L1198: WB:AHU-4 NORTHWEST NODENORTH-WEST NODEWEST … · 2018. 12. 11. · l1198: wb:ahu-4...
Transcript of L1198: WB:AHU-4 NORTHWEST NODENORTH-WEST NODEWEST … · 2018. 12. 11. · l1198: wb:ahu-4...
-
abrahmacText BoxL1198: WB:AHU-4 NORTHWEST NODE
abrahmacCalloutNORTH-WEST NODE
abrahmacCalloutWEST NODE
abrahmacPolygon
abrahmacCalloutAFFECTED AREA
FORCED AIR SUPPLY-RETURN: ACTIVECOOLING: ACTIVE
HEATING: DOES NOT WORK
abrahmacPolygon
abrahmacCalloutNORTH-WEST NODE MECH ROOM
AIR HANDLING UNIT: WB AHU 4
abrahmacPolygon
abrahmacCalloutWEST NODE MECH ROOM
SOURCE FOR HOT AND CHILLED WATER
abrahmacPolyLine
abrahmacPolyLine
abrahmacPolyLine
abrahmacEllipse
abrahmacPolyLine
abrahmacLine
abrahmacLine
abrahmacLine
abrahmacLine
abrahmacCalloutCENTRAL GARAGE NODE
abrahmacText BoxPROJECT SCOPE:
REPLACE THE EXISTING AIR HANDLING UNIT HYDRONIC HEATING COIL AT THE NORTHWEST NODE OF THE ELEVATED WALKWAYS, BETWEEN THE CENTRAL GARAGE, TERMINAL A AND TERMINAL B, WITH AN ELECTRIC HEATING COIL IN THE AIR HANDLING UNIT. THE NEW ELECTRIC HEATING COIL WILL BE SERVED BY AN ELECTRIC CIRCUIT FROM THE CENTRAL GARAGE MAIN DISTRIBUTION BOARD, LOCATED INTO THE ELECTRIC ROOM 2-202. A NEW ELECTRIC CONDUIT WILL BE INSTALLED ABOVE THE CEILING OF THE ELEVATED WALKWAY TO BRING THE NECESSARY POWER FROM THE MAIN DISTRIBUTION BOARD TO THE NEW HEATING COIL. THE EXISTING CEILING PANELS AND THE STAINLESS STEEL WALL PANELS WILL BE TEMPORARELY REMOVED, TO ALLOW THE INSTALLATION OF THE ELECTRICAL COUNDUIT, AND BE REINSTALLED IN PLACE.
abrahmacCalloutELECTRIC ROOM 2-202
-
abrahmacText BoxL1198: WB:AHU-4 NORTHWEST NODE
abrahmacCalloutNORTH-WEST NODE
abrahmacCalloutWEST NODE
abrahmacPolygon
abrahmacCalloutAFFECTED AREA
FORCED AIR SUPPLY-RETURN: ACTIVECOOLING: ACTIVE
HEATING: DOES NOT WORK
abrahmacPolygon
abrahmacCalloutNORTH-WEST NODE MECH ROOM
AIR HANDLING UNIT: WB AHU 4
abrahmacPolygon
abrahmacCalloutWEST NODE MECH ROOM
SOURCE FOR HOT AND CHILLED WATER
abrahmacPolyLine
abrahmacPolyLine
abrahmacLine
abrahmacLine
abrahmacLine
abrahmacLine
abrahmacPolyLine
abrahmacCalloutCENTRAL GARAGE NODE
abrahmacText BoxPROJECT SCOPE:
REPLACE THE EXISTING AIR HANDLING UNIT HYDRONIC HEATING COIL AT THE NORTHWEST NODE OF THE ELEVATED WALKWAYS, BETWEEN THE CENTRAL GARAGE, TERMINAL A AND TERMINAL B, WITH AN ELECTRIC HEATING COIL IN THE AIR HANDLING UNIT. THE NEW ELECTRIC HEATING COIL WILL BE SERVED BY AN ELECTRIC CIRCUIT FROM THE CENTRAL GARAGE MAIN DISTRIBUTION BOARD, LOCATED INTO THE ELECTRIC ROOM 2-202. A NEW ELECTRIC CONDUIT WILL BE INSTALLED ABOVE THE CEILING OF THE ELEVATED WALKWAY TO BRING THE NECESSARY POWER FROM THE MAIN DISTRIBUTION BOARD TO THE NEW HEATING COIL. THE EXISTING CEILING PANELS AND THE STAINLESS STEEL WALL PANELS WILL BE TEMPORARELY REMOVED, TO ALLOW THE INSTALLATION OF THE ELECTRICAL COUNDUIT, AND BE REINSTALLED IN PLACE.
abrahmacCalloutELECTRIC ROOM 2-202
-
CONSULTANT BRIEFING L1570_Group I Hangar . Logan International Airport . May 30, 2018
10
FORMAL REQUEST FOR INFORMATION
Questions may be sent via email to [email protected] subject
to the deadline for receipt. In the subject lines of your email, please reference
the MPA Project Name and Number.
Questions and their responses will be posted on Capital Bid Opportunities
webpage of Massport http://www.massport.com/massport/business/bids-
opportunities/capital-bids as an attachment to the original Legal Notice and
on COMMBUYS (www.commbuys.com) in the listings for this project.
abrahmacText BoxL1198 PRE BID CONFERENCE
abrahmacText Box
-
CONSULTANT BRIEFING L1570_Group I Hangar . Logan International Airport . May 30, 2018
11
KEY DATES
• Written Questions Due: Friday, June 1, 2018 at 12:00 noon
• MPA Responds: Friday, June 8, 2018
• Submission Deadline: Thursday, June 28, 2018 at 12:00 noon
abrahmacText BoxL1198 PRE BID CONFERENCE
abrahmacText Box
FILED SUB BID QUESTIONS DUE: COB 12/18/2018FILED SUB BID OPENING: 1/9/2019 AT 11 AM
GC QUESTIONS DUE: COB 1/15/2019BID OPENING: 1/23/2019 AT 11 AM
abrahmacText Box