/1/2016 COMPLETED
Page 7 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-61
Specialized Support for the Generation of Data Required by
the Coordinated Integrated Monitoring Programs (CIMP)
Vivian Marquez WPD
Develop and implement a strategy for the generation of data at 25 monitoring sites to comply with CIMP requirements for Dominguez Channel, Santa Monica Bay, Ballona Creek, and LA River, and provide as-needed technical support
$ 1,900,000 Tetra Tech 5/18/2016 Issued NTP 9/9/16
SN-62Los Angeles Green Arts Program Support Services
George Payba SRCRD
LASAN is soliciting a qualified consultant firm to continue implementation of the LAGAP and certify green arts facilities properties using AEP’s standards. The scope includes but is not limited to prepare a LAGAP/ AEP certification package and evaluate applications and audit arts facilities for compliance to the standards
$ 150,000 Tetra Tech 7/11/2016 Issued NTP 7/11/2016
SN-63Los Angeles Green Lodging Program Support Services
George Payba SRCRD
LASAN is soliciting a qualified consulting firm to continue implementation of the Los Angeles Green Lodging Program and certify green lodging properties using Green Seal’s Environmental Standard for Properties (GS-33). The scopes of services include, but are not limited to prepare a LAGLP / Green Seal certification package and evaluate applications and audit lodging properties to the GS-33 Standard for Certification
$ 150,000 Tetra Tech 7/11/2016 Issued NTP 7/11/2016
SN-64Residential Food Scrap In-Sink Disposal Pilot Program
Rowena Romano SRSSD
The Residential Food Scrap In-Sink Disposal Pilot Program will promote education of residents to use their food waste disposers (FWD) (i.e., garbage disposers) to divert food scraps through the wastewater conveyance and treatment systems. A pilot area in Playa Vista (West LA) comprising approximately 500 single-family residents has been identified for this program. The scope of work is to include but not be limited to the following: Participant behavioral surveys; Food waste disposer needs assessment; Installation of food waste disposers (optional); Outreach and education; Black bin waste characterization; Closed-circuit television (CCTV) surveys of piloted sewer lines; Wastewater sampling and characterization; Food waste degradation and biogas production tests; Bench-scale laboratory testing; Conveyance system modeling; and Wastewater treatment modeling
$ 2,000,000 CB&I 6/9/2016 Issued NTP 5/31/2017
SN-65 Post Spill Clean-Up Pilot Study John Park WCSD
The purpose of this TOS is to establish a list of pre-qualified sewage cleaning contractor(s). Contractor(s) shall be responsible for the post Sanitary Sewer Overflow (SSO) clean up and disinfection from private or public property. The contractor(s) will remove any waste-related materials from the private or public property (with permission from the property owner) and performing disinfection services to enable the property to be free from hazardous materials by following the Institute of Inspection, Cleaning and Restoration Certification (IICRC) Standards. Also the Prime contractor will be responsible for submitting an SSO clean-up report after each incident and provide analytical reports of: (1) Cost benefit analysis based on current and historical data; and (2) Potential savings and long-term program benefits to the City.
$ 200,000 CANCELED
Page 8 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-66Evaluation and Structural Design
of CLARTS FacilitiesAntranik Saiyan SRPCD
Provide evaluation and structural design of CLARTS facilities (the Solid Waste Transfer Building (SWTB) and the Green Waste Transfer Building (GWTB)). The scope includes but is not limited to: Design of SWTB solar roof system, design and replacement; Design a connecting bridge between the transfer station administration office building A and dispatch supervisor’s office building B; Design a large conference and training room; Design a utility and storage room; and Prepare technical bid package. The bid package must include bid ready plans and specifications (including General Conditions and General Requirements) and an engineer’s construction cost estimate.
$ 147,343 CDM Smith 6/17/2016 Issued NTP 1/25/2017
SN-67Residential Commingled Food Scrap Collection Pilot Program
Rowena Romano SRSSD
The Residential Commingled Food Scrap Collection Pilot Program (RCFSCPP) will evaluate the diversion of food scrap and food-soiled paper from landfills through the use of the green-bin and composting and/or anaerobic digestion. The pilot will involve engaging households within the South Los Angeles and West Los Angeles wastesheds. The scope of work is to include but not limited to: public education/outreach, kitchen-pail deployment, behavioral surveys, black-bin (i.e., household refuse) and green-bin (i.e., commingled yard-trimmings and food scraps) set out rates, curbside inspections, waste characterizations, and tonnage data collection. The results of the program will be used to determine whether the program should be expanded or implemented City-wide.
$ 2,000,000 Tetra Tech 5/18/2017 Pending Board Approval
SN-68Lankershim Blvd. - San Fernando
Valley Green Street Network Evaluation
Wing Tam WPD
Evaluate distributed Stormwater Control Measures (SCMs) as feasible to improve water quality and augment water supply including dry wells, rain gardens, and/or infiltration gallweries along aforementioned Great Streets. Develop preliminary design concepts, engineering design package performance/monitoring requirements for SCMs in Lankershim Blvd. (Chandler to Victory) using integrated delivery. Conduct Site survey and geotechnical, utility, and other investigations as needed for design. Develop an open book cost model to design efforts. Develop a plant palette and landscaping and irrigation plans. Develop a monitoring plan to assess project performance. Procure all necessary plans and appurtenance documents to ensure that the appropriate date are generated at each of the monitoring sites. Construction Project Management.
$ 3,780,000 Carollo 2/24/2017 Pending Board Approval
SN-69Customer Service Support for
Implementation of 24/7 OperationsBryan Cowitz CCD
Provide up to twenty (20) As-Needed Communication Information Representatives (CIR) to work under the direction of LASAN TOS Manager for approx. 20 hours per week. (Note: Not all 20 CIRs will be working at the same time. A number of CIRs will be needed at a different time of period during the course of the TOS). These CIRs will perform the following duties: answer telephone calls, enter info. into a MyLA311 CRM to resolve customer complaints, schedule customer's requests, operate personal computer using various applications, perform general administrative work, etc.
$ 1,307,000 Tetra Tech 10/21/2016Pending Board Approval. ON HOLD
Page 9 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-70 Wilmington Urban Greening Plan Wing Tam WPD
Develop comprehensive urban green plan for a network of green alleys, streets and community connections that will serve as a template for future neighborhood retrofits throughout the City. Wilmington community has been selected for the City's comprehensive urban green plan due to its demographics and exposure to severe pollution. Provide technical services to improve the infrastructure, water quality, and open space amenities to benefit the residents of the Wilmington community.
$ 250,000 Parsons Brinckerhoff 2/1/2017 Issued NTP 11/20/2017
SN-71AStructural Condition Assessment
of North Outfall Sewer (NOS)Kwasi Berko WCSD
Assess the condition of the City's big pipes by CCTV inspection or in rare instances, by sonar/laser profiling of the sewer pipelines which are owned, operated, and maintained by the City. In some circumstances, the Contractor may be asked to perform cleaning of the sewer in order to allow the equipment to pass for the purposes of better assessing the pipe condition.
$ 1,343,000 Brown and Caldwell 2/24/2017 Issued NTP 5/22/17
SN-71BStructural Condition Assessment
of North Outfall Sewer (NOS)Kwasi Berko WCSD
Assess the condition of the City's big pipes by CCTV inspection or in rare instances, by sonar/laser profiling of the sewer pipelines which are owned, operated, and maintained by the City. In some circumstances, the Contractor may be asked to perform cleaning of the sewer in order to allow the equipment to pass for the purposes of better assessing the pipe condition.
$ 850,000 CDM Smith 2/24/2017 Issued NTP 5/22/17
SN-72Van Nuys Blvd. - San Fernando
Valley Green Street Network Evaluation
Wing Tam WPD
Evaluate distributed Stormwater Control Measures (SCMs) as feasible to improve water quality and augment water supply. Develop preliminary design concepts, engineering design package performance/monitoring requirements for SCMs in Van Nuys Blvd. (Laurel Canyon to San Fernando) using integrated delivery. Conduct Site survey and geotechnical, utility, and other investigations as needed for design. Develop an open book cost model to design efforts. Develop a plant palette and landscaping and irrigation plans. Develop a monitoring plan to assess project performance. Procure all necessary plans and appurtenance documents to ensure that the appropriate date are generated at each of the monitoring sites. Construction Project Management.
$ 3,360,000 Geosyntec 2/24/2017 Issued NTP 9/25/2017
SN-73Optimization of Eight Proposition
O ProjectsWing Tam WPD
Optimize eight completed Prop O projects:1) Glenoaks-Sunland Storwater Capture, 2) Rosecrans Rec. Center Stormwater Enhancements, 3) Elmer Ave. Phase II, 4) Elmer Paseo, 5) Temescal Canyon Park Stormwater BMP Phase I, 6) Avalon Green Alley South, 7) Harbor City Greenway, and 8) Broadway Neighborhood Stormwater Greenway. Examine: physical, chemical, and biological characteristics of the Prop O Projects and prepare operations management manuals that will establish proper protocols for long term sustainability and provide training to City staff to optimize performance of the projects
$ 2,416,000 Geosyntec 11/7/2017 Pending Board Approval
SN-74Extension of Multi-Agency
Collaborative (MAC) Pilot StudyWing Tam WPD
The services required are: 1) physical observations, water volume capture and usage, water quality monitoring, and social monitoring; 2) facilitate continued education and outreach
$ 70,000 Tetra Tech 12/7/2017 Forming Agreement
SN-75Stormwater Green Infrastructure
AcademyWing Tam WPD
Develop a certification program to educate local workers on design, construction, operation and maintenance (O&M) of green infrastructure facilities or Best Management Practices (BMPs)
120,000$ CH2M 3/3/2017 Issued NTP 5/10/2017
Page 10 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-77
DCTWRP Storage Tank Automation: Real Time Decision
Support System (RT-DSS) for Wet Weather Operation
Hyginus Mmeje WESD
Optimize the usage of wet weather storage at the DCTWRP. Determine and implement the control logic in a Real Time Decision Support System (RT-DSS) dashboard that will: 1) automatically determine when and how the DCTWRP storage should be filled and drained to prevent downstream spills during storm events based on real time depth/flow monitoring upstream and downstream of the plant; 2) maximize the level of service possible for the plant and downstream conveyance.
$ 145,000 Black & Veatch 4/21/2017 Issued NTP 5/30/2017
SN-78The Proposed Sewer Connection
Financial Assistance Program (Financial Only)
Alex Vazquez FMD
Need experience financial agencies to handle loan processing service at a competitive rate. Prepare outreach material and conduct outreach to secure a sample group of 50 participants after City approval. Prepare loan application package. Review customer's application, property tax status. Prepare and process losing document and reporting document requirements in compliance with but not limited to Truth-In-Lending Act and regulation Z guidelines for the life of the contract
150,000$ NO BID
SN-79
DCTWRP Advanced Water Purification Facility (AWPF)
Ground Water Replenishment (GWR) Technical Assessment
Development and Services
Joline Munoz DCTWRP
Engineering Services to develop the DCTWRP AWPF Engineering Report (ER), to address regulatory requirements, and technical and regulatory expert assistance to: (a) review and update engineering report selected sections as deemed required and (b) provide expert assistance for discussions with the California Regional Water Quality Control Board (RWQCB) and the Division of Drinking Water (DDW) of the State Water Resources Control Board. Engineering Services include project management, meetings and communications, development of ER sections, draft and final drafts of ER, final ER incorporating regulatory agency comments and Technical and regulatory expert services.
$ 375,000 Larry Walker Assoc. 5/17/2017 Issued NTP 8/31/2017
SN-80Force Main Leak and Gas Pocket Detection Inspection Pilot Study
Nabih Akar III WCSD
1) Inspect the condition of three (3) force mains by deploying the SmartBall inspection technology located on Bohlig Road (UCLA), 8th Street, and 85th Street. 2) Perform expert analyses and review on force main pipes by detecting the location of gas leaks and provide inspection results analysis and reporting. 3) Review and provide comments on the documents as prepared by LASAN with the full analytical data such as the size and location of the gas pocket or leakage locations with a detailed map showing its exact location.
$ 65,000 Black & Veatch 3/6/2017 Issue NTP 11/14/2017
SN-81San Fernando Relief Sewer
Concept Study (Doran to Division Street)
Kwasi Berko WESD
Prepare constructability Concept Report that includes the determination of the most optimal alignment with the least cost of construction, evaluation constructability methods and develop their detailed cost, and Risk Assessment and Cost-Benefit Analysis
$ 300,000 AECOM 6/2/2017 Issued NTP 12/11/2017
SN-83LA Industry Outreach Event
ServicesJennifer Kong IWMD
Support LA Industry Outreach Events to sustain and grow business in Los Angeles
$ 90,000 CH2M 6/22/2017 Issued NTP 6/27/2017
SN-84Specialized Services for CIMP Implementation and Watershed
CharacterizationJon Ball WPD
Provide specialized CIMP monitioring, laboratory services, and technical studies to characterize City Watersheds. Support data management and assessment. Purchase as-needed equipement and materials such as autosamplers, autosampler accessories, etc. on an urgent basis. Other specialized and technical services to support on-going needs for EWMP/CIMP to comply with water quality regulations.
$ 2,015,000 Larry Walker Assoc. 6/29/2017 Issued NTP 10/24/2017
Page 11 of 12
1/2/2018
No. TITLE PM DIV SCOPE TOS COST CEILING SELECTED FIRM SELECTED DATE COMMENTSAWARDED TOS
SN-85
Community Involvement and Project Mitigation Support for Clean Water (Wastewater)
Program
Chris DeMonbrunWESD/
PAO
Perform on an as-needed basis, and shall be on an individual lump sum basis. The six (6) tasks are as follows: 1) facilitate community meetings with Neighbors of Hyperion Water Reclamation Plant, 2) act as community liaison with neighbors of other City treatment plants and wastewater facilities, 3) provide community outreach for wastewater collection system projects, 4) provide speaking, communications, and media training for City staff, 5) provide other outreach support as needed, and 6) accomplish tasked based assignments.
$ 2,000,000 Tetra Tech 11/6/2017 Pending Board Approval
SN-87 Brownfield Program Assistance Nuna Tersibashian SRCRDProvide on-call technical consultation, Grant writing, and project delivery services for potential or actual grant-funded brownfield sites within the City
$ 75,000 Stantec
(formerly MWH)11/8/2017 Issued NTP 12/18/2017
SN-91Structural Condition Assessment
of North Outfall Sewer (NOS) Phase 2
Fernando GonzalezWESD/ WCSD
Phase 2 continues the assessment of the rest of the NOS to its beginning near Topanga Canyon in Woodland Hills and also include other critical large sewer pipes built before 1950 made of brick, metal, and unprotected concrete in the City’s Central Business District. Services are the same as TOS SN-71
$ 3,000,000 In Selection Process
SN-92Quality Assurance & Quality
Control of Gauging DataManik Mohandas WESD
Provide a third-party Quality Assurance Quality Control (QA/QC) audit of gauging data received from approximately 200 gauging sites throughout the Wastewater Collection System
$ 149,250 Proposal due 1/17/2018
SN-93
Concept Report Revisions for Three Downtown and Two
Highland Park Low Flow Diversion Projects
Alfredo Magallanes WPD
Provide technical services to update 5 completed concept reports from 2013 as well as prepare instructions to the BOE for the development of a pre-design reports, design plans, construction, and post-construction processes for 3 Downtown and 2 Highland Park Low Flow Diversion projects
$ 149,600 Tetra Tech 11/17/2017 Issued NTP 12/11/2017
SN-94Hollenbeck Park Lake
Rehabilitation and Stormwater Management Project Services
Wing Tam WPD
Perform required pre-design/design services associated with this project with the goal of preparing documentation needed for the implementation of this project
$ 1,000,000 In Selection Process
SN-96Stormwater Use Standards for
Penmar, Temescal and Mar Vista Proposition O Projects
Wing Tam WPD
Develop alternate concepts to meet LA County Public Health requirements with regard to capturing. Treating, and using off-site dry- and wet-weather runoff for irrigation beneficial uses
$ 50,000 Proposal due 1/18/2018
Page 12 of 12
1/2/2018
No. TITLE PM Div SCOPE EST. COST Issued toPRD/PRC Approval
DATECOMMENTS
SN-24Membrane Bioreactors (MBR) Pilot
Study at Hyperion Water Reclamation Plant (HWRP)
Hi Sang Kim HTP
Install, test, and publish the final report on two (2) trains of MBR pilot test units to nitrify and denitrify Hyperion's primary effluent. One train will use conventional air activated sludge process, and the other will utilize HPOAS process.
10,000,000$ ALL FIRMS TBD
•Duration: 36 months•Obtaining funding & Executive approval•SOW is under modificationSTATUS UNKNOWN
SN-76Rainwater Management for the
Stormwater and Wastewater Programs via Ecological Project Planning
Alfredo Magallanes WPD
Develop a programmatic rainwater management approach leveraging the collective goals of LASAN's Stormwater and Wastewater Programs to develop ecological projects resulting in wastwater collection system relief and increasing LASAN's inventory of recycled water production
$ 600,000 ALL FIRMS TBD•Duration: One year•Obtaining funding & Executive approvalON HOLD PER EXECUTIVE
SN-82East West Valley Interceptor Sewer
(EWVIS) Environmental Impact Report (EIR)
Fernando Gonzalez
WESD
An environmental impact report (EIR) is needed as a continuation of the recently completed concept report and feasibility study for the EWVIS project. The report will develop and finalize an technical report or memoranda to document six technical studies for the project: Traffic/Transportation, Cultural Resources, Paleontological Resources, Noise, Air Quality, and Hazardous Waste.
$ 320,000 ALL FIRMS TBD•Duration: 14 months•Obtaining funding & Executive approvalsON HOLD
SN-86Sewer System Management Plan
(SSMP) Five-Year UpdateFernando Gonzalez
WESDProvide a comprehensive and independent review and report on the City’s SSMP
$ 285,000 ALL FIRMS TBD•Duration: 24 months•Obtaining funding & Executive approvals
SN-88Regulatory Support for MS4 Stormwater
Permit and Ballona Creek EWMPHubertus Cox WPD
Assist LASAN with the development of Ballona Creek FY 2016-17 Annual Report for the MS4 Permit; Evaluate the feasibility of Site Specific Objectives for zinc in Ballona Creek and Ballona Estuary; Develop a strategy for compliance with MS4 Permit and adaptive management of Ballona Creek TMDLs; and Conduct additional environmental analyses for the EIR of the Ballona Creek Bacteria TMDL Project if warranted by project scope changes.
$ 149,000 ALL FIRMS TBD•Duration: 12 months•Obtaining funding & Executive approvalsCANCELED
SN-89Sewer Advanced Planning & GIS
Enterprise SupportFernando Gonzalez
WESD
The services will include but are not limited to: pipe condition assessment, evaluating and recommending pipe renewal actions, preparing sewer master plans and packaging projects for design and construction. In addition, consulting services will be utilized for the development of GIS Enterprise System .
$ 4,000,000 ALL FIRMS TBD•Duration: 2 years plus 2-year extensions•Obtaining funding & Executive approvals
SN-90Wastewater Program Operational & Maintenance Support during Control Systems Start-up & Commissioning
Sam Alavi WESD
Forming a team of electricians and instrument technicians to support LAWINS. The proposed team will support: control systems commissioning group of LAWINS who are working closely with the City's Operation and Maintenance groups at four water reclamation plants (Hyperion, Terminal Island, DCT, and LAG) and collection system; professionals who posses expertise in the field of wastewater treatment and conveyance, delivering a large scale DCS and SCADA project(s) for the City's wastewater program; and will work with at any or all five segments of LAWINS. They will be managed by the City staff and an assigned LASAN Program Management Team (PMT) who are tasked with managing and overseeing LAWINS.
$ 4,950,000 ALL FIRMS TBD•Duration: 2 years plus 2-year extensions•Obtaining funding & Executive approvals
SN-95
Specialized and Expert Services for Total Maximum Daily Load (TMDL) and
Regulatory Support Concerning Wastewater
Vivian Marquez WPD
Specialized expert services to support compliance with NPDES receiving water regulations and issues concerning wastewater, including but not limited to providing guidance, technical support and special/pilot studies on TMDL related regulations and Water Reclamation Plant compliance impacts.
$ 2,000,000 ALL FIRMS TBD•Duration: 3 years plus 1-year extension•Obtaining funding & Executive approvals
TBDPilot Testing for Alternatives of Ceramic
Membranes at Terminal Island Water Reclamation Plant (TIWRP)
Seung Tag Oh TIWRP Scope of Work is under development TBD ALL FIRMS TBD•Duration: TBD•Obtaining funding & Executive approvalsSTATUS UNKNOWN
UPCOMING POTENTIAL TOS