KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005...

17
KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

description

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review3 Concept of Catcher System SOLUTION –Utilize Cherenkov radiation Lead and aerogel tile sandwich counter inside the beam named “Aerogel Catcher” Lead and acrylic slab sandwich counter near the beam named “Guard Counter ” aerogel mirror Cerenkov light lead sheet 5inch PMT Aerogel Catcher Module Winston-type funnel Guard Counter Concept SCOPE

Transcript of KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005...

Page 1: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

KOPIO Catcher System

RSVP Preliminary Baseline ReviewBrookhaven National Laboratory

April 6, 2005Tadashi Nomura (Kyoto U.)

Page 2: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 2

Scope of Catcher System

TASK– Detect photons passing through the beam hole– Be insensitive to a vast amount of neutrals in the beam

• In order to avoid false vetoes by beam neutrons and surviving KLs

Required photon efficiency– 99% for photons with E>300MeV

• From the spectrum of photons into the catcher after kinematical cuts (dominated by K2 odd pairing events)

Sensitivity to neutrons– <0.3% for neutrons with Ekin=800MeV

SCOPE

Page 3: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 3

Concept of Catcher System

SOLUTION– Utilize Cherenkov radiation

• Lead and aerogel tile sandwich counter inside the beamnamed “Aerogel Catcher”

• Lead and acrylic slab sandwich counter near the beamnamed “Guard Counter”

aerogel mirror

Cerenkov light

lead sheet

5inch PMTAerogel Catcher Module

Winston-type funnel

Guard CounterConcept

SCOPE

Page 4: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 4

Principle of Aerogel CatcherAEROGEL CATCHER

• Lead and aerogel tile counter• Avoid detection of slow particles

from neutron interactions

• Distributed arrangement• Coincidence along the beam

helps us catch forward only

aerogel flat mirror

Cerenkov light

lead sheet

5inch PMTModule

funnel

red: e+/e-, blue: photon

Photon’s EM shower in the module array

AEROGEL CATCHER

Page 5: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 5

Principle of Guard CounterGUARD COUNTER

• Lead and acrylic slab counter• Slow particle doesn’t emit Cherenkov light

• Utilize the total reflection anglein light transportation

• Cherenkov lights from slow particlesdon’t fulfill the total reflection condition

Photon Neutron

GUARD COUNTER

Page 6: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 6

Aerogel Counter (WBS 1.2.6.1)In-beam Pb-Aerogel Sandwich

– Module size: 30cm x 30cm– Pb converter: 2mm per layer– Number of modules: 420

• 12-21 in horizontal with beam divergence

• 25 layers along beam(8.3 X0 in total)

– Z gap between layers: 35cm– Coincidence condition

• >= 4 p.e. in 1st layer (A)• >= 2 p.e. in 2nd layer (B)

Top view

12m downstream of main detector

Beam envelope

AEROGEL CATCHER

Module

Page 7: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 7

Guard Counter (WBS 1.2.6.2)Pb-Acrylic sandwich to cover the halo region• Many soft neutrons around the beam• Lead & acrylic slab sandwich

– Size: 15cm x 15cm– 8 layers of 2mm Pb + 10mm acrylic– Read by 5 inch PMT– 3 modules along the beam– Number of modules: 144

Side View

Front View

beam

Module

GUARD COUNTER

Page 8: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 8

Expected Photon EfficiencyEXPECTED PERFORMANCE

Aerogel Catcher Efficiency

Y position dependence

99% @ 300MeV

Page 9: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 9

Efficiencies for Other NeutralsEXPECTED PERFORMANCE

Hit probability for Neutrons

0.3% @ 800MeV

Hit probability for KLs

Dominated by decays in the Catcher

Page 10: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 10

Proof of PrinciplePrototype 1 (2001-2)

– 1/4 size, flat mirror light yield

Prototype 2 (2002-3)– 1/4 size, parabolic mirror light yield response to proton

(as substitute for neutron) Check single layer eff. /

two-layers’ coincidenceGood agreement

with MC(with gas scintillation)

PT2PT1

PROOF OF PRINCIPLE

Page 11: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 11

Cost SummaryCOST

Catcher System covered by the contribution from Japan• Japan-US fund• Labor provided by

graduate students

Page 12: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 12

Costs of Key Components (1)

Aerogel tile– WBS 1.2.6.1.1.1

860 k$

Catalog price by Matsushita

Risk The price of new, transparent tiles (YI-50) not fixed yet

COST

Page 13: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 13

Costs of Key Components (2)

5 inch Photomultiplier– WBS 1.2.6.1.1.3.1

for Aerogel Catcher735 k$

– WBS 1.2.6.2.1.3.1for Guard Counter

252 k$

Catalog price with usual discount

for mass production(quoted by Hamamatsu)

COST

Page 14: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 14

Costs of Key Components (3)

Winston-type funnel– WBS 1.2.6.1.1.5

191 k$

Unofficial quotation by Vendor (Yokohama Kikou Co.Ltd.)

E-mail communication

Test ProductionDone in March

COST

Page 15: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 15

ScheduleSCHEDULE

Page 16: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 16

Schedule Summary

Schedule and Milestones (2006/07 – 2009/07)– 2006/07 – 2008/09 … Aerogel Counter (WBS 1.2.6.1)

• 2008/06/30 Aerogel tile production completed• 2007/09/27 Delivery of 420 5-inch PMTs completed• 2008/04/01 Winston-type funnel completed

– 2007/10 – 2008/09 … Guard Counter (WBS 1.2.6.2)• 2008/06/30 Delivery of 144 PMTs completed

– 2008/04 – 2009/01 … Front End Electronics (WBS 1.2.6.3)• 2009/01/30 WFD fabrication completed

– 2007/12 – 2008/12 … Shipping (WBS 1.2.6.4)– 2008/10 – 2009/04 … Installation (WBS 1.2.6.5)

• 2009/04/30 Installation completed

– 2009/06 – 2009/07 … Commissioning (WBS 1.2.6.6)

SCHEDULE

Page 17: KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)

April 6-8, 2005 Tadashi Nomura (Kyoto U.) RSVP Preliminary Baseline Review 17

Cost Profile

FY2005FY2006 178k$ 1/6 of AC PMTFY2007 1380k$

829k$551k$

5/6 of AC PMTHalf of Aerogel/optical components

FY2008 1389k$655k$421k$245k$

Half of Aerogel/optical componentsGuard CounterHalf of Front End Electronics

FY2009 204k$188k$ Half of FEE

COST & SCHEDULE