5m0m 10m
GROUND FLOOR PLAN
BIC
FR
TV
BIC
SHOWERROOM
FR
TV
BIC
BIC
SHOWERROOM
LIFT
AIRC
ON
SHAFT
HOUSE KEEPING(LINEN & CLEANING)
FR
FR
INFORMAL LOUNGE& FIRE PLACE
OPEN-PLANLOBBY
GUEST WC'S
SELF-HELPC
OUN
TER
TIMBER FIREDOOR
FIRE ESCAPE,
TIMBER FIREDOOR
STORAGE &SERVICES
RECEPTION
OUTLINE-OFFICE/ADMIN
SPACE
ENTRANCE
ENTRY INTO BASEMENT
OUTLINE OF BUILDING ABOVE
OUTLINE OF BUILDING ABOVE
up
FHR
COMS ELEC
REFUSESHOOT
down
FHR
ELEC
TV
TV
BIC
FR
TV
PATIO PATIO 3M BUILDING LINE
OUTLINE OF BUILDING ABOVE
SHOWERROOM
ERF
BOUN
DA
RY
A270
RAM
P 1:
7 D
OW
N T
O E
NG
. SPE
CIF
ICA
TION
S
3048
110
BIC
270
463
110
5833
5349
17768
PATIO PATIO
10779
4662
270
3210
1662
5116
A
230
1343
110
4300
3074
480
5210
2182
RAMP 1:25 UP FROM STORMWATER
CHANNEL TO KERB
1390
5936
2244
300
1500
FR
BIC
BIC
6440
TV
4843
SHOWERROOM
ERF BOUNDARY
2000
270
6980
ERF BOUNDARY1282
ERF
BOUN
DA
RY
270
3000
608
2947
270
989
3130
STORAGE
HOTEL ROOM 1 HOTEL ROOM 2 HOTEL ROOM 3 HOTEL ROOM 4
Raised groundfloor for basementventilation
Raised groundfloor for basementventilation
Raised groundfloor for basementventilation
Raised groundfloor for basementventilation
Raise
d g
roun
dflo
or fo
r bas
emen
tve
ntila
tion
5m0m 10m
FIRST & SECOND FLOOR PLAN
FR
TV
BIC
BIC
SHOWERROOM
FR
TV
BIC
BIC
SHOWERROOM
BIC
BIC
SHOWERROOM
SHOWERROOM
TIMBER FIREDOOR
BIC
BIC
SHOWERROOM
SHOWERROOM
SHOWERROOM
SHOWERROOM
BICBIC
BIC
TVFR
FR
TVFIRE ESCAPE,
AIRC
ON
SHAFT
HOUSE KEEPING(LINEN & CLEANING)
SHOWERROOM
FR
FHR
ELEC
BIC
BIC
up
FHR
COMS ELEC
REFUSESHOOT
TV
BIC
BIC
BIC
BIC
SHOWERROOM
5790
230
10779
230
1500
270
4620
1000
480
2760
4135
3950
230230 270
4135
110
1500
270
600
4830
1421
1500
110
12269
230
3824
2645
1394
2262
230
270
1894
1240
1500456
270
4458
4830
110
6249
230
6980
270
2577
270
230
270
1240
1500
2278
110
4135
230 230
4135
2081
3884 535
110
1524
270
4531
1240
4300
4801
HOTEL ROOM 9 &19
4365
HOTEL ROOM 12 & 22
3210
9588
29051000
29051000
2780
270
110
2129
480
1280
1184
A
LIFT
17768
270
270
3130
4135
270
4135
230
1500
230
2760
3210
1664
1500
1000
HOTEL ROOM 5 &15 HOTEL ROOM 6 &16 HOTEL ROOM 7 &17 HOTEL ROOM 8 &18
HOTEL ROOM 10 & 20
HOTEL ROOM 11 & 21
HOTEL ROOM 13 & 23
HOTEL ROOM 14 & 24
FR
FR
TV
BIC BIC
FRFR
TV
TVTVTV
FR
5m0m 10m
BASEMENT PLAN
LAUNDRY FACILITIES
STAFF FACILITIES
REFUSE
8 X PARKING SPACES - BASEMENT 1
RAMP UP
RAMP UP
RAMP UP
RAMP UP
FHR
REFUSESHOOT
4.
LIFT
up
ELECCOMS
down
3.
7.
2. 1.
8.6.5.
A
A
GREY WATER INFRASTRUCTURE
4320
5184
4580 2850 2500 2851
7380
2850 2500 2500 2501 3700
5m0m 10m
KRIGE STREET ELEVATION
ERF
BOUN
DA
RY
3210
1343
ERF
BOUN
DA
RY
13858
4292
Raised groundfloor for basementventilation
Raised groundfloor for basementventilation
1848
HOTEL ROOM
HOTEL ROOM
3410
1:25 up for first 2mfrom stormwater
channel
1:8 ramp down
1:17 ramp down1:8 ramp down
1:8 ramp down
1:17 ramp down
1:7 ramp down
LOWER BASEMENT PARKING
BASEMENT PARKING
2458
2325
2733
HOTEL ROOM
EN-S
UITE
HOTEL ROOM
EN-S
UITE
Ground floorset-back
0m 5m
SECTION A-A
2700
ERF
BOUN
DA
RY
ERF
BOUN
DA
RY
10m
NOTE: ALL BASEMENT FLOORLEVELS TO BEFINALIZED PENDINGALLOWANCES REQUIREDFOR STRUCTURE &MECHANICAL EXTRACTIONAND SERVICES.
2635
340
2465
680
680
680
3116
3230
2976
10000
Raised groundfloor for basementventilation
Raised groundfloor for basementventilation
Ventilation grid for naturalventilation of basementarea
services services services
servicesservices services
2000
2636
WA
LL P
LATE
HEI
GHT
RES
TRIC
TION
Ventilation grid for naturalventilation of basementarea
5m 10m
LOWER BASEMENT PLAN
0m
ELEC
10 X PARKING SPACES - BASEMENT 2
13.
11. 10.12.
15.
9.
14. 18.17.16.
LIFT
up
FHR
COMS
A
A
STORAGE & SERVICES
MECHANICAL & MAINTENANCE
RAMP UP
RAMP UP
4580 2850 2500 2850
2850 2500 2500 37002500 2500
2850
7380
CLIENT:
PROJECT TITLE:
DRAWING TITLE:
PROJECT No.: SCALE:
DRAWING No.: DATE:
REV. DRAWN: CHECKED:
This drawing and all the information contained thereon is the
property of Dennis Moss Partnership and may not be copied
or disclosed to a third party without their written consent.
HANDRE BASSON
KRIGE STREET
HOTEL
FLOORPLANS, SECTION
& ELEVATION
AS SHOWN
29-03-2018
ABB
FOR DISCUSSION
Proposing raising the building by 680mm to be able to let in naturalventilation for the first basement.