KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

12
HOTEL RESERVATION SYSTEM KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016

Transcript of KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

Page 1: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

HOTEL RESERVATION SYSTEM

KORHAN TATARHAN 20070602051

ZEKİYE DAVAS 20080601016

Page 2: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

THE AIM OF THE PROJECT The purpose of our project is

making hotel reservation system easier to use, more available for customers and hotel staff and solve possible problems during reservation.

Page 3: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

PROJECT STEPS During project, we followed

some steps in order. Every step was a preparation for the next one. We made a schedule week-by-week, and did our work according to that schedule. Thus, our project went on as we planned.

Page 4: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

PROJECT STEPS(2) Here are the steps we used in our project: General Meeting About Project Requirements Gathering Classifying Requirements(Func./Nonfunc.) Use Case Diagrams Activity Diagrams Class Diagrams System Sequence Diagrams Communication Diagrams Relationship Matrix and Presentation Review the Project

Page 5: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

If we make coding for our project, C++ would be available language for us. Because C++ is more usable anf flexible.

Also, our project is a transaction processing system. Because user is the main actor in project. For example, during a room reservation , user gives an input to the system and gets an output from the system according to input.

Page 6: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

REQUIREMENTS

Page 7: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

USE CASE DIAGRAM

Page 8: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

ACTIVITY DIAGRAM

Page 9: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

CLASS DIAGRAM

Page 10: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

SYSTEM SEQUENCE DIAGRAM

Page 11: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

COMMUNICATION DIAGRAM

Page 12: KORHAN TATARHAN 20070602051 ZEKİYE DAVAS 20080601016.

RELATIONSHIP MATRIX