Seite 1 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Transparency in the Interest of Builders and Investors CONFLICT-FREE ENGINEERING WELCOME TO Flyer WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING General Contractor

description

The Best projekt Managemnet Solution of BIG Construction Project . We are stop Time and Costs Overrruns

Transcript of Krauck system englisch flyer

Page 1: Krauck system englisch flyer

Seite 1 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING

Transparency in the Interest of Builders and Investors CONFLICT-FREE ENGINEERING

WELCOME TO

Flyer

WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING

General Contractor

Page 2: Krauck system englisch flyer

Seite 2 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 2

The Problem

Skyrocketing costs for Skylink

The unsolved problem

Construction cost and time overruns?

10,000 different plans!

There is a lack of matching plans

It lacks the overall organization for

the planning

ThyssenKrupp-Brasilia

Elbphilharmonie, Hamburg

Airport Berlin

Page 3: Krauck system englisch flyer

Seite 3 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 3

THE CENTRAL

QUESTION:

„Why do a lot of construction projects end

up with cost explosions and time delays?“

Page 4: Krauck system englisch flyer

Seite 4 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 4

The Cause

Despite the best planners, project managers, contractors and systems

11 – Fire-Extinguishing System*

13 - Ventilation*

1 - Architecture

5 – Structural Planning

10 - Sanitary *

16 – Low Voltage Current *

15 – High Voltage Current *

17 - Conveyors*

20 – Renters‘ Fitout *

19 – Building Site Facilities 4 - Frontage *

7 - Slot-/Breakthrough-Planning

18 – Building Automation

9 – Outdoor Facilities *

12 - Heating *

21 - Facility-Management

8 – Fire Prevention *

2 – Structural Work *

3 - Fitout *

14 - Coldness *

6 - Formwork-/Reinforce-Planning

* Additionally 21 main trades above

50 sub-trades possible!

Page 5: Krauck system englisch flyer

Seite 5 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 5

The Solution

KRAUCK-SYSTEMS takes responsibility of

coordinated plans and leads all specialist

planners like a navigation system through the project!

11 – Fire-Extinguishing System*

13 - Ventilation*

1 - Architecture

5 – Structural Planning

10 - Sanitary *

16 – Low Voltage Current *

15 – High Voltage Current *

17 - Conveyors*

20 – Renters‘ Fitout *

19 – Building Site Facilities 4 - Frontage *

7 - Slot-/Breakthrough-Planning

18 – Building Automation

9 – Outdoor Facilities *

12 - Heating *

21 - Facility-Management

8 – Fire Prevention *

2 – Structural Work *

3 - Fitout *

14 - Coldness *

6 - Formwork-/Reinforce-Planning

• Additionally 21 main trades above

50 sub-trades possible!

Clearing by

KRAUCK SYSTEMS

Page 6: Krauck system englisch flyer

Seite 6 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 6

The Invention

Krauck Systems enables this by:

Our in-house developed software and systems solutions for every phase of the project

Our unique clearing and project coordination system

KS-Systems modules for use in all project phases 1 KS-Real-Dos; Real-Data-Operating-System

2 KS-Datawall

3 KS-PCS; Projekt-Coordination-System

4 KS-Building Owner-Advisor

5 KS-Real-PM (Project-Management-Project-Controlling)

6 KS-Legal Project-Management

Claims-Management (Insurances, …) 7 KS-Quality-Control 8 KS-Marketing-Portal

9 KS-Plant-Documentation

10 KS-Logistic

11 KS-Total-Planning

12 KS-Construction Control

13 KS-Production-Automization

14 KS-Construction-Management-Prozess Optimizing

15 KS-Real-FM; Facility Management, Virtually controlled property management and maintenance

16 KS-Specialist City

Page 7: Krauck system englisch flyer

Seite 7 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 7

KS-Datawall The central clearing house for data

Architect

Specialist Planner

Building

Owner Project- Control

Construction

Company

User/ Operator

Contents - generated by all parties with

mutual dependencies

Basis for Planning, Construction

Use and Management

Planning(CAD)

Simulation of Construction

KS-Marketing

Sampling

Construction

Pre-Production

Facility Management

Safety Engineering

Maintenance

Building Automation

Administration (e.g.. SAP)

Geo-Information-Systems

Virtual Factory

Substantive

Examination

With

KS Datawall

Set Target

Stock Data

Plans

Correspondence

Protocols

Contracts, etc.

Page 8: Krauck system englisch flyer

Seite 8 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 8

KRAUCK-SYSTEMS Integration into the entire project

Advantages for the planning process

Responsibility for correct contents and

fulfillment of the tasks

Responsibility for coordinated plans of all

specialist fields

KS-Project Coordination System

KS-Logbook for transparent reporting of all incidents

CONSTRUCTION PHASE Assembly and precast plans

PLANNING PHASE Design - Approval - Marketing –

Implementation planning - Tender

OPERATION MAINTENANCE

Facility -Management

Benefits for the construction phase

Provide timely with correct plans

Accelerate all construction processes

Early precast production based on real data

Drastic reduction of resource requirements for claims

Stress-free construction progress

Cheaper building costs Enormous increase in profits

Benefits for the operation phase

First correct plans with real data

Reduction of maintenance costs

Reduce downtime by repairs

Faster reconstruction during

operation

KRAUCK-SYSTEMS – PHILOSOPHY Properly coordinated plans and marketing materials

Proper tendering documents

No resource requirements for disputes over incorrect

uncoordinated plans

Accelerated processes

Result:

No cost and time overruns

Cheaper construction costs, because elimination of Claims

Everyone benefits

OPTIMIZING OF BEGINNING

PLANNED = BUILT

Page 9: Krauck system englisch flyer

Seite 9 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 9

KS-Datawall-Plan The central clearing house for data

Original plans of

all planners

Analysis and set up with KS-coding

Set up in the KS model

1:1 site model

Automatic identification of problem areas

(collisions and guardian)

Send result of the problems to the planners

Page 10: Krauck system englisch flyer

Seite 10 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 10

KS-Datawall-Document The central clearing house for data

Integration of all text documents

(Protocols, contracts, files / telephone notes,

Beschreibugen, e-mails, letters, faxes, etc.)

Personalized ToDo lists

Collection of tasks with

deadlines to links of all associated documents

Text Analysis

Analyze and evaluate the contents of

statements about the knowledge of the

contents from our KS-Model and its

impact on all trades

Protocol

E-Mail

Todo A

Todo B

Todo C

Todo D

Todo E

Analysis / evaluation of Statements and implications

Document your findings Assignment of tasks and appointments

Guard functions controls the fulfillment of

all requirements of the text documents in

the plan documents

Example: • Collisions • Compliance with required spacing

(width, height)

Findings from the KS-Model Guardian functions

Page 11: Krauck system englisch flyer

Seite 11 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 11

Advantages by KRAUCK SYSTEMS

Flexibility in the selection of partners

and we make sure that all required often hundreds of

specialists are coordinated and all tasks to be fulfilled in

a timely and correct way.

Independence from project type: Structural and Civil Engineering

Industrial-Plant

Automotive

Production Plant, etc.

Page 12: Krauck system englisch flyer

Seite 12 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 12

KS-Production Automization

Especially the production and precast industry was upgraded with enormous cost

with the latest computerized production machinery.

The clear objective faster and cheaper pre-production with high accuracy

Problem:

• Late faulty un-coordinated data

• Different data suppliers, CAD systems, formats, methods of operation

• No reliable data for direct injection into the production machines

• Stress in taking measurement on site and production until shortly before delivery and installation

• Joint liability by measurements on site and unrecognized deficiencies of the plans

By Krauck Systems, for the first time you have reliable plans for their preparation work and production machines. • Production on base of correct plans • No more measurements on site • Timely pre-production and logistics

Page 13: Krauck system englisch flyer

Seite 13 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 13

KS-Site Management Obtain the current project data via the PCS

About the KS-PCS the supervisor will directly be supplied with the actual and proofed plans in 2d and

3d during the construction progress benefit

• No tiresome search for right plans for all specialist fields for the respective construction progress

• Complete visibility and no missing of components

and other elements

Page 14: Krauck system englisch flyer

Seite 14 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 14

KS-Site Management Obtain the current project data via the PCS

Support the construction management for the process planning by simulation of real construction sequence!

Avoiding surprises at the construction site! Saves time by eliminating the tedious and impossible plan checks on all trades Reduction of claims management Construction schedule as planned without the usual disabilities

Complete visibility and control via the subcontractor

Page 15: Krauck system englisch flyer

Seite 15 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 15

KS-References Worldwide unique References in Conflict-Free Engineering

KRAUCK-SYSTEMS offers regardless of the type of project,

the world's only solution, and an international reputation for

Conflict-Free Engineering.

Over 25 years experience

Over 10 Mio. m² floor area

Page 16: Krauck system englisch flyer

Seite 16 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 16

KS-References Extracts from some projects

Page 17: Krauck system englisch flyer

Seite 17 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 17

KS-References Extracts from some projects

Page 18: Krauck system englisch flyer

Seite 18 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 18

KS-References Extracts from some projects

Opernturm Frankfurt

Page 19: Krauck system englisch flyer

Seite 19 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 19

KS-References Extracts from some projects

WEST GATE Center

Craiova

Page 20: Krauck system englisch flyer

Seite 20 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 20

KS-References Extracts from some projects

Page 21: Krauck system englisch flyer

Seite 21 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 21

KS-References Extracts from some projects

Page 22: Krauck system englisch flyer

Seite 22 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 22

References

Realisation by different companies on basis of the technologies of Krauck-Systems

Page 23: Krauck system englisch flyer

Seite 23 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 23

Transparency in the interest of Principals and Investors

KRAUCK SYSTEMS

World leading company

in the holistic project management

Thank you for your attention!