KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA) ...

26
KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA) http://www2.kumc.edu/research institute/ Presented by Vickie Eaton

Transcript of KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA) ...

Page 1: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

KUMC Research Institute

How to Think Through a Grant Budget

Sponsored Programs Administration (SPA)

http://www2.kumc.edu/researchinstitute/

Presented by Vickie Eaton

Page 2: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Sponsored Programs Administration (SPA)

Assist faculty and staff in acquiring extramural support for research, education and service projects.

Ensure that these projects are conducted in compliance with federal and state regulations, university policies and commitments specified in grants, contracts and other agreements with external sponsors.

Page 3: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Sponsored Programs Administration (SPA)

Pre Award – Assist PI with grant proposal development, review and submission

Post Award – New account set up, grants monitoring, and financial reporting

Page 4: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

How to think through a grant budget

Budget initiation and preparation Cost Sharing Multiple projects/Multiple PIs Subcontracts and subawards Budget negotiation Basic science research vs. clinical research vs.

educational grants

Page 5: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget Initiation and Preparation Develop a budget (financial plan) after the Research

Plan is drafted Estimate project costs based on Aims and Methods

proposed in the Research Plan Make sure all costs are covered, do not over or under

estimate the costs needed Budget Type -Modular budget -Non-Modular budget

Page 6: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget Initiation and Preparation

Total Costs consist of: Direct Costs

Costs that can be specifically identified with a particular project or activity.

Facilities and Administrative Costs (F&A)

Costs that are incurred by a grantee for common or joint objectives and cannot be identified specifically with a particular project or program. These costs are also known as "indirect costs."

Page 7: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget Initiation and Preparation

Budget Types: Modular Format – used for NIH applications that

request $250,000 or less per year in direct costs. Non-Modular Format (see attachment) – used for

NIH applications that request more than $250,000 per year in direct costs.

Page 8: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Modular Grant Request funds in modules of $25,000. There will be no

future year escalations. List all personnel, including names, percent of effort and

roles on the project List the individuals/organizations with whom consortium

or contractual arrangements have been made List equipment item(s) needed for the project Make sure you have enough funds needed for supplies

and other project costs after personnel costs are determined

Page 9: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular

Permission is required from NIH at least 6 weeks prior to the anticipated submission of any application requesting $500,000 or more in direct costs for any year.

Investigators submitting an NIH application seeking $500,000 or more in direct costs in any single year are expected to include a plan for data sharing or state why data sharing is not possible.

Costs requested must be allocable, reasonable and allowable under OMB Circular A21.

Page 10: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Budget Categories: Personnel Consultants Equipment Supplies Travel Consortium/Contractual Costs Other Expenses Unallowable Costs

Page 11: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.Personnel Provide brief descriptions of duties for all positions listed in

the budget, with the percent of effort requested (in calendar month) each year and any anticipated fluctuations.

“To be named” personnel are often deleted by reviewers. List Institutional Base Salary (all sources including teaching,

research and clinical) for each individual. Current salary limitation on NIH proposal is $191,300. KUMC Fringe Benefits - Faculty and Staff: 28%, Students:

2%. Use inflationary or escalation factors as appropriate.

Page 12: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Consultant Whether or not costs are involved, provide the names

and organizational affiliations of all consultants. Describe the services to be performed include the

number of days of anticipated consultation, the expected rate of compensation, travel, per diem, and other related costs.

Page 13: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Equipment List each item with acquisition cost of $5,000 or

more.- Estimate the cost of equipment using an

appropriate cost estimation method such as vendor quotes or catalog prices. Make sure that sales tax, duty, transit insurance, freight, and installation charges are included in the estimated cost.

Page 14: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Supplies Itemize supplies in separate categories, such as

glassware, chemicals, radioisotopes, Animal purchase needs to be specified with the

species and the number to be used. Office supplies are normally treated as F&A

costs, NOT direct costs, on NIH research grant.

Page 15: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Travel List domestic travel and foreign travel separately.

Foreign travel is defined as any travel outside of Canada and the United States and its territories and possessions.

Estimate airfare, hotel and ground transportation (e.g., rental car) costs.

Page 16: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Other Expenses Itemize any other expenses by category and unit

cost, such as animal maintenance, publication costs, computer charges, service contracts, equipment maintenance, rentals and leases.

Postage, local phone charges & memberships shall be treated as F&A costs on NIH research grants.

Page 17: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Unallowable Costs: Food Alcoholic beverages Employee parking fees Entertainment charges Cell phone Any other unallowable costs specified by sponsor

(i.e. books, PI salary, membership….)

Page 18: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Consortium/Contractual CostsCollaborative arrangement in support of a research

project in which part of an activity is carried out

through a formal agreement between a grantee and

one or more other organizations.

Page 19: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Non-Modular, cont.

Patient Care Costs Provide the names of any hospitals and/or clinics

and the amounts requested. List the number of patient days, estimated cost per

day, and cost per test or treatment. Provide inpatient and outpatient costs separately. If multiple sites are to be used, provide detailed

information by site.

Page 20: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget – Modular/Non-Modular

F&A Costs (Indirect Costs) KUMC F&A rates: On campus – 50% of MTDC* Off campus –26% of MTDC*

Training/Instruction – 41% of MTDC Other Sponsored Activities – 33% of MTDC (Clinical trials

should use this rate for budget calculation)

* The basis for F&A costs calculation. The basic indirect costs are calculated on a subset of direct costs, normally excluding equipment, patient care, tuition, scholarship, space rental, alterations and renovations, and subcontract costs in excess of the first $25,000.

Page 21: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Cost Sharing

Cost sharing is the portion of project or programcosts not borne by the Federal Government. Mandatory Cost Sharing - required by the funding source. Voluntary Cost Sharing- committed but not required by

the funding source. Please remember that all cost share is AUDITABLE. PI

and Department/Center must be accountable for cost share that is committed.

*Do not propose more than what is required!

Page 22: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Multiple projects/Multiple PIs

- Detailed budgets by project/core are required for Program Project grants (P01), Research Center Grants (P20,P30,P50..) and Multiple PIs grant

Page 23: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Subcontracts and Subawards

F&A costs shall not be applied to the subcontract amount in excess of $25,000

If proposal involves personnel from KU and no other costs, KU personnel should be listed in the personnel category. When grant is awarded the associated F&A for KU personnel will be reallocated from our F&A budget to KU.

Page 24: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Budget negotiation

What to cut when your grant is funded for less than

you requested?

-Aims may need to be revised

-Revise key personnel effort

-Seeking institutional support

-Do not let sponsor make the decision for you

Page 25: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

Basic Research vs. clinical research vs. educational grants

Budget items unallowable on research grant may be allowable on educational grants. e.g. office supplies & membership

Budget for clinical research (per patient costs) shall have full F&A rate included unless it’s capped by the sponsor

Page 26: KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA)  Presented by.

SPA Pre- Award Contacts

Mei-Shya Chen, Director

[email protected] 8-1259

Pre-Award Services 8-1251

[email protected]

Vickie Eaton 8-1239– Funding opportunities, PI last name

beginning with A thru G

Anca Geana 8-5717 – H thru Q

Elena Reyes 8-5361– R thru Z