L Chummun Bhujohory
Republic of Mauritius
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Major Structural Failures on
NEW ROADS in Mauritius
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Location
Small Island East of Madagascar 1800 square km, 1.2 million inhabitants
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
New Motorways
•Heavy Traffic Jam towards Capital City Centre Port Louis
•Two new motorways/road • Terre Rouge- Verdun •Port-Louis Ring Road
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
The Terre Rouge/Verdun Road
• Construction started in 2011
• 15.7 km motorway
• Created through a pharaonic site
• Allows drivers to bypass the capital city of Port Louis and its
traffic when they want to join North or South.
• Facilitates access to several towns and villages.
• Cost Rs 4 milliard (134 million USD)
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS
Public Symposium
Inaugurated in Dec 2013
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
13 months later: 18 January 2015: Cracks found during police patrol
• 25m length cracks
• A few centimeters wide
• Cracks covered the five lanes of motorway
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Motorway closed immediately for investigation
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
A few days later:
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Risks of landslides
• Cracks continue to grow and the extent of damage was on a
continuous increase
• Indication of Serious risks of landslides/accidents
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Motorway closed for an unknown duration
• (Source: Weekend 25 Jan 2015)
• Given extent of damage motorway closed for an unknown duration to allow time for investigation and repairs
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Government decision
• (Source: Le Défi Plus: 24-30 Jan 2015)
• Technical Audit
• Financial Audit
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Source: Le Defi Plus 24-30 Jan 2015 Some of the requirements of the audit
• Feasibility study prior to design
• Tests
• Cost
• Variations
• Quality v/s cost aspects
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Revelations
• Technical Audit (source Le Defi Plus 31 Jan-06 Feb 2015)
The Contractor COLAS already reported the problem about cracks to the
main Consultant EGIS INTERNATIONAL during construction, early February
2013. The cracks were visible to everybody!
Local Contractor had informed Consultant about the need for rehabilitation
works in a correspondence dated 27 Feb 2013.
Consultant informed Contractor to abandon rehabilitation works
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Revelations …cont
• Technical Audit (quoted)
The Contractor ‘acknowledges rejection of drawing for construction of trench
drain at the bottom of embarkment.’
‘Contractor considers that this trench drain was essential for the prevention
of cracks in road surface in future and unable to understand the reason for
this rejection’
The Road Development Authority (parastatal organization and Client to
project) had been very passive.
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Newspaper:Le Defi 30 Jan – 06 Feb 2015
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Road Development Authority (RDA)
• Source: Week End 01 Feb 2015
• Time bomb
• RDA suspected to have plotted together with Consultant to conceal defects found ten months prior to handing over of site
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Non Conforming ‘Standard Penetration’
• L’Agences Japonaise de Coopération Internationale performed soil tests.
• Standard test performed to determine soil resistance
• Scale of 0-50 N
• International Requirements: 30 N minimum
• Experts measured 5N
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Revelations
• Technical Audit
Japanese experts has advised to construct the road on piles but
this was not done.
Serious Drainage problems exist
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Investigation in progress
Technical audit wrt quality of materials
Samples are being taken from the site and tested. The test results
will be evaluated to see conformance to specifications. One of the
possible causes of failure could also be quality of materials.
Coring up to depths of 30m in process by geotechnical specialists:
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS
Public Symposium
Comments from freelance experts (Source Week End 08 Feb 2015)
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Comments from freelance media (Source Week End 08 Feb 2015)
• Another true reality of Mauritius
• Politics dictates technicians
• Posts which Mauritians can do well are given to foreigners
• Demotivation of engineers
• Engineers afraid of political pressure
• Scope of project limited by non technical persons and often impact on PROVISION OF DRAINS
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS
Public Symposium
15 Feb 2015: Motorway closed for three months
• Source: Week End 15 Feb 2015
• Form initial undetermined period of closure, three months reckoned
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
22 Feb 2015: Motorway closed for 2015
• Source: Week End 22 Feb 2015
• The Motorway will not be opened before 2016
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
The RING ROAD
Aimed at easing traffic to bypass city of Port Louis
Rs 1.2 milliard (40 million USD)
First part Inaugurated in
Feb 2013.
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
The RING ROAD
Collapse of retaining walls of Ring Road prior to delivery
Never used
Closed already
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Pictures of damages visible
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
The Port-Louis Ring Road
Skeleton in the closets of RDA Previous projects investigation reopened due to change in Government (Dec 2014)
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
L’Express 22 Jan 2015
• L’effondrement de la Ring Road
• À peine construite, la Ring Road a défrayé la chronique, en février dernier, à cause d’importantes fissures notées sur une partie de la route dans la région de Pailles. Cette route circulaire avait fait l’objet d’une Private Notice Question du leader de l’opposition en avril dernier. Plusieurs facteurs avaient été mis en cause de ce phénomène. L’ex-ministre, Anil Kumar Baichoo, avait évoqué la qualité des matériaux utilisés pour les travaux de remblayage et des infiltrations d’eau.
•
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Financial Audit
Source: Le Defi Plus 21-27 Feb 2015 Source: L’Express 21 Feb 2015
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Financial Audit
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
• In general Projects value start low
• Variation works increase value of project to unacceptable amounts
• Amount of Variation Works approved is now under investigations-
Cases of project value have doubled
Meanwhile: Impacts: Serious traffic jam
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS Public Symposium
Meanwhile: Consumer Associations: request for enquiry
• Source: Week End 01 Feb 2015
• L’Associations des consomateurs de
l’ile Maurice (ACIM) held a press
conference
• Asking for Commission d’Enquête
and Fact Finding Committee
• Tax payers money
L Chummun Bhujohory 26 Feb 2015 TANZANIA BAM/PTB/TBS
Public Symposium
Testing labs Responsibility: Quality of materials used
• Test as per procedures/specification prescribed in project
• Proficiency Testing and Accreditation safeguard our capability
• PT used as a legal tool in such investigations
• THANK YOU PTB/BAM for promoting such exercises!