KU reader

112
TRACES

description

2011-2012 Studio 3.1 reader

Transcript of KU reader

Page 1: KU reader

TRACES

Page 2: KU reader
Page 3: KU reader
Page 4: KU reader
Page 5: KU reader

TRACES

Ka Chi

K1057053

Page 6: KU reader
Page 7: KU reader

Studio Houghton Baty

Jane HoughtonStephen Baty

Tone

‘The Si lver Pavi l ion is famous worldwide for i ts s impl ic i ty and ref inement, at t ract ing a steady stream of v is i tors throughout the year. I ts beauty is found in features l ike the splendid structure of the temple, the miracle of making the garden; the elegant study room, Kogetsudai; the moon-viewing plat form, Ginsadan; the garden with i ts sea of s i lver sand - the l is t goes on and on. Yet what leaves the strongest impression is the fact that th is temple stands as the core of the Japanese aesthet ic, which transcends t ime and histor ical era. Cleaned day af ter day, weathered over t ime, the Si lver Pavi l ion reveals i ts natural beauty as i t ages, as though i t was str ipping of i ts vei ls one af ter another. ’

Kenya Hara

Page 8: KU reader
Page 9: KU reader

Tone ______________________________________________________________________________________________________7

Wapping_____________________________________________________________________________________________10 Chapter 1 Traces ___________________________________________________________________________________________________14 Wharf Gate Lock Chapter 2 Revealing/Concealing__________________________________________________________________22 Wall Corridor Street

Chapter 3 Schematic Development____________________________________________________________30 Brief Historical fabric Building form is the solution

Chapter 4 Strategies___________________________________________________________________________________________42 From private to public Blocks/Walls Walls/Openings

Chapter 5 Spatial and Planning Development______________________________________50 Precedent studies Massing Model Chapter 6 Rational/Irrational___________________________________________________________________________73 Working drawings and models Chapter 7 Material and tectonic___________________________________________________________________102 Load bearing Grid Beam Diagram Envelop

Page 10: KU reader

10/11

Rose Garden

Like most of the places in london, i t is surrounded by br icks bui lding. The garden was a high densi ty land with warehouse, dwel l ing and school in the beginning of last centry. Bombs destroyed most of the bui lding dur ing WWII. The Tower Hamlet Counci l t r ied to redevelop i t for dwel l ing. But i t turned up into a garden at the end.

Wapping high street is on the south of Rose Garden along the thames. I t was a very busy street when wapping was st i l l a busy whar f area. Now, the high street is st i l l the main circulat ion to connect wapping to other places in Tower Hamlet f rom east to west.

The project is, to bui ld a elder ly care home on this garden. Fi l l i t up again s ince WWII wi th a new community.

Page 11: KU reader

Wapping

Page 12: KU reader

12/13

Page 13: KU reader

Wapping, northbank of thames

Page 14: KU reader

Traces

Nothing is not inevi table. From a facade (outdoor) to a hal lway with wal l mount cupboard ( indoor) .Sur faces are washed away by rain water, dr ied by the sun and repaint by human being. I t ’s a process of communicat ion ,between human and the nature. And marks were lef t on the facade and i t becomes a media of communicat ion. They are cues of stor ies underneath, which cannot be read ent i re ly, cannot be erased and cannot be rewri t ten. But they have occurred. We cal l these stor ies ‘exper iences’ which pol ish human and non-human. This natural process give inconspicuous qual i t ies, a subt le and del icate rhythm, which are not di ff icul t to be observed. Stay here and be drawn into t rance, touch i t , smel l i t and don’t miss out any s ingle t races. Then, they star t te l l ing you their stor ies.

14/15

Page 15: KU reader

Chapter 1 Traces

Page 16: KU reader

Wharf

Wapping is located in nor th bank of thames, par t of London Borough of Tower Hamlets’s docklands. I t was a whar f area before WWII. Goods from the world were t ranspor ted through the thames by ships. A ser ies of br ick whar f bui ldings, as wel l as warehouses, moved the goods inside from the ships by a boom on the bui lding. Goods were then transferred to the street level by another set of boom facing to the wapping high street.

They are the entrance, barr iers or sor t of control ler of the entry of the goods.

After wor ld warI I , wapping was destroyed by the bomb. I t is not a whar f area anymore. The undestroyed whar f bui ldings were transformed into resident ia l bui lding. However, the industr ia l whar f bui ldings which were bui l t wi th Br icks, heavy t imber and steel lef t a strong image of industr ia l to th is middle class l iv ing area nowaday.

16/17

Page 17: KU reader

Wharf, wapping

Page 18: KU reader

Gate

The events in th is bui lding gave i t a form, which was bui l t by br icks. The heavy t imber l intel suppor t the opening of the warehouse. The t imber doors have to be tough and strong, in order to cope with the heavy logist ic work everyday. A ser ies of f loor to cei l ing height t imber door expresses the funct ion of the bui lding. Goods in and goods out. I t is an cooperat ion between di fferen mater ia ls.

The whar f is a t ransi t ion space, i t is a threshold. The doors are the last boundry. When i t opened, good from the world came in. When i t was closed, the ci ty was closed to the outside world.

18/19

Page 19: KU reader

Wapping High Street - Facade of K warehouse, St John Whar f .

Page 20: KU reader

Locks

More than one door lock holes are on the whar f t imber door. Uncountable scratches are on the sur face. People can re-paint the door and keep using i t for years. But the paint can not cover the scratches. The paint cannot f i l l up the old door lock holes. The story of th is door can be traced through these scratches.

20/21

Page 21: KU reader

Wapping High Street - Lock of t imber door.

Page 22: KU reader

Reveal ing/Conceal ing

A locked box is a concealed space. Reveal ing the box, and br ing the connect ion in f rom the outside world. They change each others. The change develops the exper ience of the spaces. I t is extension, invasion and adaptat ion.

The qual i ty of such process is depends on the scale of the box.

22/23

Page 23: KU reader

Chapter 2 Revealing/Concealing the box

Page 24: KU reader

Wall

Boxes of gloves have been stored in the wal l mount cupboard. Di fferent s izes and di fferent sty les of gloves are hidden in the boxes. Boxes are stored on the cupboard in a strong order. I t is a catalog.Informat ions are locked. I t is an instal lat ion presentaing the subject of th is space. I t is par t of the space but gives the impression of th is glove shop.

24/25

Page 25: KU reader

Belgium - Gloves store, Storage and display

Page 26: KU reader

Corr idor

Another ser ies of wal l mount cupboard, in a larger scale, forming the a corr idor. The cupboard is the space i tsel f . Repet i t ion of same language gives a strong order. But the s l ight ly open doors of cupboard gave an exci tment to the space, a very subt le change of the rhythm.

26/27

Page 27: KU reader

Royal hospital , Chelsea - Hal lway with wal lmount cupboard

Page 28: KU reader

Street

A ser ies of “cupboard” in a even bigger scale. They are food kiosks connected to the food market at the back. I t is par t of the bui lding when i t c loses. I t becomes par t of the street when i t opens. And i t connect the bui lding,the food market, wi th the street. The street gain another funct ion f rom the food market. At the same t ime, the food market gain the atmosphere from the street.

28/29

Page 29: KU reader

Belgium - Food kiosks, exrension of an indoor market

Page 30: KU reader

Quest ion: Traces + programSolut ionr: Histor ical e lements Reveal ing/Conceal ing

30/31

Page 31: KU reader

Chapter 3 Schemeatic development

Page 32: KU reader

Inf i rmary and Wapping day act iv i t ies centre for e lder ly people

This is a bui lding elder ly wi l l l ive here for last page of their l i fe. They wi l l be gone but lef t the t races in the bui lding. This bui lding need an container , a box of th is. So the main programs of th is bui lding are the Care home and a museum. A museum where putt ing the dead elder ly names and monument in i t

I t is a catalog of people spent their rest of l i fe in th is bui ld ing.

This is a mixed-use bui lding with comprehensive programs. From the very publ ic gmemorial garden to a ver int imate bedroom of the elder ly. The composi t ion of inf i rmary and bedroom encourage the community inside the bui lding. When people is staying in the inf i rmary, they are not just in an hospital , they are v is i t ing somebody’s home. And, the museum is open to publ ic, connect ing with an memorial garden, chapel and other publ ic faci l i t ies. I t is because elder ly shouldn’t be just staying in their own room for their rest of l i fe.

Elder lys are the stakeholders of the bui ld ing as wel l as the wapping.

Programs including:care home BedroomInf i rmaryOff icesDinning hal lServices ( loundry, hair dressing)LibraryTherapy poolChapelMuseumMemorial GardenSuppor tat ive services( car park, recept ion)

The bui lding including very pr ivate program and ver publ ic program. The bui lding have to be wel l control led by planning and the design of the boundary

32/33

Page 33: KU reader

Belgium -Care Home, entrance of bedroomChelsea royal hospi ta l - l iv ing uni t , Band singing infront of the chimney

Page 34: KU reader

Histor ical Fabr ic

Deriv ing the bui lding form from the histor ical map. Seeking the potent ia l of the space in the histoy. Reconnect ing now and the past.

34/35

Page 35: KU reader

Histor ical study - Wapping from 1870 - now

Page 36: KU reader

Schematic model - Histor ical void 36/37

Page 37: KU reader

Schematic model - Histor ical Sol id

Page 38: KU reader

Bui ld ing form is the solut ion

A l inear mass with opening on 2 s ides as a solut ion of connect ing the publ ic and the pr ivate as wel l as imerging to the histor ical fabr ic.

38/39

Page 39: KU reader
Page 40: KU reader

Schematic model - Soane corr idor in Royal hospi ta l 40/41

Page 41: KU reader
Page 42: KU reader

Placing of the bui ld ing mass

Relat ionship between publ ic and pr ivate is control led by the placing of bui lding masses

The connect ion between of the bui lding masses is controled by the openings

A ser ies of heavy t imber door

42/43

Page 43: KU reader

Chapter 4 Strategies

Page 44: KU reader

From pr ivate to publ ic

The road is seperated by the rai lway. I t is the busiest e lement in the photograph. Take out the rai lway, and the road wi l l come togather

44/45

Page 45: KU reader

Rai lway, Wapping power stat ion

Page 46: KU reader

Blocks/Wal ls

Whe the doors are closed. The elements are stand alone. i t is c lear that 5 blocks are in the paper.

When the doors are opened. They come together. They are no more blocks, they are wal ls.

46/47

Page 47: KU reader

Sketch, strategy of connect ion

Page 48: KU reader

48/49

Page 49: KU reader

Strategy drawing, LEFT conceal l ing, Right reveal ing

Page 50: KU reader

Walls/openings

Propor t ion of openings and wal ls def ined the funct ion of the bui lding block. Can a man go thruogh? Can a wheel chair go through? Can a bed go through? Can a t ro l ley go thorugh? Can a group of people go through?

50/51

Page 51: KU reader

Concept drawing - Ink pr int of wal ls and opennings, Penetrat ion of space 1of 3

Page 52: KU reader

Precendent studies of di fferent k ind of care home with di fferent scheme have di fferent strategy to tackle the problem.

Deriv ing elements f rom the histor ical model for fur ther development. Capture moments in these models and put i t back into the design

52/53

Page 53: KU reader

Chapter 5 Spatial and planning development

Page 54: KU reader

Precedent studies : Chelsea 54/55

Page 55: KU reader

Precedent studies : Dubl in

Page 56: KU reader

Liv ing uni t Study - Transformat ion of a Histor ical geometry 56/57

Page 57: KU reader

Bui lding language study - Posi t ive space

Page 58: KU reader

Bui lding language study - Posi t ive space drawing 58/59

Page 59: KU reader

Bui lding language study - negat ive space drawing

Page 60: KU reader

Bui lding language study - Posi t ive space mould 60/61

Page 61: KU reader

Bui lding language study - Negat ive space wax cast

Page 62: KU reader

Bui lding language study - Elevat ion 62/63

Page 63: KU reader
Page 64: KU reader

Rational izat ion

The f i rst overal l planning was aimed at rat ional ized the histor ical foot pr int which was a maze. Transforming the footpr int into straight l ine in order to def ine the program, to make sure the language is consistant and to explored the potent ia l and constraint between the histor ical foor peint and instant context .

64/65

Page 65: KU reader

! :100 Working drawing 1

Page 66: KU reader

66/67

Page 67: KU reader

! :100 foam board model 1

Page 68: KU reader

I r rat ional izat ion

The second planning based on the previous one, t ry ing to immerge back into the maze l ike histor ical footpr int .

68/69

Page 69: KU reader

1:100 Working drawing 2

Page 70: KU reader

70/71

Page 71: KU reader

1:100 Foam board model 2

Page 72: KU reader

The histor ical footpr int is the potent ia l of the project as wel l as the main constraint of planning.

Elder ly care wards and inf i rmary need a rat ional layout to fu l l f i l the program requirement.

Publ ic programs can be loose in both form and planning to respond the instant context which is surrounded by rough warehouses/whar f layout.

72/73

Page 73: KU reader

Chapter 6 Rational/Irrational

Page 74: KU reader

74/75

Page 75: KU reader
Page 76: KU reader

G/f plan, Working drawing , 1:200 in A1 76/77

Page 77: KU reader
Page 78: KU reader

G/f

1

2

3

4

8

8

56

10

12 13

14

11

19

18 18

18

15

16

20

9

7

9

1. Bedroom2. Siting Area3. Bathroom4. Loundry5. Infirmary reception6. Infirmary entrance

9. Morning terrace

7. Office8. Fire escape

10. Dining Hall11. Kitchen12. Public toilet13. Chapel14. Memorial museum15. Memorial Garden16. Indoor exhibition17. Public Foyer

19. Outdoor exhibition18. Light well

78/79

Page 79: KU reader

G/f

1

2

3

4

8

8

56

10

12 13

14

11

19

18 18

18

15

16

20

9

7

9

1. Bedroom2. Siting Area3. Bathroom4. Loundry5. Infirmary reception6. Infirmary entrance

9. Morning terrace

7. Office8. Fire escape

10. Dining Hall11. Kitchen12. Public toilet13. Chapel14. Memorial museum15. Memorial Garden16. Indoor exhibition17. Public Foyer

19. Outdoor exhibition18. Light well

G/f plan, 1:100 in A1

Page 80: KU reader

1st/f

1. Sleeping area2. Library3. Bathroom4. Roof Gardeb5. Infirmary

7. Staff pentry8. Loundry9. Toilet10. Fire excape

6. Office

1

2

3

4

10

10

5

6

7

89

80/81

Page 81: KU reader

1st/f

1. Sleeping area2. Library3. Bathroom4. Roof Gardeb5. Infirmary

7. Staff pentry8. Loundry9. Toilet10. Fire excape

6. Office

1

2

3

4

10

10

5

6

7

89

1/f plan, 1:100 in A1

Page 82: KU reader

Basement1. Lift Lobby2. Changing room3. Storage4. Therapy pool5. Main plant room6. Massage room7. Toilet8. Second plant room9. Fire escape staircase

1

2

5

4

4

3

4

6

6

9

8

82/83

Page 83: KU reader

Basement1. Lift Lobby2. Changing room3. Storage4. Therapy pool5. Main plant room6. Massage room7. Toilet8. Second plant room9. Fire escape staircase

1

2

5

4

4

3

4

6

6

9

8

Basement plan, 1:100 in A1

Page 84: KU reader

Working model, west elevat ion 84/85

Page 85: KU reader

Working model, east e levat ion

Page 86: KU reader

Roof plan , 1:200 in A1 86/87

Page 87: KU reader
Page 88: KU reader

A

D

D

A

B

B

C

C

88/89

Page 89: KU reader

Internal e levat ion AA, 1:100 in A1

Internal e levat ion BB, 1:100 in A1

East elevat ion, 1:100 in A1

Page 90: KU reader

Sect ion DD !:!00 in A! 90/91

Page 91: KU reader
Page 92: KU reader

92/93

Page 93: KU reader

Working model, Main entrance and garden

Page 94: KU reader

94/95

Page 95: KU reader

Working model, High Street elevat ion

Page 96: KU reader

96/97

Page 97: KU reader

Working model, Memorial garden

Page 98: KU reader

Sketch, histor ical foot pr int sect ion 98/99

Page 99: KU reader
Page 100: KU reader

Order

Strong order because of the funct ion of inf i rmary. Very conducted facade expressing the indiv idual occupier in th is block.

I t is a col lect ive of indiv idual pr ivate space.

100/101

Page 101: KU reader

Working models, Inf i rmary

Page 102: KU reader

Engl ish Bond br ick wal lBr icks pier/columnLoad bear ing blocksSteel L intelTimber LintelSteel I beamTimber jo ist

102/103

Page 103: KU reader

Chapter 6 Tectonic and material

Page 104: KU reader

Grid

Grid on the lef t has strong order

Grid on the r ight has a loose order

104/105

Page 105: KU reader

Load bear ing gird

Page 106: KU reader

Horizontal rhythm

As same as the load bear ing gr id

From lef t to r ight, f rom strong to loose

106/107

Page 107: KU reader

Beam diagram, 1:100 in A1

Page 108: KU reader

Facade for responding instant context

Engl ish Bond br ick wal l

Load bear ing blocks

Steel L intel

Steel I beam

Timber jo ist

108/109

Page 109: KU reader

Envelop detai l drawing, 1:20 in A1

Page 110: KU reader

View of south bank from wappin 110/111

Page 111: KU reader
Page 112: KU reader