KTD DEVELOPMENT - Environmental Protection · PDF filefigure 13.4b2-nts photo e3 from hkcec...
1
- FIGURE 13.4B2 NTS PHOTO E3 FROM HKCEC PHOTO E4 FROM Mt. CAMERON PHOTO E5 FROM THE PEAK PHOTO E6 FROM KOWLOON PEAK PHOTO E7 FROM LUNG CHEUNG ROAD LOOKOUT BASELINE VIEWPOINTS FROM KEY VSRs AT STRATEGIC AND DISTRICT LEVEL (SHEET 2 OF 2) KTD DEVELOPMENT KTD DEVELOPMENT KTD DEVELOPMENT KTD DEVELOPMENT KTD DEVELOPMENT FL JC MAY 2008 20/10/2008 D:\Kai Tak\Drawing\Dgn\FIGURE 13-04-B2.dgn Plot File by : SCALE CHECK DRAWN DATE JOB No. DRAWING No. REV 60022408 AGREEMENT NO. CE 35/2006 (CE) KAI TAK DEVELOPMENT ENGINEERING STUDY CUM DESIGN AND CONSTRUCTION OF ADVANCE WORKS-INVESTIGATION, DESIGN AND CONSTRUCTION
Transcript of KTD DEVELOPMENT - Environmental Protection · PDF filefigure 13.4b2-nts photo e3 from hkcec...
-FIGURE 13.4B2
NTS
PHOTO E3
FROM HKCEC
PHOTO E4
FROM Mt. CAMERON
PHOTO E5
FROM THE PEAK
PHOTO E6
FROM KOWLOON PEAK
PHOTO E7
FROM LUNG CHEUNG ROAD LOOKOUT
BASELINE VIEWPOINTS FROM KEY VSRs ATSTRATEGIC AND DISTRICT LEVEL (SHEET 2 OF 2)
KTD DEVELOPMENT
KTD DEVELOPMENT
KTD DEVELOPMENTKTD DEVELOPMENT
KTD DEVELOPMENT
FLJC
MAY 2008
20/
10/
20
08
D:\Kai Tak\Drawing\Dgn\FIGURE 13-04-B2.dgn
Pl
ot
File
by :
SCALE
CHECK DRAWN
DATE
JOB No. DRAWING No. REV
60022408
AGREEMENT NO. CE 35/2006 (CE)
KAI TAK DEVELOPMENT ENGINEERING STUDY CUM DESIGN AND CONSTRUCTION OF ADVANCE WORKS-INVESTIGATION, DESIGN AND CONSTRUCTION