![Page 1: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/1.jpg)
LA Commons Upgrade of Website
ARB
Team 01
![Page 2: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/2.jpg)
Name Role
Hualong Zu Project Manager
Qihua Wu Life Cycle Planner
Taizhi Li Requirements Engineer
Huaiqi Wang Prototyper
Tianyi Luo Feasibility Analyst
Yueheng Li System Architect
Steiniger, Herman, L IIV & V
Team Member
![Page 3: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/3.jpg)
3
Remote Team Member
Herman Steiniger
![Page 4: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/4.jpg)
4
Team Strength and Weakness
Operational View• Strength – Client is engaged in project and being
informed design ideas• Weakness – Uncontrolled changes in scope causing
rework in artifacts
Technical View• Strength – Became knowledgeable in using
Wordpress and its plugins• Weakness – System design lacks in covering outlier
cases
![Page 5: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/5.jpg)
5
Overall Project Evaluation
• System design meets current Win Conditions• Majority of system has been prototyped
• Some instability with constant the changes in win conditions
• Need to start looking into how to train client in maintaining site
![Page 6: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/6.jpg)
6
Acceptance Test Plan and CasesTest Case Priority Iteration
TC-01 Community ArtsTC-01-01 Navigate to community arts page M 1TC-01-02 Select a project from community arts page M 1TC-01-03 Navigate to project from neighborhood page M 1TC-01-04 Browse project page images M 1
TC-02 Gallery of Art WorksTC-02-01 Navigate to art gallery M 1TC-02-02 Browse art gallery M 1
TC-03 Interactive MapTC-03-01 Navigate to interactive map page C 2TC-03-02 Display available neighborhoods C 2TC-03-03 Navigate from interactive map page C 2
TC-04 Social Media SharingTC-04-01 Share a neighborhood event M 2TC-04-02 Share a project page M 2
TC-05 AdministrationTC-05-01 Create new project page M 2TC-05-02 Update images in project page M 2TC-05-03 Update images in gallery page M 2TC-05-04 Update neighborhood in interactive map C 2
![Page 7: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/7.jpg)
7
Operational Concept Description
Huaiqi Wang
![Page 8: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/8.jpg)
8
System objectives
• Create culture connections among neighbors in Los Angeles through the sharing of stories and creating temporary works of public arts
![Page 9: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/9.jpg)
9
![Page 10: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/10.jpg)
10
![Page 11: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/11.jpg)
11
Constraints
• Staff working at LA Commons have limited knowledge about computer technology.
• The website is written using WordPress.
![Page 12: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/12.jpg)
12
Current processes
![Page 13: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/13.jpg)
13
System capabilities• Interactive Map: The map is used to integrate all neighborhoods in a map
and is able to provide the users with a better navigation to browse all neighborhoods’ information on the website.
• Community Arts Project Page: The page is aimed to provide information about past Community Arts’ projects. In addition, in the Community Arts Page, add additional links to direct this page to the related Community Arts’ project pages to make them connected.
• Neighborhood Page Upgrade: Add a small gallery of community arts ’ arts work on the bottom-right page. Images from this small gallery direct users to the related neighborhood’s project page.
• Social Network Share Function: Visitors can share upcoming events, art works and information of posted projects on their social network page.
• Gallery of Art Works: Add a gallery tab on the main page’s navigation bar. Visitors can see the most wonderful photos selected from all Community Arts’ projects on this gallery page.
![Page 14: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/14.jpg)
14
Level of services
• Scalability: System shall be able to expand as new documentations of future art programs will be added to the website. (About 10 art programs per year, 15-20 pictures per art program)
• Downtime: Consistent and no more than four hours per month.
![Page 15: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/15.jpg)
15
Prototype
Hualong Zu
![Page 16: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/16.jpg)
16
Requirement Priority• WC_2697:Neighborhood Page• WC_2700: Interactive Map• WC_2699: Layout of Website• WC_2561: Community Arts Project Page • WC_2557: Gallery of Art Works• WC_2817: Community Arts Project Page • Connectivity • WC_2563: Social network sharing
![Page 17: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/17.jpg)
17
Risk Resolving • User Interface Mismatch/ Requirement Mismatch • Requirement Changes
![Page 18: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/18.jpg)
18
Neighborhood Page
![Page 19: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/19.jpg)
19
Interactive Map
![Page 20: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/20.jpg)
20
Community Arts Project Page
![Page 21: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/21.jpg)
21
Gallery of Art Works
![Page 22: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/22.jpg)
22
Community Arts Page Upgrade
![Page 23: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/23.jpg)
23
Better layout of website
![Page 24: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/24.jpg)
24
System Architecture
Yueheng Li
![Page 25: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/25.jpg)
25
System Context Diagram
![Page 26: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/26.jpg)
26
Artifacts & Information
![Page 27: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/27.jpg)
27
Behavior
![Page 28: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/28.jpg)
28
Deployment Diagram
![Page 29: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/29.jpg)
29
Life Cycle Plan
Qihua Wu
![Page 30: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/30.jpg)
30
Overview
• Modification on estimations• Implementation After last ARB• Plans for 577b Construction, Transition, &
Support (CTS)– Foundation Phase Rebaselining– Core Capability Iteration– Full Capability Iteration– Transition Iteration
![Page 31: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/31.jpg)
31
Modification on estimations
There are little modification on estimations:• Code base estimation was largely correct• Modules remain unchanged even though
implementation details were changed after several more Winwin negotiation sessions and client meetings.
• Team members for 577B
![Page 32: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/32.jpg)
32
32
Implementation After last ARB
![Page 33: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/33.jpg)
33
33
Construction Interations Plan
![Page 34: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/34.jpg)
34
Key Documents for Construction• As-built Operational Concept Description (OCD)• As-built System and Software Requirements Definition (SSRD) • As-built System and Software Architecture Description (SSAD)• As-built Rose Model Files (MDL) • As-built Feasibility Rationale Description (FRD)• Updated Risk Management Plans
![Page 35: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/35.jpg)
35
35
Detailed Transition Iteration Plan
![Page 36: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/36.jpg)
36
• Transition Plan (including some Training planning) • User Manual• Transition readiness assessment
Key Documents for Transition
![Page 37: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/37.jpg)
37
Key Documents for Support• Support Plan• Training materials (including tutorials and sample data)
![Page 38: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/38.jpg)
38
Feasibility Evidence
Tianyi Luo
![Page 39: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/39.jpg)
39
Assessment Approach• Research and select our NDI options
• Website solution• Hosting solution• Gallery solution• Interactive map solution• Social media sharing solution
• Setup Evaluation Criteria according to Win_Conditions• NDI/NCS Attributes• NDI/NCS Features
• Use Evaluation Results Screen Matrix to do evaluation by 4 members in our team
• Give Evaluation Summary for our evaluation on NDI• Which NDI we should pick to do implementation
![Page 40: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/40.jpg)
40
NDI/NCS Alternatives
![Page 41: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/41.jpg)
41
Evaluation Criteria
NDI /NCS Attributes NDI /NCS Features
![Page 42: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/42.jpg)
42
Evaluation Results Screen Matrix for NDI Attributes (Example)
![Page 43: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/43.jpg)
43
NDI/NCS evaluation & analysis results
• After calculation and our analysis on positive and negative side of each NDI, we decide to use• BlueHost• WordPress• WOW Slider• NextGen Gallery• Leaflet Maps Marker• Add This
![Page 44: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/44.jpg)
44
Business Case• Cost Analysis
• Personnel effort• During CSCI 577a – 68H• During CSCI 577b – 111H• During operational phase (maintenance) – 78H / year
• Hardware and software cost• Bluehost – $120 / year• Domain – $16.4 / year
• Benefit Analysis (Time saved)• Search time of documents – 120 hrs / year• Maintenance time for uploading documents: 24 hrs / year• Marketing Time – 80 hrs / year
• Return on Investment Analysis• LA Commons staff salary is $15/hr from mid 2013.• Assume 10% increase in salary in middle of each following year.• ROI = (Cumulative Benefit – Cumulative Cost) / Cumulative Cost• Result is shown in next page.
![Page 45: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/45.jpg)
45
ROI Analysis Result
![Page 46: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/46.jpg)
46
Conclusion
C1: As the evaluation and analysis of the NDI item. WordPress is selected as the main solution for the whole website. It is what the client currently uses, and therefore should be inherited. But the built-in functions for wordpress are limited.R1: We can use WordPress plugins, such as “WOW Slider”, “NextGen Gallery”, “Leaflet Maps Marker” and “Add This” to solve the limitation. C2: “WOW Slider” is currently our best solution for gallery to be shown in Community Arts Programming page. And “Leaflet Maps Marker” is the best solution for the interactive map. However we are still not sure whether to go with the free version or upgrade to the pro version of these two NCS.R1: Keep Prototype with the gallery functions. Look deeper about what is added in the pro version. Talk to the client to see if they are willing to pay the subscription fee these two pro versions may need.
![Page 47: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/47.jpg)
47
Transition Plan
Taizhi Li
![Page 48: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/48.jpg)
48
HW/SW/Site Preparation
• Hardware Preparation Client’s existing laptop is sufficient, and it can be a Apple Macintosh machine or a Windows machine.
• Software Preparation• WordPress installed on laptop devices• WordPress plugins installation WOW Slider and NextGen Gallery installation on the WordPress MapPress Easy Google Maps and Leaflet Maps Marker installation on the WordPress• Add this and Share this installation on the WordPress
• Site Preparation• Computer rooms for training• Computers with WordPress which contains required plugins• Backup computer for testing the website
![Page 49: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/49.jpg)
49
Support Environment
• No extra requirement for the website,• Just mentioned in preparation• Operating system can be Macintosh/Windows
![Page 50: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/50.jpg)
50
Release Strategy
• Perform unit test in a testing environment that hosts a version of the upgraded LA Commons website.
• Set up the development environment on client environment to enable the scope for further development
• Install required plugins on WordPress• Perform the testing on the client environment
containing the final upgraded website• Test the website on different browsers• Provide the training to the client
![Page 51: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/51.jpg)
51
Quality Focal Point
Herman Steiniger
![Page 52: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/52.jpg)
52
Traceability MatrixOCDCapability Goals
WinbookWin Conditions
SSADUse Cases
TCPTest Cases
OC-1 WC_2700 UC02 TC-03-01, TC-03-02, TC-03-03
OC-2 WC_2817 UC04, UC07 TC-01-02, TC-01-03
WC_2697 UC06 n/a
WC_2561 UC04 TC-01-02, TC-01-03
WC_2558 UC08, UC10, UC11 TC-05-01, TC-05-02, TC-05-03, TC-05-04
WC_2562 UC08 TC-05-01
OC-3 WC_2557 UC01, UC06 TC-01-04, TC-02-01, TC-02-02
WC_2699 UC05 n/a
WC_2817 UC04, UC07 TC-01-02, TC-01-03
WC_2558 UC08, UC10, UC11 TC-04-02 TC-04-03
OC-4 WC_2563 UC03 TC-04-01
WC_2556 UC09 TC-04-02
OC-5 WC_2557 UC01, UC06 TC-01-04, TC-02-01, TC-02-02
WC_2558 UC08, UC10, UC11 TC-04-02 TC-04-03
![Page 53: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/53.jpg)
53
Defects Metrics
SSAD
FED
LCP
Non-component activity
OCD
Project Website
PRO
CE/通用格式 CE/通用格式 CE/通用格式
FoundationsValuationExploration
Defects per Phase
Component Breakdown
![Page 54: LA Commons Upgrade of Website ARB Team 01. Name Role Hualong Zu Project Manager Qihua WuLife Cycle Planner Taizhi LiRequirements Engineer Huaiqi WangPrototyper.](https://reader030.fdocuments.us/reader030/viewer/2022032705/56649dab5503460f94a99391/html5/thumbnails/54.jpg)
54
Technical Debt
Solved•Prototyped majority of win conditions