La Paloma IN - Urbaser · LA PALOMA MSW TREATMENT PLANT Client Madrid City Government Residents...
1
LA PALOMA MSW TREATMENT PLANT Client Madrid City Government Residents served 540,000 residents Processes • Treated waste (total): 245,567 t • Recovered materials (total): 28,795 t • Pre-treatment of remaining waste: 12,789 t • Packaging treatment: 16,006 t • Composting: 566 t of compost produced 2016 data Treatment capacity • 219,000 t/year remaining waste • 36,500 t/year local entities 70.6 kt CO 2 prevented
Transcript of La Paloma IN - Urbaser · LA PALOMA MSW TREATMENT PLANT Client Madrid City Government Residents...
![Page 1: La Paloma IN - Urbaser · LA PALOMA MSW TREATMENT PLANT Client Madrid City Government Residents served 540,000 residents Processes • Treated waste (total): 245,567 t • Recovered](https://reader035.fdocuments.us/reader035/viewer/2022070712/5ecbd038b0202469f177b9bb/html5/thumbnails/1.jpg)
LA PALOMA MSW TREATMENT PLANT
ClientMadrid City Government
Residents served540,000 residents
Processes• Treated waste (total): 245,567 t• Recovered materials (total): 28,795 t
• Pre-treatment of remaining waste: 12,789 t
• Packaging treatment: 16,006 t• Composting: 566 t of compost produced
2016 data
Treatment capacity• 219,000 t/year remaining waste• 36,500 t/year local entities
70.6 kt CO2 prevented