Change Request ApplicationISSUED BY NATIONAL NETWORK OPERATIONSNETWORK CONFIGURATION CR / PE TEMPLATEPE / CR Request No.Date2-May-14CircleKolkataInitiated BySANDEEP GUPTAMobile No8697826932DepartmentTechnicalType of Network ElementBTSSeverityMinor (Non Traffic Affecting)Critical (Traffic Affecting)MSC/VLRDelhiType of PE(Short Description)OTHERSMajor (Potential Traffic Affecting)MGWTG ADDITIONKolkataMinor (Non Traffic Affecting)HLRSOFT PARAMETER CHANGEROWBIf others (Provide explanation here:) PE for SPARE PARTS TESTING at DUM DUM SUBASH NAGAR (WB_NTP_kolk_080)BSCFEATURE ADDITIONTNReason for Issue of PE / CRPE for SPARE PARTS TESTING(HCPM,CMPT) at DUM DUM SUBASH NAGAR (WB_NTP_kolk_080)NoPDSNLEASE LINE UPGRADATIONRajasthanDetails of sites/ nodes on which activity to be conductedDUM DUM SUBASH NAGAR (WB_NTP_kolk_080)BTSBSC SHIFTINGRoTNBTSSYSTEM DATABASE BACKUPKeralaExisting Configuration DetailsNAYESLINEW LEASE LINE ADDITIONGujaratPlanned Configuration DetailsNOProbe ServerPRI AUGMENTATIONKarnatakaRAN-AAAHLR DATABASE CHANGEUPWProposed Date of PE / CR3-May-14Proposed Start Time0:00Proposed End Time6:00Router/SwitchSHORT CODES OPENINGEMS/ NMSPOI AUGMENTATION/ MIGRATIONOutageDuration (if any)15 MINMOP and Testing Plan availableNOInformed OEM TAC SupportNOSDHPOI DELETIONMicrowaveB NUMBER LEVEL OPENINGMaintenance window time(00:00 Hrs to 06:00 Hrs)NOSTPCHARGING CASE CHANGEIf outside Maintenance Window (Provide explanation here)GMSCSHORT CODES DELETIONINNEW PCM PROVISIONINGMTS Representative name and Mobile No.Prasenjit Paul-9143110400Vendor Representative name and Mobile No.Deepak Sinha-9674729115DG SetsPATCH IMPLEMENTATIONKeralaPower PlantE1 AUGMENTATIONAssamDate of CompletionActual Start TimeActual End TimeBattery BankBTS DATABASE DELETIONNorth EastAir-conditionerBTS PARAMETER MODIFICATIONOrissaActivity Executed By(Name & Number)Sandeep Gupta-8697826932Results VerificationEarthingHARDWARE AUGMENTATIONBihar & JharkhandIf activity failed (Reason of failure)Fire Safety SystemLAC MODIFICATIONUP EastNEIGHBOUR LIST CHANGEUP WestInformation for PE/ CR shared with other functional AreaFREQUENCY CHANGEName, Designation & Deptt. of Other Functional Area RepresentativeANTENNA CONFIGURATION CHANGECircle RF HeadEBR TO IBR BTS TYPE CONVERSIONFirst Level ApprovalSecond Level ApprovalCircle Switch HeadIBR TO EBR BTS TYPE CONVERSIONRemarks (if any)Circle Transmission HeadROUTINE B NO/ROUTING CASE CHANGECircle BSS HeadE1 SPAN DELETIONGuidelines: Planned Event / Change Request number should be identified with PE / CR followed by circle name, equipment name and consecutive number of 5 digits. e.g. PE-Kerala-MSC-00001Circle team will take approval from Head - NNO for any critical planned activity on Core Elements (MSC, MGW, HLR, BSC,LI, PDSN etc) like upgrades, updates etc.Request will be sent on "[email protected]" for approval from Head National Network Operations. Details of completion should be filled by NoC / CoC person. Subject format :/// //outage: Y/Ne.g. Rajasthan: 000492/MSC/Software Upgrade/ 31-SE-2010/00:00 to 06:00/outage: Y Records of PE / CR with complete details should be maintained (Separate record for each equipment)Information regarding "Planned Event / Change Request" (Schedule, Location, Outage & any other relevant information) needs to be sent to other functional (CSD, Sales, IT , Marketing, other) area, if required.Approval1) Activities with no outage or small outages or Non Service Affecting( Impacting up to 5 nos.of BTS) - Circle O&M head, CSD, Marketing and Sales to approve2) Major (Potential Traffic Affecting)outages (More than 5 BTS) - Circle O&M head, Circle CTO, CSD, Marketing and Sales to approve3) BSC rehoming, BSC upgrade, Loop configuration change etc- Circle CTO, Head- NNO, CSD, Marketing and Sales to Approve4) MSC, HLR Upgrade any critical (Traffic Affecting ) activity where complete MSC network getting effected etc - Circle CTO, Head- NNO, CSD, Marketing and Sales to ApproveCircle O&M HeadCircle O&M HeadNEW E1 SPAN ADDITIONCircle CTOCircle CTOMICROWAVE LOOP CONFIGURATION CHANGE TO ADD NEW SITENational O&M HeadCHANGE IN PROTECTION MODEGroup CTOREHOMING ACTIVITYHLR UPGRADENEW SOFTWARE RELEASESOFTWARE UPGRADESMUX MIGRATIONADDITION OF SS7 LINKSNEW MUX CARD ADDITIONNEW MODULE / CARD ADDITIONCARRIER ADDITIONFIRMWARE UPDATEEXPANSION ACTIVITYLOOP CONFIGURATION CHANGEOTHERS

&L&8MTS_CDMA_FR_600023_PE_CR_Rev 1.3&C &R&G&8CTO / National Network Operations&C&"Arial,Bold"MTS - Proprietary and Confidential&"Arial,Regular"This document should not be reproduced or shared in part or in entirety with anyone without written permission from issuing authority in MTS&R&P OF &NCSDMarketingSalesITOthers