KPI Workshop – The future of the construction industry KPIs

33
KPI Workshop – The future of the construction industry KPIs 1 February 2012

description

KPI Workshop – The future of the construction industry KPIs. 1 February 2012. Background. Constructing Excellence responsible for publication of KPIs since their inception - PowerPoint PPT Presentation

Transcript of KPI Workshop – The future of the construction industry KPIs

Page 1: KPI Workshop –  The future of the construction industry KPIs

KPI Workshop –

The future of the construction industry KPIs

1 February 2012

Page 2: KPI Workshop –  The future of the construction industry KPIs

Background

• Constructing Excellence responsible for publication of KPIs since their inception

• Department for Business brought publication and data collection together in 2009 – CE and Glenigan appointed to take forward

• Appointed to June 2012 with funding diminishing to zero

• Full review of data collection methodology and the data collected and published carried out

Page 3: KPI Workshop –  The future of the construction industry KPIs

Data collection methodology

Key changes

• Surveys now issued to all projects in Glenigan database

• Survey issued within a month of a project completing on site

• Surveys now issued electronically rather than on paper

• Separation of project and organisational surveys

Page 4: KPI Workshop –  The future of the construction industry KPIs

Data collection methodology

What this has meant

• Surveys issued to more projects has brought in more responses

• Ability to provide more granular reporting of data– By project size– By region– By sector– By procurement route

• Smoother experience for the industry

Page 5: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

Why?

• Aware that there had been parts of industry were not using the indicators as they were not fit for purpose

• Lack of alignment with other measurement regimes

• Danger of industry measuring lots of different things in lots of different ways – no ability to map trends or properly benchmark

Page 6: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIsWhat we did

• Brought together a steering group from industry:– Richard Saxon CBE Consultancy for the Built Environment– Michael Bennett Highways Agency– David Bentley Glenigan– Rob Davis Glenigan– Nick Edwards Construction News– Keith Folwell BIS– Scott Mclew NSCC– Andrew Quirke City West Housing Trust– Andrew Thomas Centre for Construction Innovation– Jane Thornback Construction Products Association– Charles Tincknell Willmott Dixon– Allan Wilén Glenigan– Jon de Souza Constructing Excellence

Page 7: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

Results

• Reintroduced product manufacturer KPIs and widened M&E measures to all sub-contractors

• Changed methods of measurement to convert as many as possible from being subjective to objective

• Introduced a small number of new measures

• Removed indicators not valued by the sector

Page 8: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New KPIs – Waste to Landfill

• To go alongside existing waste produced KPI

• % material diverted from landfill

• Both indicators now can be filtered for just:– Demolition– Construction– Both

Page 9: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New KPIs – Responsible Sourcing

• Part of Strategy for Sustainable Construction Strategy

• % of material used secured under schemes that are recognised for responsible sourcing

Page 10: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New KPIs – Organisational Carbon Performance

• To assist companies in their reporting against the Global Reporting Initiative

• Measures of:– Carbon emissions from corporate travel– Emissions from corporate offices

Page 11: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New KPIs – Project Safety

• Company safety KPI already exists

• Project-based Accident Incidence Rate (reportable accidents per 100,000 man hours)

Page 12: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New KPIs – Apprentices

• Many in the sector had already requested a KPI be developed to measure use of apprentices

• Apprentice days x £100,000 project spend

Page 13: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New KPIs – Staff Leaving Organisation

• To work alongside existing ‘Staff Turnover’ measure which calculates churn

Page 14: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

New data for comparison – BREEAM, Code for Sustainable Homes, BIM

• Three new positional questions to enable more opportunities for performance comparison

– What BREEAM level did the project achieve?– What Code level did the project achieve?– Do you think that the project used Building Information Modelling?

Page 15: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

Amended KPIs – Energy Use on Site

• Existing KPI was being tweaked by individual contractors and so no benchmarking possible. Developed in partnership with Strategic Forum for Construction

• New measure in line with ENCORD protocol and Global Reporting Initiative. Download new protocol from here: http://bit.ly/poOZ7Y

Page 16: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

Amended KPIs – Equality and Diversity

• Replaces existing subjective measure of project performance as rated by client. Developed in partnership with EHRC.

• Now objective measures of level of employment and level of senior representation within businesses across the following under-represented groups in our sector:– Women– Black and minority ethnic people– Disabled people– Those aged 25 and under– Those aged 55 and over

Page 17: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

Removed KPIs

• Range of indicators not valued or used by the sector including:– Actual project cost– Actual project time– Subjective biodiversity indicator– Subjective general environmental indicators– Selection of questions that did not contribute to KPIs!

Page 18: KPI Workshop –  The future of the construction industry KPIs

Review of the KPIs

What comes next?

• Post-project review indicators (surveys sent two years after completion)– Actual outturn cost– Predictability of energy use– Predictability of water use– Predictability of operational and maintenance costs– Level of post-project capital cost requirement

• Local labour KPI

• Anything else?

Page 19: KPI Workshop –  The future of the construction industry KPIs

Government Construction Strategy

• Data and Benchmarking Working Group – measuring the 20%

• Supplier Relationship Working Group – related to KPIs

• KPIs are one tool that Government may employ to ensure that they are getting best value from their construction spend

Page 20: KPI Workshop –  The future of the construction industry KPIs

The overall KPI score

Page 21: KPI Workshop –  The future of the construction industry KPIs

Overall KPI score – why?

• Our industry loves a score!– Considerate Constructors’– BREEAM– Code for Sustainable Homes

• Encouraging improvement– Help companies understand where they may be

weak– Identifying top performers – case studies

Page 22: KPI Workshop –  The future of the construction industry KPIs

Overall KPI score - how

• Developed with input from a major client and contractor

• Aligned with the Construction Commitments

• Approval from the Department for Business to explore

• Scoring methods for both projects and organisations

• Auditing on projects to verify scores

• Data will need to be input into the CE KPI Engine to generate a score

Page 23: KPI Workshop –  The future of the construction industry KPIs

Overall KPI score - projects

Weighting• Waste 5• Energy use - service 5• Water - service 5• Health and safety 15• Apprentice hours 3• Considerate Constructors Scheme 10• Predictability - cost 15• Predictability - time 15• Client satisfaction - service 10• Subcontractor satisfaction with payment 7• Client satisfaction - product 10

___100

Page 24: KPI Workshop –  The future of the construction industry KPIs

Overall KPI score - organisations

Weighting• Carbon 6• Health and safety 15• Equality and Diversity 3• Staff turnover 3• Training 3• Employee satisfaction 3• Qualifications and skills 3• Investors in People 4• Profitability 10

• Average of project scores 50___100

Page 25: KPI Workshop –  The future of the construction industry KPIs

Workshop

• Do you think the overall KPI score is a good idea?

• What would you do to change the way it is calculated?

Page 26: KPI Workshop –  The future of the construction industry KPIs

New services

Page 27: KPI Workshop –  The future of the construction industry KPIs

The challenge

• How to maintain the KPIs• How to ensure their independence• How to ensure that data remains anonymous• How to ensure that the data remains reflective of

the performance of the industry as a whole• How to make sure what is generated can help

drive improvement

Page 28: KPI Workshop –  The future of the construction industry KPIs

Company reporting

• Report comparing a company’s performance to that of named competitors– Would show KPI performance in a league table– Competitors would not be named in the report

• Could be generic or focussed on particular types of KPI

• Could be combined with Glenigan bidding report

Page 29: KPI Workshop –  The future of the construction industry KPIs

Auditing

• Work with a project team or organisation to provide an audit of KPI scores

• Advice on how to improve KPI data collection processes

• Post-project?

Page 30: KPI Workshop –  The future of the construction industry KPIs

Awards

• Invite the top scorers to put themselves forward for an annual set of Awards

• Award per section of the Construction Commitments:– Commitment to people– Sustainability– Health and safety– Procurement and integration– Design quality– Client leadership

Page 31: KPI Workshop –  The future of the construction industry KPIs

Best of Lists

• Opportunity to publish lists of the top projects monthly and organisations annually

• Construction News identified as a media partner

• Would seek approval from each company before they were included on such a list

• No plans to publish a full league table

Page 32: KPI Workshop –  The future of the construction industry KPIs

More delivery of existing services

• Training – In company – One to many sessions (KPI Masterclasses)

• KPI Engine system for reports and benchmarking

• Benchmarking clubs

Page 33: KPI Workshop –  The future of the construction industry KPIs

Workshop

• Would your organisation use any of the services described?

• What other performance measurement activities would you like from Constructing Excellence?