KOM 15082014 HUC

22
KICK OFF MEETING CONTRACT Title: Provision of Hook-Up and Commissioning (HUC) Services for Block PM307 Bertam Field Development Project CONTRACT No: PRJ/C/13/201

Transcript of KOM 15082014 HUC

KICK OFF MEETING

CONTRACT Title: Provision of Hook-Up and Commissioning (HUC) Services for Block PM307 Bertam Field Development Project

CONTRACT No: PRJ/C/13/201

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

Welcome to LUNDIN MALAYSIA B.V. Site Office @ Pulau

Indah Yard.

15.08.2014

BY:THHE SAFETY OFFICER

SAFETY BRIEFING

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

Project Overview

LUNDIN 75% + PCSB 25%

175km East Cost, Peninsular Malaysia

Water depth: =-/+ 76m

Medium: Crude Oil +/- 18,000 bbls per day

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

Model of WHP Jacket, Drilling DeckAnd Wellhead Access Platform

MCD : 14 May 2014

MCD : 4 Oct 2014

Model of WHP Topsides

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECTBERTAM OFFSHORE CAMPAIGN PLAN

Model of WHP Jacket, Drilling DeckAnd Wellhead Access Platform

MCD : 14 May 2014

May’14 Jun’14 Jul’14 Aug’14 Sep’14 Oct’14 Nov’14 Dec’14

27May- 09Jun

10Jun -09Jul

10Jul -13Oct (Drill & Complete 3 wells)

10Jun -09Jul

Install Jacket & Drilling Deck

Install Mooring Piles & Chain

Conductor Driving By Drilling

18Oct -22OctInstall WHP Topsides

23Oct- 04DecHook-Up & Commissioning

FPSO Upgrade @ Keppel Shipyard, Singapore

FPSO Hook-Up & Commissioning

1st Oil

7 d

Install Jumper Hoses & Umbilical

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECTBERTAM OFFSHORE CAMPAIGN – (May-Dec’14)

First Flowline Campaign on March, 2015

2nd Flowline Campaign on June, 2015

3rd Flowline Campaign on November, 2015

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

CONGRATULATIONS!!!!!

PBJV GROUP SDN.BHD.

AGENDA

INTRODUCTIONPMTCONTRACTADMINISTRATIVETECHNICAL SCOPEMARINE SPREADQAQC & HSEPROCUREMENTFINANCELOGISTICSSCHEDULE AND REPORTINGDOCUMENT CONTROLAOBEND

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

EVENT DATE

Approval from PETRONAS 11th AUGUST, 2014

LOA Issuance 14th AUGUST, 2014

KOM 15th AUGUST, 2014

Topside Sail Away 11th OCTOBER, 2014

Topside Installation 17th OCTOBER, 2014

HUC Commence 22nd OCTOBER, 2014

First Oil 1st Week DECEMBER, 2014

INTRODUCTION

PBJV to submit organization chart and CVs.

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECTPROJECT MANAGEMENT TEAM (PMT) - LMBV

Development Project Manager

Kevin Donnan

HUC EngineerMohd Anuarudin

Support• Planning: Naratius Jewit• Construction Engineer: Mustapha

Kamal• Contract Engineer: Azlee Abdul

Rahman• Procurement: Ezamuddin

Mushabuddin• Cost Control: Selvandrajah• DCC: Hairi Halib• Logistic and Material: Abdul Jalil Ngit• Structural Engineer: Rosli Mohd Taib• Mechanical/Piping Engineer: Tengku

Hazian• Instrument Engineer: Mohd Ikhsan • Electrical Engineer: Mohd Rashid

Site Material CoordinatorMohd Farid

Baharin

HUC Team LeaderNur Faridh

CONTRACT

Contracting parties: LUNDIN Malaysia B.V. (LMBV) and PBJV Group Sdn Bhd

CONTRACT Agreement Appendix 1 – Agreement for the Provision of Hook-up and Commissioning

Services

The Main Contract, the terms and conditions bearing contract number PM/PR/C/12-001.

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

ADMINISTRATIVE

Post Award Deliverables Bank Guarantee

Performance Guarantee

Certificate of Insurances

Correspondences

COMPANY Representative : Kevin Donnan

CONTRACTOR Representative : PBJV to advise

Progress Meeting.

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

TECHNICAL SCOPE Structural Scope

Installation of Walkway Support in between pre-drilling deck and cellar deck after TOPSIDE Installation c/w grating Sweep blast and painting activities. Mechanical / Piping Scope Install shiploose spools in between pre-drilling deck and cellar deck after TOPSIDE Installation Well tie-in for Production Line, Venting Line and Closed Drain Line from Wellhead to Production / Test Header. Commissioning and start-up assistance of equipment, i.e CI Skid, Pedestal Crane, Air Compressor, etc.

Electrical / Instrument Scope Installation of Lighting / JB c/w laying, glanding and termination cables at Pre-drilling deck, cellar deck, sea deck, boatlanding. This is

including commissioning at offshore. Installation of Electrical and Instrumentation Cable / Tubing Tray at Pre-drilling deck. Installation of ESP Junction Box and Laying, Glanding and Terminating ESP MV Cable from Wellhead Penetrator until ESP Transformer. Install Heat Tracing for Closed Drain Line and Production Line for shiploose spool and below pre-drilling deck. Laying, glanding and terminating Power Cables for Electrical Gantry Crane SSV/SCSSV/WV tubing from Wellhead to WHCP Chemical Injection tubing from skid to Injection point at wellhead Installation of FGS device c/w laying cable, tagging, termination and glanding from FGS unit to JB. Installation of restriction orifice, sand probes monitoring, pressure transmitter and temperature indicators c/w laying, tagging,

termination and glanding of cables from Instrument device to Junction Box. Safety Scope

Instate Life Saving Appliance, Safety Sign and Fire Fighting Equipment at all decks Commissioning Scope

Full Commisssioning of WHCP, CI Skid, Production Flowline.

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

ACCOMODATION WORK BOAT FAST CREW BOAT (FCB)ANCHOR HANDLING TUG SUPPLY (AHTS)

MARINE SPREAD

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

QA/QC AND HSE

QA/QC• Compliance with Pan Malaysia HUC Contract QA/QC requirements• Compliance with LMBV Project Completion Management System (PCMS)• Compliance with Marine Warranty Surveyor requirements• WPS/WPQT

• Advise time & venue

HSE• Compliance with Pan Malaysia HUC Contract HSE requirements• Compliance with LMBV HSE requirements• Compliance with PBJV HSE requirements• Compliance with SIMOPS procedures• Compliance with Marine Warranty Surveyor requirements

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

PROCUREMENT

Compliance to PETRONAS requirements as stipulated in Farm-in Contract.

Procurement database. Tracking Status

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

FINANCE

Invoicing address:Lundin Malaysia B.V.Level 13A, Menara HLA,3 Jalan Kia Peng,50450 Kuala Lumpur,Malaysia.Attention: Finance and Accounts Manager

Mandatory Form for invoice submission Work Order Certificate of Work Done Billing Summary Unit rate, support with original time sheet approved by LMBV reps. Cost reimbursable, original invoice with Delivery Order (DO). To attach compensation schedule. Etc

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

SCHEDULING AND REPORTING

PBJV required to submit:• Weekly Report• Monthly Report• Daily Report (Offshore and Fabrication at Onshore)• Schedule• Histogram• S-curve

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

DOCUMENT CONTROL AND FINAL DOCUMENTATION

PBJV to follow LMBV Technical Document Numbering Procedure for Bertam Project.

PBJV workscope is to as-built the affected drawings and to complete the final documentation.

LMBV will submit document template and consignee detail.

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

AOB

Interface with other Contractors: THHE (Fabricator). OGPC (Heat Tracing Contractor). TLO (Transportation and Installation Contractor). Vendors.

PROVISION OF HOOK-UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORM (WHP) for BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT