Seite 1 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING
Transparency in the Interest of Builders and Investors CONFLICT-FREE ENGINEERING
WELCOME TO
Flyer
WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING
General Contractor
Seite 2 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 2
The Problem
Skyrocketing costs for Skylink
The unsolved problem
Construction cost and time overruns?
10,000 different plans!
There is a lack of matching plans
It lacks the overall organization for
the planning
ThyssenKrupp-Brasilia
Elbphilharmonie, Hamburg
Airport Berlin
Seite 3 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 3
THE CENTRAL
QUESTION:
„Why do a lot of construction projects end
up with cost explosions and time delays?“
Seite 4 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 4
The Cause
Despite the best planners, project managers, contractors and systems
11 – Fire-Extinguishing System*
13 - Ventilation*
1 - Architecture
5 – Structural Planning
10 - Sanitary *
16 – Low Voltage Current *
15 – High Voltage Current *
17 - Conveyors*
20 – Renters‘ Fitout *
19 – Building Site Facilities 4 - Frontage *
7 - Slot-/Breakthrough-Planning
18 – Building Automation
9 – Outdoor Facilities *
12 - Heating *
21 - Facility-Management
8 – Fire Prevention *
2 – Structural Work *
3 - Fitout *
14 - Coldness *
6 - Formwork-/Reinforce-Planning
* Additionally 21 main trades above
50 sub-trades possible!
Seite 5 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 5
The Solution
KRAUCK-SYSTEMS takes responsibility of
coordinated plans and leads all specialist
planners like a navigation system through the project!
11 – Fire-Extinguishing System*
13 - Ventilation*
1 - Architecture
5 – Structural Planning
10 - Sanitary *
16 – Low Voltage Current *
15 – High Voltage Current *
17 - Conveyors*
20 – Renters‘ Fitout *
19 – Building Site Facilities 4 - Frontage *
7 - Slot-/Breakthrough-Planning
18 – Building Automation
9 – Outdoor Facilities *
12 - Heating *
21 - Facility-Management
8 – Fire Prevention *
2 – Structural Work *
3 - Fitout *
14 - Coldness *
6 - Formwork-/Reinforce-Planning
• Additionally 21 main trades above
50 sub-trades possible!
Clearing by
KRAUCK SYSTEMS
Seite 6 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 6
The Invention
Krauck Systems enables this by:
Our in-house developed software and systems solutions for every phase of the project
Our unique clearing and project coordination system
KS-Systems modules for use in all project phases 1 KS-Real-Dos; Real-Data-Operating-System
2 KS-Datawall
3 KS-PCS; Projekt-Coordination-System
4 KS-Building Owner-Advisor
5 KS-Real-PM (Project-Management-Project-Controlling)
6 KS-Legal Project-Management
Claims-Management (Insurances, …) 7 KS-Quality-Control 8 KS-Marketing-Portal
9 KS-Plant-Documentation
10 KS-Logistic
11 KS-Total-Planning
12 KS-Construction Control
13 KS-Production-Automization
14 KS-Construction-Management-Prozess Optimizing
15 KS-Real-FM; Facility Management, Virtually controlled property management and maintenance
16 KS-Specialist City
Seite 7 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 7
KS-Datawall The central clearing house for data
Architect
Specialist Planner
Building
Owner Project- Control
Construction
Company
User/ Operator
Contents - generated by all parties with
mutual dependencies
Basis for Planning, Construction
Use and Management
Planning(CAD)
Simulation of Construction
KS-Marketing
Sampling
Construction
Pre-Production
Facility Management
Safety Engineering
Maintenance
Building Automation
Administration (e.g.. SAP)
Geo-Information-Systems
Virtual Factory
Substantive
Examination
With
KS Datawall
Set Target
Stock Data
Plans
Correspondence
Protocols
Contracts, etc.
Seite 8 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 8
KRAUCK-SYSTEMS Integration into the entire project
Advantages for the planning process
Responsibility for correct contents and
fulfillment of the tasks
Responsibility for coordinated plans of all
specialist fields
KS-Project Coordination System
KS-Logbook for transparent reporting of all incidents
CONSTRUCTION PHASE Assembly and precast plans
PLANNING PHASE Design - Approval - Marketing –
Implementation planning - Tender
OPERATION MAINTENANCE
Facility -Management
Benefits for the construction phase
Provide timely with correct plans
Accelerate all construction processes
Early precast production based on real data
Drastic reduction of resource requirements for claims
Stress-free construction progress
Cheaper building costs Enormous increase in profits
Benefits for the operation phase
First correct plans with real data
Reduction of maintenance costs
Reduce downtime by repairs
Faster reconstruction during
operation
KRAUCK-SYSTEMS – PHILOSOPHY Properly coordinated plans and marketing materials
Proper tendering documents
No resource requirements for disputes over incorrect
uncoordinated plans
Accelerated processes
Result:
No cost and time overruns
Cheaper construction costs, because elimination of Claims
Everyone benefits
OPTIMIZING OF BEGINNING
PLANNED = BUILT
Seite 9 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 9
KS-Datawall-Plan The central clearing house for data
Original plans of
all planners
Analysis and set up with KS-coding
Set up in the KS model
1:1 site model
Automatic identification of problem areas
(collisions and guardian)
Send result of the problems to the planners
Seite 10 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 10
KS-Datawall-Document The central clearing house for data
Integration of all text documents
(Protocols, contracts, files / telephone notes,
Beschreibugen, e-mails, letters, faxes, etc.)
Personalized ToDo lists
Collection of tasks with
deadlines to links of all associated documents
Text Analysis
Analyze and evaluate the contents of
statements about the knowledge of the
contents from our KS-Model and its
impact on all trades
Protocol
Todo A
Todo B
Todo C
Todo D
Todo E
Analysis / evaluation of Statements and implications
Document your findings Assignment of tasks and appointments
Guard functions controls the fulfillment of
all requirements of the text documents in
the plan documents
Example: • Collisions • Compliance with required spacing
(width, height)
Findings from the KS-Model Guardian functions
Seite 11 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 11
Advantages by KRAUCK SYSTEMS
Flexibility in the selection of partners
and we make sure that all required often hundreds of
specialists are coordinated and all tasks to be fulfilled in
a timely and correct way.
Independence from project type: Structural and Civil Engineering
Industrial-Plant
Automotive
Production Plant, etc.
Seite 12 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 12
KS-Production Automization
Especially the production and precast industry was upgraded with enormous cost
with the latest computerized production machinery.
The clear objective faster and cheaper pre-production with high accuracy
Problem:
• Late faulty un-coordinated data
• Different data suppliers, CAD systems, formats, methods of operation
• No reliable data for direct injection into the production machines
• Stress in taking measurement on site and production until shortly before delivery and installation
• Joint liability by measurements on site and unrecognized deficiencies of the plans
By Krauck Systems, for the first time you have reliable plans for their preparation work and production machines. • Production on base of correct plans • No more measurements on site • Timely pre-production and logistics
Seite 13 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 13
KS-Site Management Obtain the current project data via the PCS
About the KS-PCS the supervisor will directly be supplied with the actual and proofed plans in 2d and
3d during the construction progress benefit
• No tiresome search for right plans for all specialist fields for the respective construction progress
• Complete visibility and no missing of components
and other elements
Seite 14 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 14
KS-Site Management Obtain the current project data via the PCS
Support the construction management for the process planning by simulation of real construction sequence!
Avoiding surprises at the construction site! Saves time by eliminating the tedious and impossible plan checks on all trades Reduction of claims management Construction schedule as planned without the usual disabilities
Complete visibility and control via the subcontractor
Seite 15 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 15
KS-References Worldwide unique References in Conflict-Free Engineering
KRAUCK-SYSTEMS offers regardless of the type of project,
the world's only solution, and an international reputation for
Conflict-Free Engineering.
Over 25 years experience
Over 10 Mio. m² floor area
Seite 16 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 16
KS-References Extracts from some projects
Seite 17 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 17
KS-References Extracts from some projects
Seite 18 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 18
KS-References Extracts from some projects
Opernturm Frankfurt
Seite 19 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 19
KS-References Extracts from some projects
WEST GATE Center
Craiova
Seite 20 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 20
KS-References Extracts from some projects
Seite 21 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 21
KS-References Extracts from some projects
Seite 22 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 22
References
Realisation by different companies on basis of the technologies of Krauck-Systems
Seite 23 WWW.KRAUCK-SYSTEMS.COM CONFLICT-FREE ENGINEERING Page 23
Transparency in the interest of Principals and Investors
KRAUCK SYSTEMS
World leading company
in the holistic project management
Thank you for your attention!