Process Hazard Analysis: Study Enhancement
Keith V. Farrell, MS ChE
PSM Coordinator
INVISTA, Orange Plant
10/27/2009 1
![Page 2: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/2.jpg)
Keith V. Farrell10/27/2009 2
![Page 3: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/3.jpg)
Beginning Thoughts
The Three Laws of TechnologyThe Three Laws of Technology
By Arthur C. Clark
• When an engineer states that something is possible, he is almost certainly RIGHT. When he states that something is impossible, he is very probably WRONG.
• Any sufficiently advanced technology is indistinguishable from magic.
Keith V. Farrell10/27/2009 3
![Page 4: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/4.jpg)
Study Objectives
• Federal Requirements
• Companies Requirements
• Tools
• Training
• “Bringing all Together”
• Cost and Savings
Keith V. Farrell10/27/2009 4
![Page 5: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/5.jpg)
Federal Requirements
• OSHA CFR Title 29 §1910.119
– Process Safety Management of Highly Hazardous Chemicals
• EPA CFR Title 40 Part 68
– Chemical Accident Prevention Provisions
Keith V. Farrell10/27/2009 5
![Page 6: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/6.jpg)
Company Requirements
• Accuracy and Precision
• Compliance
• Speed
Keith V. Farrell10/27/2009 6
![Page 7: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/7.jpg)
Accuracy and Precision
• Right Recommendations
• Vague Recommendations
• Constrictive Recommendations
• Wrong Recommendations
Keith V. Farrell10/27/2009 7
![Page 8: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/8.jpg)
Speed
• TIME IS MONEY!!!!
• Too Quick of a Pace for the Study
– Team Fails by Being Rushed
– Missed Consequences
• Too Slow of a Pace for the Study
– Team Fails by Tiring of Thinking
– Missed Consequences
– Unnecessary Consequences (Whines)
Keith V. Farrell10/27/2009 8
![Page 9: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/9.jpg)
Tools
• Willing People
• Deep Knowledge
• Accessible Information
• Archiving and Accessing Captured Information for Study
• Equipment
• EIS
Keith V. Farrell10/27/2009 9
![Page 10: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/10.jpg)
Tools
• People, Knowledge, Information, Computer Programs, Archiving Information, Access to Information
• Typical for All PHAs
Keith V. Farrell10/27/2009 10
![Page 11: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/11.jpg)
Tools: Equipment
• Displaying Information
– Eye strain
– Comfort
• Markups of P&IDs
– To Keep the Team on Same “Page”
– Verbal Directions of Nodes
– Not Quick
• Derailing the Thought Train
Keith V. Farrell10/27/2009 11
![Page 12: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/12.jpg)
Tools: Equipment, cont.
•Monitors for each Team Member & Space remaining for P&IDs
– Same Page Issue
– Quick Editing
– Comfortable
10/27/2009Keith V. Farrell
12
![Page 13: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/13.jpg)
Tools: Equipment, cont.
•Document Camera to Project Drawings
– Use Basic Marked Drawings
– Lower Eye Strain
– Faster Information Recognition
– Visual Data preferred
10/27/2009Keith V. Farrell
13
![Page 14: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/14.jpg)
EIS
Electronic Information Systems (EIS)
• What
• Where
• When
• How
Keith V. Farrell10/27/2009 14
![Page 15: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/15.jpg)
EIS: Defined.
• Databases
• Information Availability
• Benefits
Keith V. Farrell10/27/2009 15
![Page 16: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/16.jpg)
EIS: Databases
• PSI necessary for PHA
– PSI
– Alarms/ SIS
– SOLs
– PSV
– Process Control Points
– Process Information Points
– Procedures
Keith V. Farrell10/27/2009 16
![Page 17: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/17.jpg)
EIS
• Proper Form of Database
– Accessibility
– User Friendly
– Updateable
– Protectable
Keith V. Farrell10/27/2009 17
![Page 18: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/18.jpg)
WHAT FORM OF DATABASE?
• Software Needs Questions
– Stable
– Quick
– Ease of Use
– Expandable
– Software Life-span
Keith V. Farrell10/27/2009 18
![Page 19: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/19.jpg)
Accessibility and User Friendly
• Questions to ask
– Who needs access
– What level of access
– Any training necessary
– Who will fix problems
– Who will maintain information
Keith V. Farrell10/27/2009 19
![Page 20: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/20.jpg)
Expandable and Software Life-span
• What will be your PSI needs in the Future
• What software will be there at that time
Keith V. Farrell10/27/2009 20
![Page 21: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/21.jpg)
Cost Analysis
• Equipment
• Software
• Training for Leaders
• Savings!!!!!!!
Keith V. Farrell10/27/2009 21
![Page 22: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/22.jpg)
Equipment
• Seven Monitors @ $150 each
– Two – Operators
– Three– Engineers
– Two – Other Skill Sets
• One Document Camera @ $2000
• Other Minor Equipment @ $300
Keith V. Farrell10/27/2009 22
![Page 23: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/23.jpg)
Software
• PHA Software (Current)
• Adobe Writer @$650
(Based on the assumption you have a computer and associated operational software)
Keith V. Farrell10/27/2009 23
![Page 24: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/24.jpg)
Total Cost
• Equipment = $3350
• Software = $650
• Total = $3850
Keith V. Farrell10/27/2009 24
![Page 25: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/25.jpg)
Training for Leaders
Necessary Training
•Basic Leader Development (In House?)
•Basic Instructor Development (In House?)
•Negotiating Development (In House?)
Items to consider
•Basic Interview Development
•Basic Speakers Development
Keith V. Farrell10/27/2009 25
![Page 26: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/26.jpg)
Savings!!!!!!!
• Time for Initial Studies
– Normal; 5 to 8 weeks
– With Enhancements; 3 to 4 weeks
• Using one Operator & two Engineers; combined cost $270/hr
• Time Savings ~$11,300 per study
Keith V. Farrell10/27/2009 26
![Page 27: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/27.jpg)
Savings, cont.
• Time for Revalidation Studies
– Normal; 2 to 4 weeks
– Enhanced; 1 to 8 study days
• Using one Operator & two Engineers; combined cost $270/hr
• Time Savings ~ $11,300 for each study
Keith V. Farrell10/27/2009 27
![Page 28: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/28.jpg)
The Bottom Line
• Hardware and Software Total = $3350
• Savings per study = ~ $11,300
• Net Saving for the first Study = $7,450
Keith V. Farrell10/27/2009 28
![Page 29: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/29.jpg)
Last Comment
Keith V. Farrell10/27/2009 29
DesiredDesiredResultsResults
PSIPSI
PH
AP
HA
Changes
Changes
![Page 30: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/30.jpg)
THANKS
•Mary Kay O’Connor Process Safety Center
•Dr. M. Sam Mannan
•INVISTAKeith V. Farrell
10/27/2009 30
![Page 31: Kv Farell Pha Study Enhancement](https://reader037.fdocuments.us/reader037/viewer/2022103110/54b3033e4a7959f61c8b45cb/html5/thumbnails/31.jpg)
A Few Questions????
Questions
Questions
Questions
Questions
Questions
Keith V. Farrell10/27/2009 31