Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64...

19
ISSN: 1848-0993 Ključne brojke 2014 Key Figures

Transcript of Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64...

Page 1: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

ISSN: 1848-0993

Ključne brojke 2014

Key Figures

Page 2: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

Duljina mreže po broju trakova/Length by number of lanes

61,2 km 1.207,4 km 20,8 km

1.289,4 kmAutoceste/poluautoceste u prometuMotorways/semi-motorways in service

Nove autoceste otvorene u 2014.New motorways opened in 2014

Dopuna do punog profila u 2014.Upgrade to full profile in 2014

Nove autoceste - otvorenje u 2015.New motorways scheduled in 2015

0,0 km

0,0 km

24,2 km

2

MREŽA AUTOCESTA/MOTORWAY NETWORK

20,8 km 2 X 3 traka/lanes

6 1 ,2 km 2 X 1 trak/lanes

1.207,4 km 2 X 2 traka/lanes

38,8 kmBroj mostova i ukupna duljinaNumber and total length of bridges 151

Duljina zidova za zaštitu od bukeLength of noise protection walls 88 km

Page 3: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

3

Razvoj mreže po godinama/Development of network by years (km)

Otvoreno novih autocesta po god./New motorways opened to traffic by years (km)

MREŽA AUTOCESTA/MOTORWAY NETWORK

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

0 50 100 150 200 200 km

1996

1997

1999

2000

2001

2002

2003

2004

2005

2006

2007

0 200 400 800 1000 1400 km600 1200

149,0

92,3195,3

43,781,0

41,439,4

0,0

0,0

0,0

10,0

32,5

19961991

1998

201020092008

20122011

20142013

346,4394,3

418,2466,9

522,5540,8

559,0598,6

747,6942,9

1.035,21.078,9

1.159,91.201,3

1.240,71.250,7

1.289,4

Page 4: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

4

Mala Kapela A1

57 kmUkupna duljina tunelaTotal length of tunnels

4,4 %Udio tunela u ukupnoj mrežiPortion of tunnels in total network

5,8 kmNajduži tunelThe longest tunnel

733

> 1 km

> 2 km

> 5 km45

6

MREŽA AUTOCESTA/MOTORWAY NETWORK

Ukupan broj tunelaTotal number of tunnels 51

Broj nezgoda u tunelimaNumber of accidents in tunnels 68

3,1 % Udio nezgoda u tunelimaPortion of accidents in tunnels

Page 5: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

5

U planiranjuIn project

U izgradnjiIn construction

U prometuIn service

A2

A9A1

A10

A11 A5

A4

A3

A8A6

A7

A1*

A3

A1

A1

MostDrava

UKUPNO/TOTAL: 1.289,4 km

MostSava

A9

MREŽA AUTOCESTA/MOTORWAY NETWORK

Dijelom autoceste A1 od Zagreba do Bosiljeva upravlja ARZ/Part of the motorway A1 from Zagreb to Bosiljevo is operated by ARZA1*

A10 A11

Most KRKBridge Krk] [

HAC 901,4 km

ARZ 187,0 km

BINA ISTRA 14 1 ,0 km

AZM 60,0 km

A1 A4A5A3

A1* A6A7

A2

A8A9

Tunel Sveti IlijaTunnel Sveti Ilija

Page 6: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

A2: Zagreb – Macelj Zagreb – Krapina Krapina – Macelj Dio dionice Krapina – Đurmanec

60,0042,8013,40*3,80

–––

–––

––––

60,0042,8013,40*3,80

–––

UKUPNO/TOTAL: 60,00 – – 60,00

A1: Bosiljevo 2 – Split – Dubrovnik 415,30 – – – 415,30 –DC 532: Spojna cesta Zagvozd - Baška Voda* 7,30 – – – 7,30 –Spojna cesta Karamatići - Luka Ploče – – – 1,20 – –A3: Bregana – Zagreb – Lipovac 306,40 – – – 306,40 –A4: Zagreb – Goričan 96,90 – – – 96,90 –A5: Beli Manastir – Osijek – GP sa BiH

B. Manastir – Osijek (samo most Drava 2,5 km) Sredanci – granica BiH (Svilaj) Most Drava - OSijek Most Sava

55,50––––

–––––

–2,503,20

––

–––

3,800,70

58,70––––

– –

3,20––

A10: Granica sa BiH – Metković - č. Ploče 8,50 – – – 8,50 –A11: Zagreb – Sisak

Jakuševec – Velika Gorica jug Buševec – Lekenik

11,50––

–––

–10,0011,00

–––

32,50––

–10,0011,00

Brza cesta DC10 Podravski ipsilon Gradec - Križevci

– –12,50

––

––

––

Brza cesta DC12 Podravski ipsilon Vrbovec - Farkaševac

––

–– 10,60

––

––

––

UKUPNO/TOTAL: 901,40 – 49,80 5,70 925,60 24,20

A1: Bosiljevo 2 – Zagreb 65,25 – – – 65,25 –A6: Rijeka – Bosiljevo 2 81,25 – – – 81,25 –A7: Rupa – Matulji – Diračje – Orehovica 28,00 – – – 28,00 –D10: Most Krk i pristupne ceste 12,53 – – – 12,53 –

UKUPNO/TOTAL: 187,03 – – 187,03 –

A8: Kanfanar – MatuljiKanfanar – Pazin (č. Rogovići)Pazin – Matulji*

64,2118,1346,08

–––

––

**10,68

64,2118,1346,08

–––

A9: Umag – PulaUmag – MedakiMedaki – KanfanarKanfanar – Vodnjan jugVodnjan jug – Pula

76,8041,84

7,3620,70

6,90

–– –––

––––

––––

76,8041,84

7,3620,70

6,90

–––––

UKUPNO/TOTAL: 141,01 **10,68 141,01

Autocesta/poluautocestaMotorway/semi motorway

U prometuIn service 31/12/2014

OtvorenoOpen in 2014

U izgradnji/In construction 01/01/2015

Početak izgradnje Start of const. in 2015

Ukupno Total

Otvaranje Opening in 2015

UKUPNO HRVATSKATOTAL CROATIA: 1.289,44 49,80 5,70

**10,68 1.313,64 24,20

* poluautocesta/brza cesta // semi motorway/fast road

UKUPNO SVE AUTOCESTETOTAL ALL MOTORWAYS

BINA - ISTRA d.d.

AUTOCESTA RIJEKA - ZAGREB d.d.

AUTOCESTA ZAGREB - MACELJ d.o.o.

HRVATSKE AUTOCESTE d.o.o.

Page 7: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

A2: Zagreb – Macelj Zagreb – Krapina Krapina – Macelj Dio dionice Krapina – Đurmanec

60,0042,8013,40*3,80

–––

–––

––––

60,0042,8013,40*3,80

–––

UKUPNO/TOTAL: 60,00 – – 60,00

A1: Bosiljevo 2 – Split – Dubrovnik 415,30 – – – 415,30 –DC 532: Spojna cesta Zagvozd - Baška Voda* 7,30 – – – 7,30 –Spojna cesta Karamatići - Luka Ploče – – – 1,20 – –A3: Bregana – Zagreb – Lipovac 306,40 – – – 306,40 –A4: Zagreb – Goričan 96,90 – – – 96,90 –A5: Beli Manastir – Osijek – GP sa BiH

B. Manastir – Osijek (samo most Drava 2,5 km) Sredanci – granica BiH (Svilaj) Most Drava - OSijek Most Sava

55,50––––

–––––

–2,503,20

––

–––

3,800,70

58,70––––

– –

3,20––

A10: Granica sa BiH – Metković - č. Ploče 8,50 – – – 8,50 –A11: Zagreb – Sisak

Jakuševec – Velika Gorica jug Buševec – Lekenik

11,50––

–––

–10,0011,00

–––

32,50––

–10,0011,00

Brza cesta DC10 Podravski ipsilon Gradec - Križevci

– –12,50

––

––

––

Brza cesta DC12 Podravski ipsilon Vrbovec - Farkaševac

––

–– 10,60

––

––

––

UKUPNO/TOTAL: 901,40 – 49,80 5,70 925,60 24,20

A1: Bosiljevo 2 – Zagreb 65,25 – – – 65,25 –A6: Rijeka – Bosiljevo 2 81,25 – – – 81,25 –A7: Rupa – Matulji – Diračje – Orehovica 28,00 – – – 28,00 –D10: Most Krk i pristupne ceste 12,53 – – – 12,53 –

UKUPNO/TOTAL: 187,03 – – 187,03 –

A8: Kanfanar – MatuljiKanfanar – Pazin (č. Rogovići)Pazin – Matulji*

64,2118,1346,08

–––

––

**10,68

64,2118,1346,08

–––

A9: Umag – PulaUmag – MedakiMedaki – KanfanarKanfanar – Vodnjan jugVodnjan jug – Pula

76,8041,84

7,3620,70

6,90

–– –––

––––

––––

76,8041,84

7,3620,70

6,90

–––––

UKUPNO/TOTAL: 141,01 **10,68 141,01

Autocesta/poluautocestaMotorway/semi motorway

U prometuIn service 31/12/2014

OtvorenoOpen in 2014

U izgradnji/In construction 01/01/2015

Početak izgradnje Start of const. in 2015

Ukupno Total

Otvaranje Opening in 2015

UKUPNO HRVATSKATOTAL CROATIA: 1.289,44 49,80 5,70

**10,68 1.313,64 24,20

** dopuna do punog profila autoceste // upgrade to full motorway profile

Page 8: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

8

USLUGE/SERVICES

HoteliHotels

9

Odmorišta/Rest areas

124svakih/every 20 km

Benzinske postaje/Filling stations

76svakih/every 28 km

Cafe barovi/Caffe bars

83svakih/every 23 km

Restorani/Restaurants

20svakih/every 74 km

Prijelazi za divlje životinjeCrossings for wild animals

13

Broj dinamičkih informacijskih panela/Number of VMS

130COKP Centri održ. i kont. prometaMTCC Maint. & Traffic Control Centres

29

Broj parkirališnih mjesta LVNumber of parking places LV

6.588Broj parkirališnih mjesta TVNumber of parking places HV

2.152

Page 9: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

9

Broj vozila u područjima naplateNumber of vehicles in toll collection zones 65,7 mil/

mio

TvrtkaCompany

%(14/13)

%(14/13)

Total %(14/13)

HAC 28.322.549 1.35 4.323.945 5,50 1,88

ARZ 16.905.622 1.15 1.832.433 9,15 1,88

Bina-Istra 7.449.854 3.31 651.036 -0,38 3,00

AZM 5.448.753 -12.45 720.778 -5,39 -11,68

UkupnoSubtotal: 58.126.778 0.06 7.528.192 4,66 0,56

SveukupnoTotal: 65.654.970 0,56

Udio LV i TV u ukupnom broju vozilaPortion of LV & HV in total no. of vehicles

0,6 %Rast broja vozila u područjima naplateIncrease in number of vehicles in tollcollection zones

2014/2013

PROMET/TRAFFIC

88,5 %

11,5 %

Page 10: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

10

PGDP po tvrtkama/AADT by companies

Broj vozila u područjima naplate 2012. - 2014. (u mil. voz.)Number of vehicles in toll collection zones 2012 - 2014 (in mio veh.)

106 x kmBroj voznih kilometaraNumber of km travelled

PROMET/TRAFFIC

6.537,8

DruštvoCompany

HAC 10.412 1.753 12.165ARZ 14.834 1.866 16.700

Bina-Istra 20.411 1.784 22.195AZM 14.156 1.555 15.711

Ukupno/total: 12.163 1.739 13.902

1 .142,2 BINA ISTRA

344,1 AZM

1 .109,4 ARZ

3.942,1 HAC

2012

2013

61,4

2014

61,8 62,2 62,6 63,0 63,4 63,8 64,2 64,6 65,0 65,4 65,8 66,2

64,7

65,3

65,7

Page 11: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

11

Nezgode po vrstama/Accidents by type

Nezgode po tvrtkama/Accidents by companies

Broj vozila koja su sudjelovala u nesrećamaNumber of vehicles involved in accidents

SIGURNOST/SAFETY

2.835

2011 2012 2013 2014S poginulimaWith fatalities 28 29 31 21

S ozlijeđenimaWith injuries 367 346 308 293

S materijalnom štetomWith material damage 1.971 1.839 1.823 1,863

Ukupno nezgodeTotal number of accidents 2.366 2.214 2.162 2,177

Ukupno prometne nezgodeTotal traffic accidents 2.177

0,7 % Rast prometnih nezgodaIncrease in traffic accidents

2014/2013

75 BINA ISTRA

1 5 1 AZM

3 1 1 ARZ

1,640 HAC

Page 12: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

12

Ukupno poginuli/Total of fatalities 2011. - 2014.

Poginuli prema porijeklu registarske pločice vozilaFatalities by origin of vehicle registration plates

SIGURNOST/SAFETY

Stupanj smrtnosti (109 voz. km)Rate of dead (109 km travelled)3,8

Ukupno poginuliTotal of fatalities25

-35,9 % Pad broja poginulihDecrease in fatalities

2014/2013

Vozila registrirana u RHCroatian registration plates

Vozila registrirana izvan RHInternational registration plates

14

11

Broj nesreća pri idealnim uvjetima vožnjeThe number of accidents in ideal driving conditions1.590

2011

2013

0

2014

10 20 30 40 50

2012

31

45

39

25

Page 13: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

13

Prekoračenje brzine/ Slijetanje s ceste Excess speed/Skidding off the roadway

Najčešći uzrociMost frequent causes

Stupanj sigurnosti (na 109 voz. km)Safety ratios (per 109 km travelled)

HAC ARZ Bina- Istra AZM RH

CroatiaRH %

14./13.Nezgoda s ozlije đenimaPersonal injury rate 47,69 54,87 9,62 75,58 44,81 -5,89

Nezgoda s poginulimaFatal accident rate 4,06 3,17 1,75 0,00 3,21 -32,98

Koeficijent poginulihRate of dead 4,82 4,22 1,75 0,00 3,82 -36,58

Srijeda/PetakWednesday/Friday

Najkritičniji daniThe most critical days

Materijalna štetaMaterijal damage

Najčešće posljediceMost frequent consequences

Ukupno prometne nezgode službe održavanjaTotal traffic accidents of Maint. Service Staff

Lakše ozlijeđeni/Injuries without hospitalisation

Teže ozlijeđeni/Injuries with hospitalisation

1875{

8 - 10 i18 - 20 h

Najčešće doba dana za prometne nesreće The most common time of day for traffic accidents

Srpanj/kolovozJuly/August

Najkritičniji mjeseciThe most critical months

SIGURNOST/SAFETY

Poginuli/Fatalities0

Broj nesreća uzrokovan prekoračenjem brzineThe number of accidents caused by excess speed353

Page 14: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

14

Pokriveno ENC-omCovered by ETC

1.229 kmTrakovi za ENCETC lanes

466

u mil/in mio EUR

399.729ENC Uređaji/OBUs

8,8 %Povećanje/Increase

255.101ENC Pretplatnici/ETC Subscribers

9,0 %Povećanje/Increase

EKONOMIJA/ECONOMY

Prihodi od cestarine (bez PDV-a)Toll revenues (without VAT) 297,0 mil/

mio

2,6 % Porast prihoda od cestarineIncrease in toll revenues

2014/2013

66,2 ARZ

25,6 AZM

183,6 HAC

21,6 BINA ISTRA

2014/2013

2014/2013

Trakovi za naplatuToll lanes

686Naplatne postajeToll plazas

105

Page 15: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

15

Udio načina plaćanja u ukupnim transakcijamaBreakdown of transactions by payment mode

Prihodi od cestarine/Toll revenues 2012. - 2014. u mil/in mio KN

1 EUR = 7,63 KN (Godišnji prosjek srednjeg deviznog tečaja HNB za 2014. Annual average exchange rate in 2014, Source: Croatian National Bank)

EKONOMIJA/ECONOMY

65,7 Ukupan broj transakcijaTotal number of transactions

mil/mio

1 % OSTALO/OTHER

30 % ENC/ETC

15 % KREDITNE KARTICE/CREDIT CARDS

52 % GOTOVINA/CASH

2 % SMART KARTICE/SMART CARDS

Ukupno investicijeTotal investments

u mil/in mio EUR

U nove dioniceInto new sections

U izgradene dioniceInto existing sections

30,1

57,5

€87,6 mil/mio

2012

2013

0,0

2014

500 1000 1500 2000 2500

2.126,5

2.245,9

2.266,5

Page 16: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

16

Ukupno investicije/Total investments 2012. - 2014.

* AZM, ARZ i BINA ISTRA nisu imale investicija u nove dionice* AZM, ARZ and BINA ISTRA had no investments into new sections

EKONOMIJA/ECONOMY

u mil/in mio EUR

Investicije u izgrađene dioniceInvestments into existing sections€30,1 mil/

mio

2,2 ARZ

3,7 AZM

21,1 HAC

3,1 BINA ISTRA

Investicije u nove dionice*Investments into new sections*€57,5 mil/

mio

Plan investicijaInvestment Plan€116,9 mil/

mio 2015.

€88,8 mil/mio

U nove dionice/Into new sections

€28,1 mil/mio

U izgrađene dionice/Into existing sections

u mil/in mio KN

0,0 500 1000 1500 2000

2012

2013

2014

1.947

1.849

669

1 EUR = 7,63 KN (Godišnji prosjek srednjeg deviznog tečaja HNB za 2014. Annual average exchange rate in 2014, Source: Croatian National Bank)

Page 17: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

17

ZAPOSLENICI/WORKFORCE

Podjela po društvima/Breakdown by companies

Stalno zaposleni u društvima za autocestePermanent Workforce in concessionaire companies 276

9 BINA ISTRA10 AZM

44 ARZ213 HAC

Ukupno zaposleni na mreži autocestaTotal number of employees on the motorway network3.477

7252.752

137139

5882.613

Zaposlenici društava operatera Workforce in operating companies3.201

Page 18: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

18

ZAPOSLENICI/WORKFORCE

Broj intervencija vatrogasnih jedinicaNumber of firebrigade interventions 1.409

Broj nadzornih video kameraNumber of CCTV cameras 1.569

Broj ralicaNumber of snowplowers 207

Podjela po operaterima/Breakdown by operators

221 BIUO (BINA ISTRA)

134 EGIS (AZM)

2.846 HAC-ONC (HAC/ARZ)

Podjela zaposlenika po poslovima/Breakdown of workforce by job

974 Naplata/Toll collection

1.351 Održavanje (bez ophodara)Maintenance staff (without patrol service)

184 Ophodari/Patrol service

672 Ostali/Other

20 Uprava/Management board

Page 19: Ključne brojke 2014 - Domino dizajn d.o.o. · TOTAL CROATIA: 1.289,44 49,80 5,70 **10,68 1.313,64 24,20 * poluautocesta/brza cesta // semi motorway/fast road UKUPNO SVE AUTOCESTE

HRVA

TSKA

UDR

UGA

KONC

ESIO

NARA

ZA

AUTO

CEST

E S

NAPL

ATOM

CES

TARI

NE/C

ROAT

IAN

ASSO

CIAT

ION

OF T

OLL

MOT

ORW

AYS

CONC

ESSI

ONAI

RES

www.huka.hr