Klatz Associates Final Presentation for the Green Mobility Challenge
-
Upload
central-texas-regional-mobility-authority -
Category
Travel
-
view
148 -
download
0
Transcript of Klatz Associates Final Presentation for the Green Mobility Challenge
![Page 1: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/1.jpg)
![Page 2: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/2.jpg)
LIVING
An Innovative Plan for the Manchaca Expressway
Living Parkway: a roadway designed to utilize and contribute
to the natural processes of the landscape it inhabits( )
THE PARKWAY
![Page 3: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/3.jpg)
ON-SITE CONDITIONS OFF-SITE IMPACTS
Native Vegetation
Clay Soils
Cave Invertebrates
Barton Springs
Barton Springs Salamander
LIVING THE PARKWAY
![Page 4: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/4.jpg)
THE PARKWAYLIVING
KARST LANDSCAPE
TYPICAL SECTION
![Page 5: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/5.jpg)
THE PARKWAYLIVING
EMBANKMENT ROADWAY
EXISTING
GRADE
ROADWAY
EMBANKMENTEXISTING
GRADE
ROADWAY
EMBANKMENT
TYPICAL SECTION
![Page 6: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/6.jpg)
THE PARKWAYLIVING
VEGETATIVE SWALE
TYPICAL SECTION
![Page 7: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/7.jpg)
THE PARKWAYLIVING
PERMEABLE FRICTION COURSE
TYPICAL SECTION
![Page 8: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/8.jpg)
THE PARKWAYLIVING
FLINT RIDGE CAVE POSSIBLE RECHARGE FEATURES
PARKWAY ALIGNMENT
Living Parkway
![Page 9: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/9.jpg)
THE PARKWAYLIVING
MOPAC INTERCHANGE HIGHLY SENSITIVE ZONE BLISS SPILLAR/FM 1626 INTERCHANGE
MOPAC INTERCHANGE
BIOFILTERS
PARKWAY ALIGNMENT
Living Parkway
![Page 10: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/10.jpg)
THE PARKWAYLIVING
BLISS SPILLAR/FM 1626 INTERCHANGE
PARKWAY ALIGNMENT
MOPAC INTERCHANGE HIGHLY SENSITIVEZONE BLISS SPILLAR/FM 1626 INTERCHANGE
Living Parkway
![Page 11: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/11.jpg)
THE PARKWAYLIVING
HIGHLY SENSITIVE ZONE
PARKWAY ALIGNMENT
MOPAC INTERCHANGE HIGHLY SENSITIVE ZONE BLISS SPILLAR/FM 1626 INTERCHANGE
Living Parkway
![Page 12: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/12.jpg)
THE PARKWAYLIVING
HIGH SENSITIVITY ZONE OVERVIEW
BEAR
CREEK
BRIDGE
MODULE MODULE MODULE MODULE
![Page 13: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/13.jpg)
THE PARKWAYLIVING
HIGH SENSITIVITY ZONE OVERVIEW
BEAR
CREEK
BRIDGE
HIGH
POINT
HIGH
POINT
HIGH
POINT
HIGH
POINT
HIGH
POINT
![Page 14: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/14.jpg)
THE PARKWAYLIVING
HIGH SENSITIVITY ZONE OVERVIEW
BEAR
CREEK
BRIDGE
HIGH
POINT
HIGH
POINT
HIGH
POINT
HIGH
POINT
LOW
POINT
LOW
POINT
LOW
POINTLOW
POINT
HIGH
POINT
![Page 15: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/15.jpg)
THE PARKWAYLIVING
HIGH
POINT
HIGH
POINT
HIGH
POINT
HIGH
POINT
LOW
POINT
LOW
POINT
LOW
POINTLOW
POINT
HIGH
POINT
HIGH SENSITIVITY ZONE OVERVIEW
CLAY
CAPS
BEAR
CREEK
BRIDGE
![Page 16: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/16.jpg)
THE PARKWAYLIVING
HIGH SENSITIVITY ZONE OVERVIEW
![Page 17: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/17.jpg)
SECTION ALONG BIOFILTER
LIVING THE PARKWAY
![Page 18: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/18.jpg)
3-SIDED CULVERT AT LOW POINT
LIVING THE PARKWAY
SECTION ALONG BIOFILTER
![Page 19: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/19.jpg)
SECTION ALONG BIOFILTER
LIVING THE PARKWAY
SECTION THROUGH BIOFILTER
![Page 20: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/20.jpg)
SECTION THROUGH BIOFILTER
SECTION ALONG BIOFILTER
LIVING THE PARKWAY
![Page 21: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/21.jpg)
THE PARKWAYLIVING
LIVING PARKWAY STORMWATER SYSTEMS POLLUTANT REMOVAL
QUANTITY
TREATED
TOTAL SUSPENDED
SOLIDS REMOVAL
PHOSPHORUS
REMOVAL
NITROGEN
REMOVAL
LEAD
REMOVAL
BACTERIA
REMOVAL
PERMEABLE FRICTION
COURSE
All Stormwater 75% 48% - 91% -
GRASSY SWALE All Stormwater 65% 10-25% 0-15% 20-50% -
RAINWATER HARVESTING First 1/8” 100% 100% 100% 100% 100%
BIOFILTRATION First 1-1.25” 97% 94% 83% - 98%
GRASSY SWALE UNDERGROUND CISTERNPERMEABLE FRICTION COURSE BIOFILTER
![Page 22: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/22.jpg)
THE PARKWAYLIVING
TRADITIONAL ROADWAY STORMWATER DIAGRAM
BIOFILTER
CENTRALIZED
STORM POND
LIVING ROADWAY STORMWATER DIAGRAM
CENTRALIZED
STORM POND
STORMWATER PIPING
BIOFILTER BIOFILTER BIOFILTERS BIOFILTER BIOFILTER BIOFILTER
![Page 23: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/23.jpg)
THE PARKWAYLIVING
BEAR CREEK
Winter View
Summer View
![Page 24: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/24.jpg)
THE PARKWAYLIVING
BRIDGE PLAN
SECTION
TRADITIONAL BRIDGE SECTION
![Page 25: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/25.jpg)
LIVING BRIDGE SECTION
THE PARKWAYLIVING
SECTION
BRIDGE PLAN
1 Column Only in Flood Plain
![Page 26: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/26.jpg)
THE PARKWAYLIVING
LIVING BRIDGE SECTION MODULAR DESIGN
LIVING BRIDGE PROCESS
![Page 27: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/27.jpg)
THE PARKWAYLIVING
![Page 28: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/28.jpg)
THE PARKWAYLIVING
BLISS SPILLAR/FM 1626 PLAN
ELIMINATE U-TURN
ELIMINATE FREE
RIGHTS
ENTRANCE/ EXIT
RAMPS
SINGLE INTERSECTION
BIOFILTERS
![Page 29: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/29.jpg)
THE PARKWAYLIVING
MOPAC INTERCHANGE PLAN
BYPASS LANES
BIOFILTERS
ROUND-ABOUT
![Page 30: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/30.jpg)
THE PARKWAYLIVING
MOPAC INTERCHANGE PLAN
TOLL GANTRIES
PUBLIC ART
OPPORTUNITY
![Page 31: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/31.jpg)
THE PARKWAYLIVING
TRAILS PLAN
PROPOSED COA BIKE FACILITY
BEAR CREEK BRIDGE
PROPOSED COA BIKE FACILITY
COA
CONSERVATION
LAND
![Page 32: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/32.jpg)
THE PARKWAYLIVING
TRAILS PLAN
PROPOSED COA BIKE FACILITY
BEAR CREEK BRIDGE
PROPOSED COA BIKE FACILITY
COA
CONSERVATION
LAND
![Page 33: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/33.jpg)
THE PARKWAYLIVING
TRAILS PLAN
PROPOSED COA BIKE FACILITY
BEAR CREEK BRIDGE
PROPOSED COA BIKE FACILITY
COA
CONSERVATION
LAND
![Page 34: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/34.jpg)
THE PARKWAYLIVING
TRAILS PLAN
PROPOSED COA BIKE FACILITY
BEAR CREEK BRIDGE
PROPOSED COA BIKE FACILITY
COA
CONSERVATION
LAND
![Page 35: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/35.jpg)
THE PARKWAYLIVING
COST ESTIMATE
CONSTRUCTION ITEMTRADITIONAL ROADWAY COST
LIVING PARKWAY WITH
TRADITIONAL BRIDGE & IRRIGATION
LIVING PARKWAY
WITH LIVING BRIDGE & RAINWATER TANKS
SITE PREPARATION $2,700,000 $1,080,000 $1,080,000
EMBANKMENT (FILL MATERIAL $500,00 $950,000 $950,000
EXCAVATION (CUT MATERIAL) $300,000 - -
PAVEMENT $18,000,000 $13,000,000 $15,000,000
PFC ASPHALT - $10,000,000 $10,000,000
STORM DRAIN SYSTEM $1,500,000 - -
CONCRETE WATER QUALITY PONDS $1,750,000 - -
BIOFILTERS - $2,500,000 $2,500,000
IRRIGATION FOR BIOFILTERS - $200,000 -
RAINWATER CAPTURE SYSTEM - - $1,250,000
TRADITIONAL BRIDGE AT BEAR CREEK $4,100,000 $4,100,000 -
LIVING BRIDGE AT BEAR CREEK - - $7,550,000
TOLL FACILITY $650,000 $500,000 $500,000
CONNECTION TO LOOP 1 WITH FLYOVER $3,600,000 - -
CONNECTION TO LOOP 1 WITH ROUNDABOUT - $2,220,000 $2,220,000
BASE ROADWAY COST $18,300,000 $18,300,000 $18,300,000
TOTAL COST $51,400,000 $53,000,000 $59,350,000
![Page 36: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/36.jpg)
THE PARKWAYLIVING
FLY OVER
![Page 37: Klatz Associates Final Presentation for the Green Mobility Challenge](https://reader033.fdocuments.us/reader033/viewer/2022060202/559cc5a51a28abc4368b45dc/html5/thumbnails/37.jpg)
LIVING
An Innovative Plan for the Manchaca Expressway
Living Parkway: a roadway designed to utilize and contribute
to the natural processes of the landscape it inhabits( )
THE PARKWAY