Kwa Choga Dam Excavation Kenya

7
Student Movement for Real Change Kwa Choga Dam Excavation - Kenya

Transcript of Kwa Choga Dam Excavation Kenya

Page 1: Kwa Choga Dam Excavation   Kenya

Student Movement for Real Change

Kwa Choga Dam Excavation - Kenya

Page 2: Kwa Choga Dam Excavation   Kenya

Women carrying water near the Kwa Choga Water Dam can be seen in the distance before construction.

Page 3: Kwa Choga Dam Excavation   Kenya

Over 200 people use axes and hoes to excavate the dam.

Page 4: Kwa Choga Dam Excavation   Kenya

Ted Couch, the Deputy Project Director who initiated the dam project, joins the community in their efforts to construct a dam by carrying rocks on his back along the embankment.

Page 5: Kwa Choga Dam Excavation   Kenya

The Kwa Choga Water Dam fills with water after one rain.

Page 6: Kwa Choga Dam Excavation   Kenya

Kwa Choga Dam Excavation

Page 7: Kwa Choga Dam Excavation   Kenya