Pase {
of35
||
REV.
T
OC.
NO. KOC{|P"027
PART
,|
(¿J"l.J)
å
hd
il_--¡
KUWAIT
OIL
COMPANY
(K,S.C.}
STAN
DARDS
P
U
B LICATI
OT{
KOC
STANDARD
FOR
PRESSURE
RELIEF
DEVICES:
DESIGN
AND
MATERIALS
Eloc.
No. Koc-MP-tz7
PART
I
ù
STANDARDS
TEAM
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 2/35
1
Publisl¡ed
as
XOG
Sla¡de¡d
910s/05
Task Force
(TF-MPloq
Üß9''Y"
Á
^
REII li
KOCSTANDARD
FO-R
PRESSURE
RELIEF
DEVIGES:
DESIGNAND
MATERIALS
ÐOC"
HO..
KOG,-II|P-02?'PART
1
$aprnsEnrs
cuass
ap("SECTION9 OF
KOC
3.8. /02e)
ISSUING
AUTHORITY:
STANDARDS
TCIM
r*
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 3/35
REV.
1,
age 3
of
3õ
OC.
ilO.
KOC- iJIP-027 PART I
TAFLE
OF CONTENTS
FOREWORD
1.0
SCOPE
2.0 APPLICATION
3.0
TERMINOLCIGY
3.1
lfefinitions
3.2 Abbreviations
4.0
5.0
6.0
7.0
8.0
9.0
10.0
1f.0
Paqe
No.
5
b
6
12
12
12
14
14
25
25
25
7
7
12
ENVIRONMENTAL
CONDIT¡ONS
14
HEALTH, SAFETY AND
ENVIRONMENT
15
PRD: FIJNCTIONS
AND
TYPES
oF
PRËSSURE
REL¡EF
DEVICES
l6
PRD:
DESIGN
BASIS AND TECHNICAL
REQUIREMENTS
f
6
8.1
Spring-Loaded
Pressure
Relief
Valve:
Requirements
l6
8,2 Rupture
Disk:
Requirements
19
8.3
PRV:
Griteria
and Basis
of
Selection 20
8.4
PRD: PW
for Atmospheric
and
Low
pressure
Storage
Tanks
21
8.5 PRD:
Thermal
Relief
Valves
22
8.6
lsolation
Block Valves and
Car-Seals:
Requirements
23
PRD: MATERIAL
REQUIREMENTS
24
REFERENCE
STANDARDS,
CODES
AND
SPECIFICATTONS
4.1
Conflicts
4.2
List of
Standards
and
Codes
4.3
Project
Specifications
4.4 Order
of
Precedence
GUARANTEE
& WARRANTY
10.1
Guarantee
10.2
Warranty
INSPECTION
AND TESTING
11.1
General
11.2
Material
Inspection
and
Certification
1't.3
Shop
lnspection
11.4
tluality
Plan
ll.5
AcceptabilityCriteria
25
25
25
26
26
27
r*
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 4/35
REì/¡ {:
age
4
of
35
OO;
{O.
KOC-MP.{}27
PART
I
12.0
13.0
14.0
15.0
f
6.0
QUALITY
ASSURANCE
PACKING,
MARKING
AND
DOCUMENTATION
DOCUMENTATION
14.1
General
'14.2
Ðeliverables
SPARE PARTS
&
MAINTENANGE
DATA
APPENDICES
AFPF y_plx-1
DATA SHEET: SPRING
LOADED
PRESSURE
RELIEF
VALVE
ÐATA
sHEET: PILOT-OPERATEÞ PRESSURE RELIEF
VALVE
DATA
SHEET:
RUPTURE
DISK
DEVICE
APPENDIX.2
FIGURE-1:
THE
PRESSURE-LEVEL RELATIONSHIP
FoR
PRV
FIGURE'2:
THE
PRESSURE-LEVEL
RELATIONSHIP
FoR
RUPTURE-DISK
ACKNOWLEDGEMENT
27
27
28
28
28
28
29-33
29
30
3l
32
33
34
ú
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 5/35
tt*
REV.
f
age
õ of 35
OC.
ilO. KOC-MP.027 PART I
FOREWORD
This
document
KOC
Standard
for
Pressure
Relief
Devices:
Design
and
Maierials
(KOC-MP-027
PART
1)
is
intended
to
provide
the basic
guidelines
and
minimum
technical
requirements
for design,
and
materials
of
Pressure
Relief
Devices
to be
installed on
pressure
vessels,
pressure
equipments,
pressurized
systems, atmospheric
and
low
pressure
storage
tanks, and
pipelines/piping
throughout KOC
facilities
and
installations.
This Standard
has
been
approved by
the
Standards
ïeam,
in consultation
with the
Standards
Technical Committee
(STC)
for
use
and application
throughout
the corporate
engineering
and
operationaf
functions
of
Kuwait
OilCompany.
This Standard
sets out
to achieve
the
following objectives:
>
To
specify
the
minimum
technical
requirements
for
design, and
material
selection
of Pressure Relief
Devìces
that
have applicability ìn
KOC installations and
facilities
with a view
to
achieve
quality,
reliability,
efficiency
and
performance,
as
well
as
cost
effecti'¡e a
pproach.
requirements
of Pressure
Relief Devices
so as to minimize
the
need for technical
clarifications
and
disputes.
personnel
and
environment
as
established
by
KOC Fire and Safety
Regulation,
Health, Safety
and
Environment
Managernent
System
(HSEMS)
and the
HSE
Policy.
Feedback,
comments
or suggestions,
derived from the
applicatìon
of
this
Standard
at
any
stage
of
design,
material
selection,
purchase.
manufacture,
field installation,
operation,
and maintenance
are encouraged,
and
should
be
directed to:
The
Team
Leader Standards
(Chairman,
Standards
Technical
Committee)
lndustrial
Services
Group,
KOC
P. O.
Box 9758,
Ahmad¡ 61008,
State of
Kuwait
Task
Fo
Resoonsible for This
Standard
The
Standards
Technical
Committee
(STC)
has
entrusted
the
preparation
of
this
Standard
to
the Task
Force No.
(TF-MP/07)
consisting
of
the
following:
Mr,
Mirza
Mohsin
Mr. Raj
Maharaj
Mr.
Adnan
Bohammed
Mr.
Yousef
M.
Zaman
Mr.
Nawaf
Al-Shehab
Mr.
Mohammed
Al-Ajmi
Standards
Team
Major
Projects
Team
Design
Team
Opns.
Tech.
Svcs.
(SK)
Opns.
Tech. Svcs.
(NK)
Opns.
Tech, Svcs,
(WK)
TF Leader
& Author
Member
Member
Member
Member
Ex: 61371
Ex:
66975
Ex:61815
Ex'.22241
Ex
23437
Ëx:
20336
r+
M
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 6/35
This
standard
specifÍes
the
minimum
technical
requirements
for
Design
and
Materials
of
Pressure
Relief
Devices
intended
to be
installed
on
pressure
vessels,
pressure
equipments,
pressure
systems, atmospheric
and
low
pressure
storage
tanks,
and
pipelines
I
plant
piping
with
stranded
liquids,
in
KOC
onshore
facilities
and
installations.
Any
project
specÍfic requirement
shall
be
further elaborated
and
described
in
detail
in
KOC
Data
Sheet
(Appendix-1)
and/or
Purchase
Document.
2.0
APPLTCAIION
2.1
The
Pressure
Relief
Devices
(Pressure
Relief
Valve,
and
Rupture
disk)
covered
in
this
Standard
are
intended
for unfired
pressure
vessels
(except
steam boilers),
pressure
equiprnent,
and
pressure
systems
whose
operating
pressure
is
103.4
kPa (15
psig)
or
greater.
1.0 scoPE
1,1
1.2
2.?
2.3
2.4
The
Pressure
Relief
Devices
(Pressure
Vacuum
Valve)
covered
in thís
Standard are intended for
atmospheric
and low
pressure
storage
tanks
designed
to
operate
from vacuum
through
103,4
kPa
(15
psig).
The
Pressure Relief Devices
(Thermal
Relief Valve)
covered
in
this
Standard
are
intended
for relief
of
the
stranded liquids
due
to
thermal expansion in the
tightly
closed
pipelines
and
plant
piping.
The
PRD covered
in this
Standard
are
intended
to
protect unfired
pressure
vessels,
equìpments
and
pressure
systems
including
atmospheric
and low
pressure
storage
tanks
against
overpressure during
normal
operating
and
emergency conditions
such
as fire
contingencies.
2.5
The
PRD
covered
in
this
Standard
are not intended
to
protect pressure
vessels,
pressure
equipments,
pressurized
systems,
and atmospheric
and low
pressure
storage
tanks,
and
piping
from
structural damage
or
mechanical
failure
rvhen such items
are
exposed
to
extremely high
temperatures
such
as
during a
fire.
2.6
This
Standard
does not
cover the
U-type blow
out
wet
[egs,
the surface-safety-
valve,
the
subsurface-safety-valve and the pressure relief devices installed
on
drilling
rigs
and its
associated
equipment and
vessels
etc.
2.7
This
Standard
does
not
cover thermal
relief
valve
of less
lhan
To
in.
size
2.8
The
PRD
covered
in
this
Standard
are not intended
for
use on
pressure
vessels
that are
used
for
transportation
of liquid
hydrocarbon in bulk
on
the
roads.
(/*
<r
ri'
Õ
g-
REV.
1
age
6
of
3$
OC.
NO. KOC-MP-O?T PART Í
n
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 7/35
É
C)
q
REV.
I
age
7
of
35:
OC.
HO. KOC.MP{2?
PART
f
3.0
TERMINOLOGJ
3.1
Def,nillons
For
the
purpose
of
this
Standard
the
following
definitions
shall
apply.
However
for
additionaldetails
refer
to APt
520 and
API 576:
3.1.1
Accumulation
Accumulation
is
the
pressure
increase over
the maximum
allowable
working
pressure
of the vessel during
discharge through
the
pressure
relief
valve,
expressed
as
a
percentage
of
that
pressure,
or actual
pressure
units.
3,1.2
Back Pressure
This
is
the
pressure
due
to
the
combined effect of superimposed
and
built-up
back
pressure
in
the
discharge
side of
the valve.
Superimposed
back
pressure
is the static
pressure
in the
discharge
header
before
the
safety
relief
valve
opens.
b)
ConstantSuperimposedBackpressure
This
type
of
back
pressure
remains
essentially
at
a
fixed
value
(constant)
and exists
(superimposed) continuously
prior
to
and during
opening of
the valve.
c)
\/ariable
Supqrimposed
Backpressure
Ihis type of back
pressure
varies
or
changes over
a range
from
a
minimum
to
a maximum,
or
vice versa,
The
actual
back
pressure
at
any
specific time depends
on
conditions
in the
píping
system
to
which
the
outlet
of
the
valve
ís
connected,
3.1.3
Blowdown
Blowdown
is
the
difference between
set
pressure
and
reseating
(closing)
pressure
of
a
pressure
relief
valve,
expressed
as
a
percentage
of
the
set
pressure,
or in
actual
pressure
units.
3.1.4
Built-up Back
Pressure
Built-up
back
pressure
is
the
pressure
which develops
at
the valve outlet
as
a
result of
flow through
the
valve, after the
pressure
relief
valve has
opened.
rl
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 8/35
Page I
of
35
OC.
ñtO.
KOC-MP-027 PART I
REV.
I
3.1.5
Car
Seal
A
self-locking
seal
intended
for
sealing
or
locking
the isolation
block
valves
installeC
with
pressure
relief
valves
assembly. When
Car-Seal
is
placed
in
position
and
closed,
it
locks
perfectly
and securely and can not be opened
or
removed
unless
cut
with
the
wire
cutter
or
physically
broken
intentionally
in
order to be
removed.
3.1.6
Closing Pressure
The closing
pressure
is
the
point
at which the
pressure
relief
valve
recloses.
This
signifies
the
value of decreasing
inlet
static
pressure
at which
the valve
disc
re-establishes
contact
with the
seat
or at
which lift
becomes
zero,
as
determined
by seeing, feeling
or hearing.
3.1.7
Cold
Differential
Test Pressure
(CDÏP)
Cold
differential test
pressure
is the set
pressure
at
which
the
valve
is
adjusted to
open on
the
test stand.
This
pressure
includes
the
corrections for
back
pressure
and/or temperature and
service conditions.
3.1.8
Conventional
Safety Relief Valve
A
conventional
safety
relief valve
is a
direct
spring
loaded
pressure
relief
valve
whose
operational
characteristics
i.e.
opening
pressure,
closing
pressure,
and
relieving
capacÌty
are directly
affected
by changes
in
the
back
pressure.
3.1
.9
Flutter
Flutter
is the
abnormal,
rapid
reciprocating
motion
of the movable
parts
in
which
the
disc
does
not fully sit
on the seat
of
a
valve.
3.1
.10
Leak-Test
Pressure
It
is the specified
inlet
static
pressure
at
which the seat-leak
test is
performed
3.1.11
Lift
Lift
is
tre
actual travel
of
the disc
away
from the closed
position
when a
valve
is
relìer¡ing,
3,1.12
KOC
Controlling
Team
Any
Kr)C
Team
authorized
to initiate
a request
for
procurement
of
material
ndlor
equipment
for KOC,
or
any KOC
Team
that commands
and/or
manages
and/or
controls
and/or
executes
a
KOC
project.
rþ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 9/35
DOc. NO. KOC{t¡lP{t27
PARÎ
I
REV.
l
age
I
of
35
3,1.13
Manufacturer
i
Vendor
The
Manufacturer
or
Vendor is the
original equipment manufacturer or
its
authorized
company
responsible
to
deliver
/ supply the equipment and
on
whom tre
KOC
places
the
purchase
order.
3.1.14
Maximum
Allowable Working
Pressure
(MAWP)
The maximum
allowable working
pressure
is the
maximum
gauge
pressure
permissible
at the
top of
a
complete
vessel
in
its normal
operating
position
at
the designated
coincident
temperature
specified
for
that
pressure.
A
vessel
may
not
be
operated
above
this
pressure
at any
metal temperature
other
than
that
used
in
its
design.
Consequently,
for
that
metal
temperature,
it
is
the
highest pressure
at
which the
pressure relief
valve
is
set to
open.
3.1.15
Maximum
Operating
Pressure
(MOP)
The
maximum
operating
pressure
is the
gauge pressure
which
is
expected
or
anticipated
during
the
operation
of
a
pressure
system
or
the
vessel or
equipment.
3.1,16
Non-reclosing
Pressure
Relief
Device
3.1
.17
3.1
.18
A
pressure
relief device,
which
remains open
after operation and
does
not
reclose itself
unless
manually
reset
or
replaced.
Rupture
disk is
an
example
of
Non-reclosing
device,
Opening
Pressure
The
value
of
the
increasing
inlet
static
pressure
at
which
there
is a
measurable
lift of
the
disk
or at which
the
discharge of
the
fluid
becomes
continuous
as
determined
by
seeing,
feeling,
or
hearing
Operating
Pressure
The
ooerating
pressure is
the
gauge
pressure
to which
the
vessel
or
equipnrent
is
normally
subjected
during
service.
3.1
.1
9
Overpressure
Overpressure
is
a
pressure
increase
over
the
set
pressure
of
the
pressure
relieivalve.
Overpressure
is
similar
to accumulation
when
the
relieving
device
is
set
at the
maximum
allowable
working
pressure of
the vessel.
The
overpressure
is
generally expressed
as
a
percentage
of
set
pressure
or
in
pressure units.
rl,
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 10/35
Ðoc.
No.
Koc-MP-027
PART l
REV. I
age
f0
of
35
3,1.20
Pressure-Relief
Valve
(PRV)
A
pressure
relief
valve
is
a
pressure-relief
device
designed
to
open
and
relieve
excess
pressure
and
to
reclose and
prevent
further
flow
of
fluid
after
norrnal
conditions have
been
restored.
A
pressure-relief
valve opens when
its
upstream
pressure
reaches
the
opening
pressure.
lt
then
allows the fluid
to
flow
until
its
upstream
pressure
falls
to
the
closing
pressure.
lt then
closes
preventing
any
further
flow.
Examples
of
specific
types
of
pressure-relief
valve
include Safety
Valve,
Relief-valve, Conventional
Safety
Relief Valve,
Balanced
Safety
ìelief
Valve,
and
Pilot-operated
Pressure-relief
Valve.
3.1.21
Pressu e-Relief
Device
(PRÐ)
The Pressure Relief
Device
comprises
of
the Pressure
Relief
Valve, the
Relief
Valve,
t.he
Safety
Relief
Valve,
the
Safety
Valve, and
the
Rupture
Disk
etc. As
such the
PRD could
be any
of
the
above
device
intended
to
protect
the
pressure
vessels, equ[pment
and
personnel
by
automatically
opening
at
predetermined
pressures
and
preventing
the
destructive consequences
due
to
excess
ve
pressures.
3.1.22
Pressu, e
Vacuum
Valve
(PW)
A
weight
loaded, spring-loaded
valve,
used
to relieve excess
pressure
and /or
vacuum
that
has developed
in an atmospheric
or
low
pressure
storage
tank.
3.1.?3
Rated
Capacity
Rated
:apacity
is the
percentage
of
rneasured
flow
at
an
authorized
percent
overpressure
permitted
by the applicable
code.
Rated capacity
is
generally
expres::ed
in
kilograms
per
hour
(kg/hr)
or
pounds
per
hour
(lbslhr)
for
Vapours.
For
gases
it is
expressed
in normal
cubic
meters
per
minute
(NCM/rnin)
or
mtlmin
or standard
cubic
feet
per
minute
(SCFM),
and
for
liquids
ín
litres
per
minute
(L/min) or
gallons per
minute
(GPM),
3.1.24
Relief
t/alve
(RV)
A
relief
valve
is
a
spring loaded
pressure relief
valve actuated
by
the
static
pressu-e
upstream
of
the
valve and
it
opens
normally
in
proportion
to
the
pressure increase
over the
opening pressure.
A
relief valve begins
to
open
when
ihe
static inlet
pressure reaches
set
pressure.
As the
static
inlet
pressure overcomes
the
spring
force,
the
disk
begins
to
lift
off
the
seat,
allowing
flow
of the
liquid.
The
value
of the
closing
pressure
is less than that
of
the
set
pressure and will
be reached
after
the blowdown
phase
is
completed,
Relief
valves
are normally
used
for incompressible
fluids i,e.
liquids.
¡l
rl,
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 11/35
q
ll_
ü
Þ
r-
REV.
I
age
1l
of35
OC.
NO.
KOC.MP.Oz?
PART
I
3.1.25
RelievingConditions
It
indìcates the ìnlet
pressure
and the temperature
of
a
pressure
relief
device
during
ån
overpressure condition. The relieving
pressure
is equal
to the valve
set
pressure
(or
rupture
disk
burst
pressure) plus
the overpressure.
3.1.26
Safety
lelief
Valve (SRV)
A
safety-relief
valve
is a
spring-loaded
pressure
relief valve
that
may be
used
as
eìther
a
safety
valve
(intended
for
incompressible
fluids)
or
relief
valve
(intended
for compressible
fluids)
depending on the application.
A
safety
relief
valve
is an
automatic
pressure-relieving
device
which
may
be used
as
either
a
safety
or relief valve depending
upon application.
3
1.27
Safety
Valve
(SVJ
A
safety
valve
is
a
spring
loaded
pressure-relief
valve
that
ìs actuated
by
the
static
pressure upstream of
the
valve and
characterized
by
rapid
opening
or
pop
action.
When the static
inlet
pressure
reaches
the set
pressure
it
will
increase
the
pressure
ìn
the huddling
chamber and
overcome
the spring force
on
the
disk.
This
will
cause
the disk to
lift
and
provide
full
opening
at
minimal
overpressure.
A
safety
valve
is
normally
intended
for
compressible
fluids
such
as
gas,
air
or
vapor
etc.
3,1.28
Seat Tightness
Pressure
Seat
tightness pressure
is
the
specified
inlet static
pressure
at
which
a
quantitàtrve
seat
leakage
test
is
performed
in
accordance
with
a
standard
procedure,
3.1.29
Set Pressure
Set
pressure
is the
gauge
pressure
at the
valve
inlet,
for
which
the
safety
relief
valve has
been set
to
open
under service
conditions,
ln liquid
service,
set
pressure
is
determined
by
the
inlet
pressure
at
which the
valve
starts
to
disc'harge.
ln
gas
or
Vapour
service,
the
set
pressure
is determined
by
the
lnlet
pressure
at
which
the
valve
pops.
3.1
30
Simmer
Simmer
is characterized
by the audible
passage
of a
gas
or
vapor
across
the
seating
surfaces
just
prior
to
pop .
The
difference
between
this
start
to
open
pressu-re
and
the
set
pressure
is
simrner,
and
is
generally
expressed
as
a
percentage
of
set
Pressure.
nþ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 12/35
3.2
Ahbrqviations
HSE
HSEMS
ITP
KOC
MAWP
MOP
PIM
PRD
PRV
PW
Health,
Safety
and
Environment
Health,
Safety & Environment
Management System
lnspection
and Test
Plan
Kuwait
Oil
Company
(K.S.C.)
Maximum
Allowable Working
Pressure
Maximurn
Operating Pressure
Pre-l
nspection
Meeting
Pressure Relief
Devices
Pressure Relief
Valve
Pressure
Vacuum
Valve
4.0
REFERENCE.ST.ANDARÐS.CODESANDSPECIFICATIONS
4.1
Conflicts
ln
the event
of
a conflict
between this Standard and
the standards and
codes
or
specifications
referenced herein, or
purchase
or contractual
requirements,
the
sukject
shall be brought
to the
attention
of KOC
Controlling
Team for
review,
consideration,
and resolution
or
amendment
by
Standards
Team,
if
requìred.
4.2 Lislof
Standards
and
Cgdes
The latest edition
of
the
following standards,
codes and
specifications
shall
apply:
4.2.1 National I
lnternational
Standards
API Sto
510
Pressure
Vessel
lnspection
Code-Maintenance
lnspection,
Rating,
Repair, and
Alteratìon
API
RP
520
Part
I
and
tl
API
RP
521
APt
Srd
526
API Std
527
API RF
576
API
RF,57B
Sizing,
Selection,
and lnstallation
of
Pressure
Relieving
Devices
in Refineries:
Part
I
-
Sizing and
Selection
Part
ll-
lnstallation
Guide
for
Pressure-Relieving
and
Depressurising
Systems
Flanged
Steel
Pressure
Relief Valve
Seat
Tightness of
Pressure Relief
Valve
lnspection
of Pressure
Relieving
Devices
Material Verification
Program
for
New
and
Existing
Alloy
Pìping
Systems
Pago 12 of35
OC.
fi¡O.
KOC-MP-027
PART
,|'
REV.
{
q l
*
rl,
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 13/35
Þ
,r
REì/.I
ago
f3
of 35
oc.
Ho. Koc-MP{2r
PART
t
4.2.2
API Stc
2000
ASMË
:3ec.
Vlll
Division
1
ASME 816.5
ASME
i331.3
ASME
Ì]TC
25.2001
BS
EN
ISO 4126
(Part
1-7)
BS
ISC 6264
BS
PD 5304
tsCI
9000
tso
9031
NACE MR 0175
/
ìSO 15156 Part 1-3
osHA
1910.219
KOC
Standards/RP
KOC-G-002
KOC-C-007
KOC-C;-009
Venting
Atmospheric
and
Low-Pressure
Storage
Tanks
Boiler
and
Pressure
Vessel
Code
Pipe
Flanges
and
Flanged Fittings
NPS
Through
NPS
24
Process Piping
Pressure
Relief Devices: Performance
Test
Codes
Safety Devices
for
Protection
Against
Excessive
Pressure
Hydraulic
Fluid
Power-Pressure
Relief
Valves-
Mounting
Surfaces
Safe
Use of Machinery
\
Quality
Management
Systerns
-
Fundamentals
and
Vocabulary
Quality
Management
Systems
-
Requirements
Petroleum
and
Natural
Gas
lndustries.
Materials
for Use in
H2S-Containing Environrnents
in
Oil
and
Gas
Production
Part 1:
General
Principles for
Selection
of
Cracking-Resistant Materials
-
Part
2:
Cracking Resistant
Carbon
and
Low
Alloy
Steefs,
and
the
Use of
Cast lrons -
Part
3: Cracking-
Resistant CRA
(Corrosion-Resistant
Alloys)
and
Other
Alloys
Mechanical
Power
Transmission Apparatus
KOC
Standard
for
Hazardous Area
Classification
KOC Standard for
Basic
Design Data
KOC Standard for
Spare Parts and
Maintenance
Data
KOC
Standard
for lnstrumentation
and
Control
System
Design
d.
KOC-t-001
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 14/35
tL
*
Þ
Pago 14 of 35
oc. No.
Koc-MP{}z7
PART
I
REV.1
KOC-M)-t27
Part
2
KOC
Recommended
Practice for Pressure
Relief
Devices:
Sizing,
Selection, Twinning,
and
lnstallation
381t02t01
KOC
Recommended
Practice
for
Selection,
Qualification
and
Utilization
of
Third
Party
lnspection
Services
KOC-H$E Document
KOC Fire and Safety Regulations
(Latest)
4.3
PJqiect
Speg -ficatigns
ln
additlon
to the
KOC Standards and
Recommended
Practices
referenced
in
clause 4.2.2 above,
the KOC Controlling
Teams shall designate other
relevant
specificatìons
if required,
for the
titles
listed
below:
Title/Description
a)
General lnstruments
b)
Recommended
Practice
for
lnspection
and Testing
of
New
Equipment
4.4
Order
of
Precedence
4.4.1 The
supply
of
equipment,
materials,
services
and
documentation
shall be
in
accordernce
with
the
State and local
regulations,
Data Sheets
or
Purchase
Order
requirements
of
specífic
project.
Should any
conflict
exist
between
the
listed
dr:cuments,
then
the
most stringent shall govern.
ln
case further
clarifications
are
required,
the
subject
shall
be
brought
to
the
attention
of
KOC
Controlling
Team in
accordance
with
clause 4.1 of
this RP.
4.4.2
4.4,3
in
general
the
following
sequence
of
precedence
shall apply
a)
l(uwait
Government's
Rules
and
Regulations'
b)
KOC Project
Data Sheets
and
drawings.
c)
KOC
Purchase
order
and
specifications.
d)
''his
KOC
Standard
(KOC-MP-027 Paft1)'
e)
|,lanufacturer's
/
Vendor's
standards
and specifications
5.0
ENVIRO
NMENTAL CONDITIONS
5.1
The
environmental
conditions
in
Kuwait
are
severe. Refer
to'KOC Standard
for
Basic
Design
Data"
(KOC-G-007), which
provides
the
basrc
information
requireC
for
deiign
such as
the
ternperature,
wind,
environmental,
site
and
utility s.rpply
conditions
prevailing
throughout
the
Koc
facilities.
The Fressure
Re
Standard
shall
be
lief
Device(s)
(including components)
covered
in
this
continuous
operation
in
the
environmental
5.2
conditir:ns
specified
tu
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 15/35
6.0
HEALTHT
SAFETY
AND
ENVIRONMENT
All
applicable
safety requirements
of
Occupational
Safety
and
Health
Administration
(OSHA)
Standard
1910.219
and BS PÐ
5304
shall
be
considered
in the
design,
manufacture,
ând assembly
of
the
equipment
covered
by this
Standard.
The
ManufacturerA/endor/Contractor
shall comply
with
KOC
Fire and Safety
Regulations
arìd
'KOC
Health,
Safety & Environment
Management System
(HSEMS)
requirements
for the
protection
of
KOC
personnel,
adjacent
equipment,
property,
and the
environment during
the
design,
manufacture,
assembly
or
operation
and
maintenance
of
all
equipments
and
accessories
covered
by this
Standard.
6.1
6.2
I
rl'
I
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 16/35
qì-
tL
t
.,.:
*
;l-
,:
REV.
f
age
16
of
35
OC. NO. KOC.MP.Oz7
PART f
7.0
7.1
7.2
7.3
8.0
8.1
8.1
.1
8.1,2
8.1.3
8.1.4
8.1.5
PßP: IUNGTIONS
AND
WPES
OF
PRESÇURE
F.ELIEF
DEVICES
ln
all
pressurized
systems, the overpressure
relief can
be achieved with
a
variety
of
mechanisms which
include
pressure
relief valves,
rupture disks
or
a
combination
of
the
two devices.
The
types
of
Pressure
Relief
Devices
(PRD)
are
described
as under;
a)
,Spring-Loaded
Pressure
Relief
Valve
(PRV)
i)
ConventionalType
ii) Bellows Type
iii)
Balanced Bellows
Type
(with
Auxiliary Balancing Piston)
b)
Pilot-Operated
Pressure Relief
Valve
c)
Rupture
Disk
For
additional
details
and
characteristics
of
PRD
refer
to
Appendix-3 and
Appendix-4
of KOC-MP-027
Part2.
PRD: DESIGN BASIS
AND
TECHNICAL REQUIREMENTS
Spri
ng
-Loaded Pressu re
Relief
Valve :
Req
u
i
rements
The KOC
should indicate
andior
mark as
applicable,
based on
specific
project
requìrenents,
items such
as
type,
service/process conditions,
materials,
accesscries
etc
in
the
relevant
KOC
Data Sheet
(Appendix-l).
The
design,
manufacturing,
pressure
setting,
code
symbol
stamping,
certification,
marking,
and
other requirements
of
Pressure
Relief
Valves
shall
be
strictly
in
accordance
with
the
applicable
rules
and
requirements
of
the
latest
A,SME
Section
Vlll
Division
1
and this
KOC Standard.
The
performance
testing
of
the
Pressure
Relief
Valves
shall
be in accordance
with lat=st ASME
PTC
25-200'1
Performance
Test Codes.
The
Pressure
Relief
Valve
intended
for
pressure vessels,
equipments,
or
pressurized
systems shall
be
Direct
Sprìng-Loaded
Type,
No
other
type
of
pressure
relief
vaive
including
Pilot-Operated
PRV
shall
be
used on
any
pressure
vessel,
pressure
equipment,
or
pressure
system.
The
sizing
of
the
Pressure
Relief
Valve
shall conform to the
procedures
and
requirements
as
specified
in API
520
Partl
The Manufacturer
/
Ven
requirements
for
PRV,
as
specified
in ASME
Sectio
API 525, and
API
527.
dor shall
also abide
by the following
additional
described
below,
in addìtion to
the
requirements
as
n
Vlll
Div.1,
ASME
PTC
25-2A01,
API
520
Part
1,
8 1.6
d.
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 17/35
REV.
f
age
l7
of
35
CIc.
No.
Koc-MP.027
PART I
8.1.7
8.1.8
8.1
.9
B.1 .10
B,1.14
B.1
.15
The
inlet and outlet
flanges facing
and
dimensions shall
be
in
accordance
with
ASMË
B 16.5.
8.1
.1
1 The minimum slzes
of
the flanged Pressure
Relief
Valve shall
not be
less
than
as
follows:
a)
nlet flange
size
25mm
(1
in,)
b)
Cutlet
flange
size
50
mm
(2
in.)
8.1.12
Flanged{ype
PRV
of
size
smaller
than
specified above and
without
ASMË
certification
or A$ME code
stamp
may be
allowed
if essential,
and
only for
certain
select
installations,
provided
its
requirement
is reviewed and
approved
in
writir,g
by
KOC.
8.1.13
The minimum
required effective
orifice
area
of
PRV shall
be
determined in
accordance
with
API
RP
520
Part 1, and the
standard
orifice
area
of the
PRV
shall
be
selected from
the
Table
in API
526.
All
Pressure
Relief
Valves
(threaded
or
flanged)
shall be
starnped with
ASME
Code
JV'Stamp.
The
mirimum
size of the
threaded
Pressure
Relief
Valve
shall
not be less than
as
given
below:
a)
lnlet
size
15
mm
(1l2in.)
b)
Outlet
size
20
mm
(3/4
ìn.)
The
flanged-type Pressure
Relief
Valve
shall be in accordance
with
API
526
The
PRV
inlet
and
outlet flanges
type
and
ratings
shall
comply
with the
applicable
requirements
of
KOC Piping Material
Classes.
The
in et and
outlet
pressure
limits
of
the PRV
shall
be
governed
by the
pressure-temperature
ratings
of
its
inlet and outlet
flanges
or
by
the
Manuf¿rcturer's
design
limits
whichever
is lower,
However
the
ManufacturerA/endor
shall
ensure
that the
minirnum
pressure-temperature
ratings
of
PRV inlet and outlet flanges shall
be
according
to
the
applicable
requirements
of KOC
Piping Material
Classes.
The
manufacturing
tolerances
of spring
loaded
PRV
with
ínlet size
4
inches
and
below
shall
be
wjthin t'1.5Bmm
(1/16
in.), and
for
inlet
size
over4
inches
shall
be t
3,17mm
(1/B
in.),
The
pressure
vessels
and
equipments
that
are
to
operate
completely
filled with
liquid shall
be
protected
with
pressure
relief
valve
designed
for
liquid
service or
B,'1,16
The
centre{o-face
dimensions
of the
PRV
shall
be in
accordance
with
Tables
2
to
Table-15
of API
526.
8.1.17
8.1
.18
as
required
by
KOC
,1
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 18/35
REV.
l
age
l8
of
35
oc.
r,¡o. Koc-MP4.27
PART
I
8.1 .19
8.1 .20
8.1.21
8,1.22
B.1
.25
8.1
,26
8.1,27
B,1.28
8.1.29
8.1.23
The space between
a
rupture
disk
device
and
a
pressure
relief
valve
shall
be
provided
with a
pressure
gage,
a
trycock,
a
free vent,
or suitable
telltale
indicator
in
such a
way that
it
shail
permits
detection
of disk rupture
or the
leakage.
8.1,24
The seat
tightness
of
pressure
relief
valve
shall be checked
and
carried
out
in
accordance
with the
requirements
of
API
RP
527.
The
spring
in a
pressure
relief valve
shall
not
be set
for
any
pressure
rnore
than 5 above
or
below that
for
which the valve is marked, unless
the
setting
is
within
the
spring
design
range
established
by
the valve
Manufacturer.
The
initial
adjustment
of
the
pressure
relief
valve
shall
be
done only
by
the
Manufacturer
or
his
authorized
representative,
or an
Assembler and
a data
tag
shall
be
provided
on the valve
that
shall
clearly
indicate
the
set
pressure
capacity
and date.
The
valve
shall
be
seated
with
a seal
identifying
the
Manufacturer, his
authorized
representative,
or
the Assembler
who
performed
the
adjustment.
Ïhe
sei
pressure
tolerances,
plus
or
minus, of
pressure
relief
valves
shall
not
exceed
13.8 kPa
(2
psi)
for
pressures
up
to and
including 483
kPa
(70
psí)
and 3
for pressures
above
483
kPa (70
psi),
The
marked capacity
of a
pressure
relief valve
when installed
with
a
rupture
disk
device
(rupture
disk
installed between
the
inlet
of
the
PRV and
the
vessel)
shall
be
multiplied
by
a factor
of 0.90 of
the
rated
relleving
capacity
of
the
valve
alone
or
alternatively,
the
capacity
of
such a
combination
shall
be
establisihed
in
accordance
with
ASME
Section
Vlll
Div.
1.
ln case
KOC
requires
seat
tightness
greater
than
that
specified
in API
RP
527,
it
shou:d
be
specified
ìn the KOC Data Sheet
(Appendix-1).
The
maximum
acceptable
leakage rates
through seat of
a PRV shall
be in
accordance
with Table-l
of
API
RP 527,
defined
for
pressure
relief
valves
with
set
pressure
from 103
kPa
gauge (15
psig)
to
41,379
kPa
gauge (600û
psig).
The test medium
for
determining
the
seat
tightness
i.e.
air,
steam, or
water
shall
br: the
same
as
that used for
determining the set
pressure
of
the
valve.
For
dual service
valves,
the test
medìum
such
as air,
steam, or
water
shall
be
the
sarne as the
primary
relieving medium.
For
the
Pressure-Level
Relationship
of the Pressure Relief
Valve
refer to
Figure-1
of Appendix-2
of this Standard.
The
flanged
type PRV
shall
have
integralone-piece
nozzle
The
flanged
type
PRV
with
flanges
attached
by
welding
shall
not
be
acceptable
8.1.30
8.1 .31
&
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 19/35
REV,
f
ags
l$
of 35:
OC. f.¡O.
1(OC-MP-027
PART
I
8.1.32
All
castings
for
PRV
shall be
true to form,
shall
be
free
from
shrinkage,
voids,
strains
scales,
lumps,
sandholes
and other defects
etc.
8.1.33
Lifting levers
shall
be
provided
only
on
PRV
intended
for
Air, or
Nitrogen
service.
8,1
.34 No
lifling
levers
shall
operations/service.
be
provided
on
PRV
intended
for
process
8.2
Rupture
Disk:
Bqq ¡iremenÞ
8.2.1
The
rupture
disk alone
shall not be
used
on any
pressure
vessel,
pressure
equipment, or
pressure
systems.
However
it
may
be
used only
iñ
combination
with
a
PRV
under
certain
conditions
as
mentioned
below
provided
its
use
is
absolutely,
genuinely,
and
specifir;ally
justified
and with written
approval
of
KOC:
a)
When
the
pressure
vessel
contains material that may render
PRV
or its
cornponents inoperative due to choking
or clogging,
or
8.2.2
b)
'fühere
a loss of valuable
material by
leakage
should be avoided,
or
c) Where
contamination of
the
atmosphere
by
leakage
of
noxious
fluids
rrust
be avoided,
or
d)
When very
rapid
pressure
rise
are
anticipated
or encountered
8.2.3
The
design, manufacturing,
code symbol stamping,
certification,
marking,
and
other
requirements
of
Rupture
Disk,
when
specified,
shall
be
strictly
in
accordance
with the
applicable
rules
and
requirements
of
the
latest ASME
SectiorrVlll
Division
1
and this
KOC Standard.
8.2.4
825
8.2.6
8,2.7
The
KOC
should
indicate and mark
as
applicable,
based
on specific
project
requirements,
items
such as
type,
service
and/or
process
conditions,
materierls,
accessories
etc
in
the
relevant KOC
Data Sheet
(Appendix-1).
The Manufacturer
shall ensure
that each
Rupture
Disk has been
duly marked
with
"UD"
Code
Stamp as
per
ASME
Sec.
Vlll
Div,1.
The
opening
provided
through
the
rupture
disk
shall
be sufficient to
permit
a
flow
equal
to the
capacity
of
the
PRV
and
there
shall
be no
chance of
interference
with
proper
functioning
of
the
valve in
case the rupture disk
burst.
For
the
Pressure-Level
Relationship
of
the
Rupture
Disk refer
to Figure-2
of
Appen,Jix-2
of this
Standard.
d'
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 20/35
)>
*
QT
,Í.
REV,
1
age
20
of 35
loc. No. Koc-MP-027
PART
I
8.3
8
3.1
PRV:
Criteria
and.Pasis
of Selection
PRV:
Conventional
Type
The
conventional
PRV
shall
be
used when
all
of the
following
conditions
are
met:
a) The
sum of
the
maximum
variable superimposed
back
pressure
plus
the
built-up
back
pressure
is
less
than
1
A
ú
the PRV
set
pressure.
b)
Fr:uling or
corrosive
service
conditions are not
expected
as
it may affect
the upper
part
of
the
PRV.
8.3.2
PRV.
Bellows
Type
ln case the conditions specified
in
Clause
8.2.1
(a)
and
(b)
are
not
met,
then
a
bellows
type
PRV shall
be
used under
the
following
conditions:
a)
Tlre
sum
of
the variable superintposed
back
pressure
plus
the
built-up
back
pressure
exceeds
10o/o
of
the
PRV
set
pressure
or
cold differential
set
pressure.
b)
Fouling
or
corrosive
conditions are
anticipated and
protection
cannot
be
afforded
by
using alternative
materials
or devices.
c) lf
the
service
fluid
is highly viscous or of a nature
that
it
can
enter
the
critical clearances
behveen
the guides/disc
holder.
d) lt
rs
essential
that
the bonnet of
a bellows
type
PRV
when installed,
shall
be
appropriately vented to the
atmosphere.
8.3.3
PRV:
Balanced
Bellows
Type
(with
Auxiliary
Balancing
Piston)
The
balanced
bellows
type PRV with
auxìliary
balancing
piston
shall
be
used
under the following
conditions:
a)
Back
pressure,
either
constant
or
variable
is
certainly
present
b)
Excessive pressure
may
built-up
in the
bonnet
as
a
result
of
pressure
brrild-up
in
the bonnet-vent
piping
and
as
a result
of
built-up
bonnet
pressure,
a
perilous
condition could
occur
any
moment.
c)
lt must
be
ensured
that
when
balanced bellows
type
PRV
with
auxiliary
billancing
piston
is
installed,
their
bonnets
are
appropriately
vented
to
the
atmösphere.
,e
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 21/35
RËv.1'
age 2f of35
OC.
NO.
KOC.MF-027
PART,I
8.4 PRD: F
VV
fo,r
Atmospheric
and Low
Press.ure Stora.ge_Tanks
The
Pressure
Relief Devices for
atmospheric and
low
pressure
tanks shall
be
designed
and manufactured
in accordance with
API
Std.
2000.
The
Pressure
Relief Devices
intended
for
storage tanks
designed
for low
internal
pressures
shall
be sized and
set so that
at the
rated capacity
of
the
devices,
the
internal
pressure
of each
tank under
any normal
Operating
condition
shall not exceed the
internal
design
pressure
or
the
maxirnum
design
pressure.
The
P\A/
intended use
on
atmospheric
and low
pressure
tanks
for
pressure
and var:uurn release
shall be
spring-loaded type.
The PW intended
to be installed
on
atmospheric and low
pressure
tanks shall
be
flanged
type.
The type, minimum
ratings, and class of
the
inlet
loutlet
flanges
of
the spring-
loaded
flanged
type
PW
intended
for
atmospheric
and
low
pressure
storage
tanks shall
be,
unless otherwise specified
by KOC,
ASME
B 16.5,
RF,
150
ratings,
and the
class
shall
be
as
per
the
KOC
Piping
Material
Classes.
8.4.6
Normal venting
for
pressure
and vacuum
shall be accomplished
by a
pressure
vacuunr
valve
(PW)
with
or without a
flame-arresting
device
as
required
by
KOC. The
Relief
devices equipped with
a weight and lever arrangement
shall
not be
L¡sed.
8.4.7
The PW
shall
be designed such
that
in
the event
of failure of any
of its
essent'al
parts,
the
PW shall
never
fail
to
protect
the tank
on
which
it is
installed.
841
8.4.2
8.4.3
8.4.4
8.4.5
8.4.8
8,4,9
8.4.10
8.4.1
1
PW
valves specified here
shall be
used
on atmospheric and
low
pressure
storage
tanks in
which
petroleum
or
petroleum products
are
stored.
ln
addition to
several
provisions
for
emergency venting,
such as
use of
additional
PW, or a
gauge
hatch
that
permits
the
cover
to lift
under
abnormal
internat
pressure,
a frangible
roof{o-shell
attachment,
as
described
in API
Standard
650, is
most
imperative.
The
tVlanufacturer /
Contractor
shall ensure
that the
requirements
for
a
frangible
rooËto-shell
attachment,
as specified
in
API
650,
are
strictly
followed
and
met.
The
materials
of
PW
and
its
associated
piping
shall be selected
from
the
KOC
Piping Material
Classes
based
on the
stored
product
and
the
service
conditions
to lvhich the
PW
and
its
piping
are intended
to
operate'
8.4,12
Twin
frW
shall
be
installed
on all
atmospheric
and
low
pressure
tanks
intended
for
storing
h.ydrocarbons
(sweet
or
sour)
irrespective
of size
and
pressure.
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 22/35
DOC. NO.
KOC.MP{'27
PART
T
REV.1
age
22
of
35
8.4.13
The
inlert
of
a
PW
shall be
fitted
with butterfly type isolation valves
and car-
seal.
The
isolation
valves
installed
with
pressure
vacuum
valves shall be
butterfly
type, and full-bore.
It
must
be
ensured
that
both the
twin
PW installed
on
atmospheric and
low
pressure
tanks shall be
identical in
all
respect including
size and
capacity and
pressure
setting
to help interchange
the
parts
and reduce the inventory.
For
additional details
showing installation
of
Twin
PRV, lsolation
Valves. refer
to
Figure-10,
Figure-11,
Figure-12,
Figure-13, and
Figure-16
of
Appendix-5 of
KOC-Mr-027
Parl2.
8.5
PR?:.ïhgrmal
Relief
Vglves
8,4 t4
8.4.1
5
8.4.16
8.5.1
8.5
2
8.5.3
8.5.4
The thermal
relief
valve shall
be
installed
on
all such sections
of the
pipeline
carryinç¡ liquid
hydrocarbons,
wherein the
liquid
is fully blocked
or
stranded,
and
is subjected
expansion due
to
rise
in
environment, resulting
in
the
rise of
internal
pressure
that
may
exceed
the
maximum allowable operating
pressure.
This
shall not
cover
the
expansion
of
liquids in
the
piping
or
pipelines
due
to
fire contingencies.
This shall
not
cover
insulated
or buried
piping/pipelines
which
normally
operate
at above
the ambient temperature.
The
thermal
relief
valve
shall
be instalìed
in the
following
conditions,
unless
otherwise
required
by
KOC:
a)
On
each
section
of
the
cross-country
pipelines
between
main
line
l:lock-valves,
when
the
above
ground
length
of
pipe
exceeds 1to/o
ol
the total length
of that
section.
b)
On
each section
of
above
grade
plant
piping
carrying
liquid which
is
blocked-in
or
stranded
by
tight closing
valves and blinds,
unless
the
:;um
of the
cross-sectional
flow
area of
non-blinded
,
conventional
'¡¡edge
gate
valves
exceeds
the liquid
volume
of
the
section divided
by
60
meter.
c)
3n
the
piping
in the
heat
exchanger
in which
the
liquid
is
blocked
and
reated
between
the block
valves.
On that
section
of
piping
which lies
between
the
storage
tanks, or
in the
tank
farm,
in
which the
liquid
is stranded
and
heated
between
the
block
valves.
d)
8.5.5
The
seit
Pressure
of
the
thermal
relief
valve
shall
not
exceed
110%
of
the
maximum
allowable
oSerating
pressure for
the
maximum
temPerature
during
stress,
co
shut
irr,
considering
any other
weakest
co
p
sy
stress,
flange
ratings, and
r-1
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 23/35
8
5.6
8.5.7
8.5.8
8,6.6
8.6.7
The
lor;ation of
the
thermal
relief valve
on
sections of
cross
country
pipeline
shall
be
selected
by
KOC
based
on
accessibility,
valve
safety,
and
parameters.
The
thermal
relief
valves
which
are
not located
within
a fenced
area
shall be
provided
with
suitable cover to
prevent
tampering
or
damage.
The
outlet of
thermal
relief
valve
which
releases
hydrocarbons
or
toxic
liquids/vapors
inside a
plant
area
shall
be
piped
to
a closed
piping
system.
The
isolation
valves
shall be
carefully administratively
controlled
to
achieve
maximum
safety of the equiprnent,
the
system
and
the
plant.
The
minimum
flow area
of
the
selected
isolation
block valve shall
be
equal
to
or
greater than the
inþt
area of the
pressure-relief valve.
8,5.s
The
outlet
of
thermal
relief
valve installed
on the
pipelines,
which
releases
hydrocarbons or
other
liquids/vapors
shall discharge
at
the
grade
or
as
required
by
KOC.
8.5.10
The
therrmal
relief
valve shall
not
be
less
than
3/oin.
size
8.6 lsolation Block Valves and
Car-Seals:
Reouirements
I*lFOR7',lNT
NO'lþ;:
'l'|rc:
i.sottitiot¡
ltlock
:'.r.tlvst
and lha
cur-scul.t,
tlto¡tgh no
<t
nrumleilot1'
¡rurt
eJ
this dc¡cu:nent, httt'.'cvar thc.y
ure ìilp()rt.tnl .since
tltet,
constitutc
en
essantial
gjelr?enl
ú
PRÐ
asscgr${t,.
'|.'l¡e
,Vla*¡liactttrar
/
Ilcndet
is tltt:rcfiva
¡r¿1t,r.s¿d
to uhitle
þ)'
t]rc tecl¡tt¡cul ret¡uírenents
as
.r¡.xrcif*r/
helot', in
tu.se
the isolulit¡tt hloe'k
t'alvc.s
aud <:ar-scals
ara
ortlerccl
h),
KOC'.
8.6.1
The
block valves
shall
be
used
as
isolation
valves
in combination
with
PRV
to
facilitate
in PRV
maintenance,
replacement,
or other
purposes.
8.6.2
ln
case
the
block valves
are
not
available, then
as an
alternative,
the
gate
valves
may
be
used
for isolation
purposes
provided
they are
installed
with
stems
oriented
horizontally
or
if
this
is
not
feasible then
the
stem
should
be
oriented
downward to
a
maximum of 45
degrees
from
the
horizontal
in order
to keep
the
gate
from falling
off and
blocking
the
passage
of
flow.
8.6.3 The
isolation
block valves shall
be
provided
with
appropriate
Car-Seal
Open
facility.
8,6
4
The
Car-Seal intended
to be
used
shall
be
strong enough
to
resist
any
ordinary
mechanical shock
or
blow and
shall
not
be
able
to
be
removed
when
installed in place and locked open,
unless
physically
cut
by
a
wire
cutter
or
by
forceful
hammering,
8.6.5
The isolation
block valves used
for
the
pressure
relief valves shall
be full-bore
roddable
type.
*
Þ
er
REV. l
OC.
NO,
KOC4'1P.027
PART
I
8.6.8
The
isolation
valves
to KOC
Pi
Classes
þ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 24/35
DOC.
NO.
KOC.MP.Oz?
PART
1
REV.
l
age 24 of.35
9. 1
9.2
9.3
9.4
9.5
9.0
PRD:
MATEFIAL
REQUIREMENTS
KOC should consider
the
project
specific
requirements
when
specifying the
materia¡s for
PRV
in
KOC
Data Sheet
(Appendix-1).
The
pressure-temperature
ratings
of
inlet and outlet
side
PRV materials
shall
conform
to the
requirements
of KOC
Piping Material
Classes
or
project
specific requirements
as
specified in KOC
Data
Sheet,
whichever
is
more
stringer
t.
The
materials
used in the
manufacture of PRD
(and
isolation
block
valves
if
requirecl)
shall be
suitable
for
the
sour service
and
shall satisñ7
the
requirernents
of
NACE
MR
017511SO15156.
The
ManufacturerA/endor
shall ensure that
the
materials used
in
PRD
(and
isolation
block vaìves
if
required) are
appropriate
for
the intended
service
i.e.
hydrocarbons
(Liquid
/
Gas:
sweet or sour)
or water
(produced
water,
brackish
water,
effluent
water etc.)
and it shall also conform
to
the
KOC Piping
Material
Classes.
When
the
pressure
relief
valve incorporates
bellows
and it is to
be used
in
sour service,
the
minimum
material requirement
for
bellows
shall
be
Nickel
based
irlloys
{such
as lnconel
625
(UNS
N06625),
or
Hastelloy
C-276
(UNS
N10276)),
and
it
shall
be
suitable
for
the
service conditions
and
shall
also
satisfy .he
NACE
MR0175llSO
15156
requirements
br
otherwise as
specified
in KOC Data Sheet.
9.6 The
body
and bonnet
materials
of
the
PRV
shall
be
same.
However
if
they
are
ditferent,
then
each of them
must meet
the
minimum
pressure-
temperature
requirements
of the
system.
The
mirimurn
body
and bonnet
materials
of
PRV,
if not specified
in
KOC
Data
Sheet
(Appendix-1), shall
be
equivalent
to or
better
than
the types and
grades
as sper:ified
in
API 526. However
the Manufacturer
/
Vendor
shall also ensure
that
the¡se
materials
satisfy
the
NACE
MRO175
/
ISO
15156
requirements for
sour
serrvice,
as
well
as
conform to
the
requirements
of KOC
Piping
Material
Classes.
The
Manufacturer
/
Vendor shall
ensure
that
the
PRV
trim
materials,
if
not
specified
in KOC
Data
Sheet
(Appendix-1), shall
conform
to
the
requirements
oi
ruRCe
MR0175
/ ISO
15156
for sour
service,
as well
as
Koc
Piping
Material
Classes.
The
spring
material
of the
PRV
shall
be,
if
not
specified
in
KOC
Data Sheet
(Appendix-i),
suitable
for
the
process
and
the
service
conditions
and
shall
òonfot¡ n
to
t he NACE
MR
0175
/
1SO15156
requirements
for
the
sour
service
For the
sour
service
condition,
it
should
preferably
be
nickel-based
alloy
such
as
lnconel
X750
or
equivalent
or better
or
alloy
UNS
N07750
or
N
07090.
9.7
9.8
oq
rþ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 25/35
DOC.
NO.
KOC.MP-027
PART I
REV.
f
age 25
of
35
The PRV springs
for
additional
protection
against corrosion shall be coated
if
reguirecl by KOC,
The
coating
shall
be
suitable
and
compatible
with
the
service
fluid and
the
operating
conditions.
The
ferrous materials components
of
PRV
when
used
in
sour service,
shall
have
the Yield
Strength
not
exceeding
620
MPa
(90,000 psl),
and the
hardness
not
exceeding 22 HRC.
1O.O GUARANTEE
& WARRANTY
10.1
Guarantee
All
Pre3sure
Relief Valves and their component and
parts
shall be
guaranteed
by
the
Vendor
/
Manufacturer
against defective
materials,
design and
workmanship.
10.2
llUarrang¿
The
Vendor
I
Manufacturer shall
provide
a Warranty against all
Pressure
Relief
Devices,
par1s,
and
associated component
in
accordance with
the
purchase
order or
contract documents.
11"0
INSPËCTION
AND
TESTING
11.1
General
The Vendor shall carry out
all
the KOC requirements
of
inspection and
testing
as specifìed
in
Contract document
or
Purchase
order,
9.10
9.1
1
'11.2
11.2.1
11.2,2
11.2.3
lVlaterial lnspec.tion
and
.9e4ification
Materials
of construction and
quality
of
workmanship shall
be
inspected
and
certifiecl
in accordance
with the
requirements of applicable
standards
referenced
herein
and/or
the KOC
Data
Sheet
(Appendix-1).
The Manufacturer
/
Vendor
shall
submit
to
KOC,
the
duly filled
out
KOC
Data
Sheets
for PRD
for review
and
approval.
Material
test
certificates
shall also
be
submitted
to
KOC
for review and approval
before
start
of
manufacture
and
or
assembly
of
PRD.
The
testing of
PRD materials
shall
be
carried
out by the Manufacturer
or by an
accredited
testing
laboratory approved
by
KOC-
¡. -
¿.-]
*
,þ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 26/35
NOC. NO. KOC.MP4?T
PART
1
Page 26
of
35
REV.
,|
11.3
Shop
lnspection
The
vendor shall be
responsible
for
all
required
QA/QC
and
inspection
work to
satisfy the
requirements
of
this
Standard.
KOC may
additionally employ
the
services
of inspectors,
if
deemed
necessary,
to
witness the
inspection and
testing
cf
materials
and
the equipment covered by this
Standard.
KOC
or its
appointed
inspectors
shall
be notified
a
minimum of
three
(3)
weeks
ir-advance and shall be
provided
access
to
Manufacturer s
/ Vendor s
shop(s)
during fabrication,
assembly,
inspection and testing
of
all
pieces
and
parts
of
equipment and supplíes
covered by
this
Standard.
All
inspection
shall
be
made
at
the
Manufacturer s own facilities
prior
to
shipment and shall
be
conducted
in
a
manner
as
not
to
interfere
unnecessarily
with
fabrication and
assembly
operations.
KOC
will decide
if
KOC inspector
will
be
present
at
all
times
when work
is in
progress.
11.3.4
Positive Material
[dentification
(PMI) (wherever
applicable)
of
pressure
comporents
such
as
body and
bonnets, as well
as the
trim
parts,
made
of
ferrous
or
non-ferrous
alloys,
of
the
PRV
(and
the applicable
parts
of
Rupture
Disk
if
applicable
and required) shall
be
made as
per
the
guidance
of
API
RP
578.
11.3.1
11.3.2
1
1,3.3
11.3.5
11.4
11.4.1
PMI
is
not a
part
of
a
mill certificate
and shall be
made by
the Manufacturer
at
its
mill
subject
to witnessing
by KOC
and/or its representatives
as indicated
in
the
KOC
Data Sheet
(Appendix-1),
or
purchase
documents.
9ualiïy
Plan
The
equipment
vendor shall
prepare
and
submit a detailed
quality plan
for
KOC
approval,
The
quality
plan
shall
consist of the
following:
a)
lnspection and
Test
Plan
(lTP)
The
ITP
shall
list
the
sequence
of all inspection
and testing
activities
that shall
be
carried
out
by
the
vendor
and
Koc
or
Koc
appointed
third
party.
The
plan
shall
include
fabrication,
assembly,
inspection
and
testing
and
packing
for shipment
in a
chronological
order,
showing
the
frequency
of
control,
the
acceptance
limits,
the
governing code
and
whether
a
document
or
report
is
produced
for each
activity
b)
Pre-inspection
Meeting
(PlM)
During
the PIM
the
vendor
and
KOC
will
review
and
finalize the
mark-
up
oi
the
lTP,
and
confirm
the
requirements
for
witnessing
(W)
surveillance
(S),
monitoring
(M),
and
reviewing
(R)
in
the
ptan
The
approved
quality
plan
shall
be
strictly
adhered
to
throughout
the entire
fabrication,
assembly,
inspection,
and
testing
period.
þ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 27/35
tL
Þ
r-
*
o
Acqep.tabilitv
C
[it eria
The
Manufacturer
/
Vendor
shall ensure
that
the all
Pressure Relief
Devices
supplieC
shali
meet
or
exceed the
performance
requirements
as
specified
in
ASME
;rTC-25-2001
(Performance
Test
Codes).
Each and every PRD
supplied
shall
satisfy the set
pressure
and
seat
tightness,
and
other
requirements as
specified
ín
KOC
Data
Sheet
(s).
The
Manufacturer
shall fully
ensure
that the
supplied PRD
conforms
to
the
requirements
of
this
KOC Standard,
the
codes
and
standards
referenced
herein, and are
fit
for the
purpose.
12.0
Q-UALITY
ASSURANCE
The
Manufacturerfuendor shall
operate
quality
systems
to
ensure
that
the
requirements
of
this
Standard are
achieved,
The
quality
systems
shall
be
preferably
based
on
ISO
9000
series
of
Standards and
the
Manufacturer
I
Vendor
shall
demonstrate compliance
by
providing
a
copy
of
the
accredited
Certificate and a
copy
their
quality
manual. Verification
of
Manufacturer's
/
Vendor's
quality
system
is normally
part
of
the
pre-qualification
procedure
and
is,
therefore,
not
detailed in this Standard.
13.0 PACKING,
MARKING
AND DOCUMENTATION
11,5
11.5.1
11.5.2
11.5.3
13.1
13.2
13.3
Packing,
markíng,
and
shipping
documentation
shall
comply with
the
requirements
of
KOC Standard
for
Packing,
Markìng
and
Documentation
(KOC-G-004i
ln
addilion
to
above the
Manufacturer
/ Vendor
shall
ensure
that
each
PRV
has been
duly
marked
with
UV
stamp
and
the Rupture
Disk has been
duly
marked with
UD
Stamps
as required
by this
Standard.
Further
all
other
markinç¡s
on
PRV
shall
be
as
per
the requirements
of
UG-129
of
ASMË
Sec.
Vlll
Div.1.
The
Manufacturer
I
Vendor
shall ensure that
the required
data
is
marked
on
PRV
and
Rupture
Disk in such
a
way
that
the marking shall
never
be
obliterated in
service.
The
Manufacturer
/ Vendor shall abide
by
the requirements
of
ASME
Section
Vlll
Div.1
for markings
on
PRV
and Rupture
Disks.
As
a
minimum
requirement
the
following
shall
be
marked on
the PRV.
a)
Name
of
the Manufacturer
b) Manufacturer
Design
or
Type
Number
c)
NPS
Size
d)
Set
Pressure
e)
Certified
CaPacitY
Y:ar
of
Built
ASMË
UV
Symbolor
ASME
UD
Symbol
(as
applicable)
f)
s)
REV.
I
age
27
of 35
OC.
NO.
KOC-MP{z?
PART
I
tu
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 28/35
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 29/35
Ø
PPET.TpTX-1
DATA
SHEET:
.SP.RII.IG
LOAD,E.P PRESSURE
RELIFF VALVE
(For
Additional details
refer
to
API
520 Part l)
Kuwait Oil
Company
l/
Þ
r
4
-
v
tu
q
REV.
I
age
29
of
35
oc. f-¡o. Koc- tP-027 PART
f
Vendor C¿lculations Re€ulr€d:
Yes
I
Xl
No
t
I,
7
Èlodrl
I'lumber:
1.
5.
Månufa{turer
t{êrne:
¿.
itç:
5.
O.ifirÊ
nFtirinãa¡ôn
f
ìÊt'lÉr
1. *rrtç:
4
qêlê{îed
Eft¿¿tivê ôrifire Ar
rerçure
Celfril ¡t*¡'l
('lri
flrÉ
ÂrÈâr
,
3l¡ll.¡6
A¡¡D
SÉLECTION
re
lç:
àtent Heal
0r
VaBo¡i¿elion and
un
0.
Blorvdownr Standard
I I
Orher
f
9.
a.
O¡her
t I
Ssecifvl
ûèràrlnô
Fressure and Units:
ßus
Scrsen: Y¿s I ì
ltlo
f
I
t
_
Trçt Íì;rildp:
YÉ
I I
Nr
f
I
LifiìngLev.Èr:
Pl¡lnI
lFåctèdf
l¡]oneI I
9.
equlred
Cape{lIT
per
Valve and
Unitgr
lb/hr
{,
C¿o: SirevT€dl lEÕltedf I
Âc€EftoRlEs
[.RVrCE COÍqÐÍrO¡¡t
5
tth€r
I
I
soe(itu:'
Ì
Carr filv
NÂCE MR
Ol
7ç,/lqol
q
156:
YÊç f
xl
þlù
t Ì
21
OI'¿NËCTIOì¡5.
Sålanced
Pirtrn:
8pll0w6'4.
SEfinq;
\'Taiher:
1
AdIUsl}nE
R¡ßq{E}:
õrr¡¿tê:
Rê3¡liañr SÊåt:
Sêåt
{ñ¡o¡zle}: ttçk1
ló
Bonnct:
8.
godv:
7,
MATERIÂL5,
AIVC DEIICN
Ësotur€ D,rh:
Yrsl I
¡'lol
I
Flref
lOtherf
l9oecitu:
CodtÞlv
rrelth.âPl
526: Yes
f l'
Not
I
flthlr f
I
qnÊr
ode: ASME
blll
fXl
Stamo Reçuired:
Yeg
I
I
No
f
I
8A$S
OF
gÊLECTION
ÊNERÂ[
&l
SPRING
LOADED
PRESSURE
RELIEF
VALVE
SPECIFICATION
SHEET
Revlçed
DåIÊ
R€quÍsjtion
No.
sh€et
¡{o,
fåge
of
NOTE:
KOC
ta
mark
/
Íntlicate
items to be
filled
in
by the
ManufacturerNendor
with an
Asterisk
(*).
¿J
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 30/35
Ø
PPENDIX-1
DATA
S
HEET :
PI
LOT-OP..ERATE
D
PRESS
URE
RE LIE F
VALYE
(For
Add¡tianal
detaits
refer
rc API 520 Part l)
Kuwait Qil Company
Page 30
of
35
OC.
NO.
KOG.hTP{27
PART I
REV.1
57
61
qlt*¡rahtã
Overpo.ts*¡e
iJì P€rc€nt
d Ulìtl$:
6
ffi¡Gen*¡t
fe*
P¡stsure ¡nd|Jnrb:
5.
r¡pe$m*e¡s8d
8,¿cl
Pree*¡ro
and
Unit¡l
4
59.
fficeA€a
.n t-up
B*ek
Pres¡re
ârld
Uürts:
3.
st¿¡NG A¡¡Ð
SELECTIOII
efid
?..
Op€r¿ling
Tenïer*u¡s
sr¡d
Ur þ:
1
Lorent
tteat
.f
V"F,o;retjú¡
ad
Unís:
O
41.
lTed
Ga€s:
Ye3
I I
I\¡o
I
iffi¡ru
Srônd'rd
t I
O{þr
t I
ít{
Þrsassrs ¡nd
t-b}it&
8
Jp€r"@Ptaeture
ãn¿
t
l¡vts:
7
?o
Te€¡
l¡tdacãlq: Yea
I
r.b
',rì*co*ity
el Fkrfft¡g
tåmp€.aturo
¡nd
Units;
t.
37.
FieH
Teet Csì¡ì€€rion:
Ye€
y
5
36
Pacftâd
I¡¡¡ns
4.1
35
Fiher
Yet
NÔ
Rurd
efid SlålÊ:
3
ACCESSORJE9
€RvtcÈ
coNDlTlol¡s
4.
ûlhsrllSoeol¡¡
6
33
32.
Spnng:
trf--
Rtrç Fæi,r*'
r*et $i¡ç:
Rüts
Focrۃ
4
3ó. îuUngJñTþ'¡q :
o?{1,¡EcTlol'¡3
?cì
2t.
SÈ*
Sêå
?7.
lntarn¡I¡:
26.
BodvlBonnet:
¡ld{Vent
A¡nrolFfwre
t
I
Outlôl't
l
6.
MÁTERIALS.
PILOT
SÊ¡rTlqhù'aûf
AFr527
t
I
5.
Sed
T19e:
[¡t¡]s¡.{t"itelã,
[ |
Re*lhrtt
[ ]
4
24. Ê:ttÍ
Li¡erÊüiia:
rlol
Senss
lnlrnal
I
I
RênÌd.
t
I
3
23
hston
Seal:
ilol
Åcnrft
Fæ
I tr
l,t€dr¡¡ùt¡g
t
I
)
?2. Re¡ÞÍSd
3e*:
rbl
Typa: Fk:$rrg
I I
¡¡onr¡ceiltng
I
I
1
21.
Sê{tl\|ÊøB}
Fc¡sr
lun{:er
ol Filot¡:
0
OsiqlrÎypG; Pi*bn
I I
olaphragm
I I
Bdrcšvt
f
¡
MATERIALS,
MÀIN
VALVE
ALVE OE.sIGÈ¡
I
lRr$0¡reDj¡lc
YÊs
t I
f,¡c
I
OlhÈr
urrôer Rsquked.
ô
lCar¡fu
v.*t AFI
5f,8:
Yee
¿nrco,
bne,.
ot
EcËr¡Þnrer¡t
þlr¡ntl¡en
Í¡g
ttlt¡¡l¡er:
)
vn
Ye¡
INo
sm
NurY¡b€r:
BASIS OF SELËCTIS}I
EI¿ËRAL
lv
PILOT.OPERATED
PRESSURE
RELIÊF
VALVE
SPECIFICATION
SHEET
ì€.rrirsd
Date
Job No
No.
NOTE:
KOC
to
tTtark/
indicate
items
by
the Møn
an
Asterisk
(')
rþ
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 31/35
Ø
PPENDIX.l
DAfÂ
$HEET:
RUPTURE
DISK9EVICE
(For
Additional details
refer to
Afl
52A
Pqrt
l)
Kuwa¡t Qîl Campany
the
Manu
:-:
53.
aitrnl¡fâc1lrÈfs
Bûta
40 Olher
l*$âlå
Assv lv]nl
& rdåü
52
Êr¡rl¡]fe Dlsk ñlater1al5
38
Jãrl(Êrreçrs {vËgTioI
5l r{ðx Floll9 Reselance K
¡
7 Studs
& l.lutÊ
(vftu
{t
Matl
50.
os,eGllfia
Eâtlo
4 .
ôaàRê^aia€
Id¿n
lr,tari(Éd Bu¡sl Pr€$gofe
3n
{ìilm
1¡õ
¿vesiÌ{il å Sfze
d8. frÐ(
llarked
Bu$t Pre€sure
Heklêr
Mat€nÊ¡
louugtì
47
3o€¿lflèd 8llñt FresÉurÊ
3.t
ó€.
rkfer
Målefiãl
lnl€{}
sDs€lfiÊd Bursl
Te¡ïBeralure
33,
ûusntllv
Re{Îultêd
[t*ï¡lìùtufilrd
Rãnoët5.
32 ,{û{tr€t Das,f,nalof
.Jrrânltlv
Retruì:fed
d.
3t.
¿3
eJrxr
Tvûe
L{{}dÈt nù$]snatof
3t
¡¡2.
ûmlnãl
Hrrd*r
SÊe
Dlek Tvûe
29
Ho{ü¿r T:xr
l{o
Nf}mñrl.nr€k St"e
1
lùsturu D|6t lioldêr
Ru6tura
ôltk
6.
:Janac
st¡aelæ:l Á C æ t
28
FiDtno
scnedute ff Bôîe
27
Faee
23 DS*
Locatecl
ocvrnsream
o1
\rair€
{Y€dno)
¿t
D€ft
21
70.
lnlel vðc1turi1 cofi
dilo$s
lg,
Bðt¡(
Pres6ufo
.t8
urlt{p
Eack
Pless¿¡re
t7
SupenmBcs€,d 8õct
Prssgure
16.
pt€sgute
i.¡oÍîãl Ètaxìmum
Ûp€rallng
TemFËr¿ture
5
14
À{êxlîurÍ
13.
Sçeof¡c
H*¡t
RaUo
12 Câmtr€69lbll*ì/
Fa€to.
{A
lt
frcÉecuhr
Wetqjtl or Spccrllc Gra'\rrty
0
I Reau¡re.d Rellev*ìa
CaÐacúv
I
7
rKJód
6
issr{ or Ftlin{
MÁWP
)Ê8 Cn
Code
Of
S¡ândgåû
l.lurnhér
_.
ode
or Slândsrd
tìem NufnÞer
gerYlce.
Lne,
orEqúp. No.
åral
levlseú
nale
Job
No.
Reautsltiari No.
She¿l Nõ F-?E d
,
RUPTURE
DISK DEVICE
.
SPECIFICATION
SHEET
REV. I
age 3t of35
OC.
NO.
KOC.MP{}z7
PART 1
NOIEr
KQC
to
mark
/
indlcate
items
ith
ctn
Asterisk
(")
¿r
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 32/35
APPENDIX.2
FIGURE-1: THE-,PRESSURE-LEVEL
RELATION_SHIP
FOR.PRV
(Sau¡ceiAPI
S2tì
í'art
l)
tlltsn¡¡märÐ
sûaûilSûlltSræü¡rr,
für.r$r,¡ÈûI1$¡
121
12t
¡|ffiÃT
fçf3rrl?il'SräsrFü:
tf,llræ1ç
r ËJm¡ruf
åttffie*ûtrænßf
rñ¡üþ"llrartÞs¡[Èr .
lEith{tli¡ç
*3æqrü
il6
r15
tà/|Þvllvð
lrffisDrüûtdno
FËtrlr¡
?F¡æcrsa:afg.
8æ4riht
iaå:fiïEn
É¡lvlt$
Fç ¡tE
g
Ê
rru
l
tr
,,
I
å
rc5
L
å
Ë
a
l'
,,0
B,
Ë
t
.
Ff
tfætr*ûg
lla$¡ir¡ñ¡þËrbÞ
le,*nufC
¡rrfirl
b'i
s{È.{sr.t¡drt'þfi
{s$ilr
rìãû ü}èYFæ¡¡rËl
lÆt¡drÌ¡ñ¡
úñ#
¡Ë
Srüñunt
ffi
*uSFtTel*¡
lËlÊ't
çttrÊ|fpo*.r
&,tr¡re{3¡¡Èftrtrtrrrl}
L/þdir¡$t
ü¡on¡þr rr*
ÊftúJrr
lor
ldct?fin¡r¡
rr¿a$tt
Sr¡crgtl
Hdñn¡$*lmùe.
u,ülftgÍq¡''e
ú
drJ0fllfl|rFé
(st,
l{Eia4}
ñþ)ô?riiñi
üsñ¡a ¡d
trsüs þr¡DSrwñ¡ê
gbtdfi.n
üWçdl
€â€l.hügÌ
95
ixotllg
Fn
{¡¡ftF*r
ûfllllcv*¡r
¡daË{u*}
ctnc{lrÛ
oFüd¡rgslr.q*c
{roc
l{ß:kt tð Éq}
LçAr læt
$rês$¡fr
lt ?Hrl
85
't}Ëtd,cùüaffi0t
Psaræ
fr¡st\¿rrlr*
:Vd
Èa¡G88t ú¡çvf¡¡cñe$ú¡ û$re
NOTES:
I,
Thi.s
Figure
conforms v,ith
the
,'equircnrcnts
a.f
ÅSÌllE
Scction
Vltl
Div.
I
for
lvlAIlP
g 'eater
than 30
¡tsi.
2.
The
pressut'e
conrJìtio¡ts
sholn
are.[ar
PRV installed
on
a
pressure
vassel-
3.
T'lte
allowable
se -pt'essure
tolerance
u,ill
be
in
lccorclance
*'ith
the
ap¡slicahle codes.
1.
'I'he
üttti¡nun
allotyable
vorking
prussure is ec¡ual to or
grealer
lhan
rlte
desÌgn
pressat'e
for
a
coincirlertl
dcsign tetnpe.ralure
5. I'he
operoti$gle¡rrpetature
nay
þe
þigþst' ot' lov'er
than
g0
psig.
þ
RETI.
T
age
3ä of35
OC.
NO.
KOC.üTP{}2? PART
{
6.
Refer
to .4SME
iec¡ion
ll
ll
Div. I
.[or
guidance
on
hlo*'down arul
prcssu'e
difl'erentinls
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 33/35
P
l*
REì/.
T
age
33
of
35
OC.
HO.
KOC.MP{2?
PART
I
APPENDIX-2
/Courinued)
FIGURE-2:
.rne
FnEsSUne+eV
6ourceultlÅ2UsLú
Lts¡gn¡1ì û¡þir¡¡t¡l¡t
acãjmdlùtã
¡fæu¡c
(trll..
Êx9û'lrr
Énv,
1¿ I
tlu
ttâ*ä¡m-rË€r{tgFtttsl¡¡Ë
turftflÈf{e$
M€¡rcfnum
gJldre*þ
aacrrmr¡lêle{t
púEstùÈ
fçr
nÍBf*t&rì
ef
å rìl¡lijFgË
n$türê
ü}3t{Eivt€Ë
(alhlr
l¡1afi ü erpexre)
116
1r
Mûx¡tuf't
¡ellårrç
ffÊ3ê{lra
tBr
prûc€ti r¡¡f¡&
lfußþE
ftStr¡rê nþ¡
dü.ircc¡
S¡ndÊ ruplûrE
l.rt
@€e
Mü¡frill{¡t aãsrvrùþ
âcctnT¡¡5têil
[rer3¡í
für
hsl¡{aîtgâ
al¡
sÍrytÊ
ruttuË
d¡sk
d.ì1{È
{cËrcr
lhafl ûri ¿ryúEr.¡?È)
â
¡
J
ô
À
É
Ë
g
g
*
I
E
f
T
ã
È
f,
:
.{
110
tsl6¡**+Jr:l
a{¡grf,sÞte rllå¡têd
Þ{q3Î
pñt*rrË
tur ¡tlpp€ñnQ¡¡¡
{l:rp
€rFq{ãa)
ruplurE
dßk
dÊr¡ice
(Èeü
l{ðt. 6l
crjÊfFr€5{nr
ínûËnum}
1
05
[,þrrnrm
ãllÊer€Þl€
rnartrrd
Brlni
Ff¿39r¡rê
fs
âdgtÞmal
ruslrf*
drg(
q*$ct
(eæ¡r.lç6)
Mil¡ðmum
ã fr,sùb
*o,trq
pælsrnt
ol
de**n
pr?srJ&
{sqs
Ncrto 3l
Àt8¡únllm
sl¡E1liûbþ
rñaf
k?d
Ir{rít
Frä8un
tùf r¡figlr Rsû¡cr
6fldev{æ
{åaÊ
t}eèÉ
€)
95
Llå&'nÊ¡m
erpÊ{tûd
ûpêrelr¡g
paggsb.lr
(r€e
ftetçr
ã
ãfið 6)
lipicã]
Cfl¡T-ðçtcd¡tki
(:,
a
Rrpfurç
Dh¡r OeìñcÊ
ve*f*t
Pfeigur
r* +uf * \'c*sðl
Reqr.¿kffi
èñts
NOTIiS:
l.
'this
Figure ssqfonns
with
the
requirenents
of
,45'llÇ
Section
lllll
Div. I
fot'
)Vl,4IyP
gt"ealer
than
3A
psi.
2.
'flrc
pressut'e
condition.ç
.rlnv'n
are
for
RupÍure
Di-sk
Deviæs installetl
on a
prussure
vcs-scl.
3.
lhe
mnrgin
:atween
tlrc maxinunt
sllov'alsle rlorÀlir,g
prcs:in'e
¿n¿l
the
opcruling
prc.s.\¡lrc
uu.çt
l¡e
considered
in
the selection a ntplure disk.
.
4.
'llta
allovable
hurs -pr,assure
tolerc¿nce
x,ill be in
ac:corrl¿tnce
v,ith
the
applicable code.
5.
'fhe
operoting
Dressure nûy
be
highe t'
or
lower Íhun 90
psig disk
design
ó.
fite
narked
b'uts -pressurc
of
tlrc
nt
n' ke
d
Lt
u
rs r
f
rc.\
J ril'e.
any
ttt &Y i
¡¡t
u t̡ a
I
I
otç'
q
h
I e
,1,
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 34/35
q
IL
REV
,|
Page
34
of
35
oc.
No. Koc.MP-027
PART I
ACKNOTìILEDGEMENT
This KOC
Starrdard
has
been
approved
by
the
Standards
Technical
Committee
(STC)
consisting
of
the
following.
Mr.
AJRedha
Al-Haddad
Mr.
Mohammad
Emam
Mr.
S. Kumar
Mr. Henry
Hill
Mrs.
Amina
Raiab
Mr.
Khalaf Harnada
Mr.
N,
Ramanathan
Mr,
Khalid Al-A.hmad
Mr.
Daniel
Pino
Mr.
Ali
Hassan
Al-Failakawi
Dr.
Modistaba
Araghi
Mr.
Abdut
Aziz
Akbar
Mr,
Moataz
Khalaf
Standards
ïeam
lnsp.
& Corr.
Team
(S&E)
Standards
Team
Opns.
Tech.
Svcs, Team
(SK)
Design
Team
Design Team
Major
Projects-EFP
Team
Gen. Projects Team
Utilities
ïeam
HSES
ïeam
lnsp.
& Corr.
Team
(N&W)
Project
Mgmt.
Team
(NK)
lnformation System
ïeam
Chairman
Depug
Chairman
Secretary/
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
The draft of this Standard
had
been circulated
to the
KOC
User
Teams
for
review
and
the
responses were
received
from
the
following:
ENçINEERING
GROUP
Team Leader Design
AHMADI SERVICES
GROUP
Team
Leader
Project
Design
Team Leader
Utilities
TIONS GROUP ISKI
Team
LeaderOpns.
Tech.
Svcs
OPE
TIONS GROUP IWK)
Team
Leader
Opns.
Tech.
Svcs
OPE.RATIONS
GROUP
{NK)
Team
LeaderOpns.
Tech.
Svcs
INNITSTFIIÄI SERV¡CES GROUP
MAJOR PROJECTS
GROUP
Tearn
Leader
Project Support
HsE.GR9LF,
Team Leader
Safety
Team Leader
HSE Systems
EXPORT
& MARINE
OPNS.
GROUP
Team
Leader
Export Services
DRIILING
OPERATIONS
GROUP
Team Leader Drilling Services
DrvrDED
?ONE
GROUP
Team
Leader
Proj,
Ëngg.
&
Facilities
rp
Team
Leader
lnsP.
& Corr.
(N
&
WK)
7/25/2019 KOC-MP-027 part 1
http://slidepdf.com/reader/full/koc-mp-027-part-1 35/35
This
KOC
Standard
for
Pressure
Relief
Devices:
Design and Materials
{KOC-MP-
027 PART 2,
Rev.1) has
been
prepared
by
the
Task Force
(TF-MPI07)
comprising of the
following:
Mr,
Miza
Mohsirr
Mr,
Raj
Maharaj
Mr, Adnan
Bohammed
Mr.
Yousef M.
Zaman
Mr.
Nawaf
Al-Shehab
Mr.
Mohammed
Al-Ajmi
Standards
Team
Major
Projects
Team
Design
Team
Opns.
Tech.
Svcs,
(SK)
Opns.
Tech.
Svcs.
{NK)
Opns.
Tech. Svcs.
(WK)
TF
Leader
&
Author
Member
Member
Member
Member
Member
Ex: 61
371
Ex:
66975
Ex:61815
Ex',22241
Ex'.23437
Ex:
20336
R