KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM...

15
KNIGHT PROJECT DRILL PROGRAM

Transcript of KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM...

Page 1: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

KNIGHT PROJECT DRILL PROGRAM

Page 2: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

FORWARD LOOKING STATEMENTS

We are in the mineral exploration and development business. It is inherently risky, and all potential investors should be keenly aware of this.

This presentation contains forward-looking statements. All statements, other than of historical fact, that address activities, events or developments that Orefinders Inc. believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding the estimation of mineral resources, exploration results, potential mineralization, potential mineral resources and mineral reserves) are forward-looking statements. Forward-looking statements are generally identifiable by use of the words “may”, “will”, “should”, “continue”, “expect”, “anticipate”, “estimate”, “believe”, “intend”, “plan” or “project” or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond Orefinders Inc.’s ability to control or predict, that may cause the actual results of the project to differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, without limitation, failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with Orefinders Inc.’s expectations, changes in world gold markets and other risks disclosed to the Canadian provincial securities regulatory authorities. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Orefinders Inc. disclaims any intent or obligation to update any forward-looking statement. All currency numbers

are in $CAD unless otherwise stated.

Orefinders treats all technical reports, NI 43-101 or otherwise, as historical in nature unless is it is commissioned and overseen by Orefinders.

2

Page 3: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

OREFINDERS’ KIRKLAND LAKE FOCUS

OMEGA

PROPERTY

Orefinders

Resources

3

Page 4: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

KNIGHT PROJECT – 3 TARGETS IN A LARGE GOLD SYSTEM

Juby Resource EstimateIndicated: 26,600,000 tonnes @ 1.28 gpt goldInferred: 96,200,000 tonnes @ 0.94 gpt goldTotal ounces: 4.0 million

4

1. Porphyry Lake - High priority untested drill target• 300m long x 250m wide• High chargeability, low

resistivity anomaly• Confirmed on 3 IP lines• Possible mineralized porphyry

core of gold-rich alteration system

• Never been drill tested

2. Tyranite Mine• New Interpretation of

Mineralization• Never been drill tested

3. More Minto Pipes• New Breccia Pipe Targets

similar to Minto• Never been drill tested

1

2

3

100km

Knight (Orefinders Resources)

Juby (Caldas Gold)

Legend

Page 5: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

1. MAJOR ANOMALY UNDER PORPHYRY LAKE

• Large gold alteration/mineralization system centered on Porphyry Lake

• Multiple significant gold intersections surrounding Porphyry Lake Target –but target itself has never been drilled

• Major untested IP high chargeability/low resistivity anomaly over 300m long by 250m wide under Porphyry Lake.

Page 6: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

Porphyry Lake

N

IP Anomaly Target

IP Anomaly Target Beneath Porphyry Lake

Porphyry Lake IP Anomaly TargetWell developed high chargeability, low

resistivity anomaly, 250m wide and 300m long and confirmed on 2 additional lines to south. Possible mineralized porphyry core of gold-

rich alteration system. High priority untested drill target can be drilled from shore.

N

Page 7: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

Survey Line 1400N - IP Dipole-Dipole AFRI: 41PNW2002

Priority IP Anomaly Target at Porphyry Lake Long Section

Page 8: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

PRIORITY IP TARGET AT PORPHYRY LAKE

N Tyranite

Duggan

MintoPorphyry

Lake

Legend

Major IP Anomaly

Knight Gold Property

Historical Drill Hole

Hole ID Intersection

PL-3 36.1 gpt over 1.5m from 29.5m and1.58 gpt over 25.5m from 65.5m

PL-04-02 0.63 gpt over 28.0m from 20.0m

PL-11-01 4.01 gpt over 3.0m from 211.4m

PL-7 7.90 gpt over 1.5m from 168.5m

PL-2 2.33 gpt over 1.1m from 58.9m

PL-11 0.70 gpt over 1.5m from 48.0m

PL-17-02 1.53 gpt over 0.5m from 24.6m

PL-17-03 0.57 gpt over 1.3m from 64.4m

PL-17-01 0.52 gpt over 0.9m from 106.9m

Page 9: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

2. NEW INTERPRETATION AT TYRANITE

Focus on the Contact Zones of the Ultramafics

• 3D inversion of magnetic survey allowed us to redefine geological model

• Tyranite was interpreted and mined as a simple ‘Fault’ style deposit

• New Interpretation is focused on the contact zones of the ultramafic units striking at right angles to the fault.

• Tyranite has never been drilled using this specific model/interpretation

Page 10: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

POTENTIAL NEW MINERALIZATION AT TYRANITE

N

TyraniteDuggan

Minto

Porphyry Lake

Legend

Longitudinal Section

Knight Gold Property

Page 11: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

NEW INTERPRETATION AT TYRANITE

Longitudinal section of Tyranite looking East

Area of greater than 3.0 g/t Auover minimum 1.5m thickness

High priority target

Other target

Page 12: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

3. NEW MINTO-STYLE TARGETS DISCOVERED

• High priority targets identified via reprocessing high-resolution magnetic survey using Minto discovery as a reference

• New survey shows three dozen similar point like magnetic anomalies within the same formation that hosts Minto and Porphyry Lake systems

• Ground sampling on all targets confirmed 10 targets for follow up IP surveying (Minto breccia responds to IP geophysics)

• Any anomalous targets from IP surveying will be drill tested

Page 13: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

Minto-Type Targets and Proposed IP Survey Lines

Minto

TyraniteDuggan

Porphyry Lake

Legend

Minto-type Targets

Knight Gold Property

Minto Breccia PipeIP Survey Lines

Page 14: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

OREFINDERS CORE MANAGEMENT TEAM

Stephen Stewart, M.Sc., MBA – CEO and DirectorStephen has over 15 years of experience in the resource and finance industries where he has evaluated and raised capital for natural resource projects. His focus has been on the acquisition, exploration and development of resource assets and has served as a senior officer with TSX Venture companies.

Alex Stewart, J.D. –Chairman and DirectorAlex has over 40 years of experience in the practice of securities law and natural resource investment. In the past he was the founder behind a number of mining projects including the Cote Lake Project and the Eagle One deposit. He holds a Bachelor of Arts from the Western University, a Juris Doctor from the University of Toronto Law School and a Diploma, LCE, from the University of Madrid.

Charles Beaudry, M.Sc., P.Geo – VP Exploration and DirectorCharles is a professional geologist with more than 35 years of experience in mineral exploration and project development of precious and base metal deposits across the globe. Charles spent 17 years with Noranda-Falconbridge-Xstrata as well as a tenure with IAMGOLD as General Manager of New Business Opportunities.

Gautam Narayanan, M.Sc. MBA, Corporate Development ManagerGautam’s previous experience spurs from the Capital Markets, where he served as an equity research associate covering Base and Precious Metals at Canaccord Genuity, and prior to that, as a consultant focusing on natural resource investments--primarily covering the global phosphate and potash industry.

Antoine Schwartzman M.Sc., - Geology ManagerProject Geologist who joined our team in June 2018. Mr. Schwartzmann is responsible for the data management, modeling and targeting of our projects working directly with the VP of exploration

14

Page 15: KNIGHT PROJECT DRILL PROGRAM - Orefinders · KNIGHT PROJECT –3 TARGETS IN A LARGE GOLD SYSTEM Juby Resource Estimate Indicated: 26,600,000 tonnes @ 1.28 gpt gold Inferred: 96,200,000

CONTACT US

Stephen Stewart

Chief Executive Officer

Orefinders Inc.

[email protected]

416.644.1567

15