Head Office : Jl H. Saikin 12 Pondok Pinang, Kebayoran Lama, Jakarta Selatan 12310Phone : 021 7694487, 75913175, 75914036 Fax. 021 75914036
Website : www.klaras.co.id email : [email protected]
VISSION
To support our client, to meet their project goals thru the provision of our reliable, innovative, competitive services using the best international practices in safety manner
MISSION
• To provide an innovative solution in engineering, procurement, construction, installation of processing equipments, instrumentations,automation and controls,electrical and maintenance services for customers
• Continually to improve competency of technology, organization and culture
• To perform a good and clean governance of organization• To provide added values to customers, employee,
shareholders, and society
Religious Professional EmployeeTo work with excellent integrity, responsibility, ethics, team working type and morality
Quality, Health and SafetyTo put in first priority of Quality, Health and Safety for every step of working
Learning
To put learning as a culture
Social ResponsibilityTo provide prosperities to employee, society and humanity
Philosophy and Values
Line of Business Pathway
FY2002 TradingVibration
Monitoring
FY2003 TradingVibration
MonitoringCondition
Monitoring ServiceAutomation
FY2004 TradingVibration
MonitoringCondition
Monitoring ServiceAutomation
FY2005 TradingVibration
Monitoring
Operation & Maintenance
ServiceAutomation
Mechanical Package
FY2006 TradingVibration
Monitoring
Operation & Maintenance
ServiceAutomation
Mechanical Package
Procurement & Construction
FY2007 TradingE/I &
Automation
Operation & Maintenance
ServiceRental Service
Mechanical Package
EPCI
FY2008 TradingE/I &
Automation
Operation & Maintenance
ServiceRental Service
Mechanical Package
EPCI
FY2009 TradingE/I &
Automation
Operation & Maintenance
Service
Mechanical Package
EPCI
FY2010 TradingE/I &
AutomationMechanical Package
EPCI
FY2011 TradingE/I &
AutomationMechanical Package
EPCI
FY2012
IPP Natural
Gas Based
CNG Ownership &
Operator
Gas Transport & Pipeline
Line of Business
KLARAS PUSAKA INTERNASIONAL• Engineering, Procurement, Construction and Installation (EPCI)• Mechanical Package• Fabrication Services
KLARAS PUSAKA INSTRUMINDO• EPCI for Electrical and Instrumentation• Automation, SCADA and Telemetry• Liquid and Gas Metering System• Online Vibration Monitoring System• Wellhead Control Panel & Other Pneumatic/Hydraulic
Control Panel
ARTHA GAS ENERGI• Natural Gas based IPP Project Investment• CNG Ownership & Operator• Investment in Gas Transportation & Pipeline
Certifications
• ISO 9001:2008 (by Lloyd Register)
• MIGAS Registered for Construction of Mechanical and Electrical
• MIGAS Registered for Fabrication of Pressure Vessel and Piping Spool
• Apresiasi Domestic Product (ADP) certificate for 20 different scopes of systems integration and electrical/mechanical package
• OHSAS 18001 : 2007 (Sistem Manajemen Keselamatan & Kesehatan Kerja) from Sucofindo
• Indonesia Integrated Contractor Association (SBU - AKTI) for Jasa Konstruksi Terintegrasi
• Asosiasi Kontraktor Listrik Indonesia (SBU – AKLI) for Electrical & Instrumentation
Pemasangan Fasilitas Water Treatment di Struktur Ketaling Barat, Pertamina Jambi
CLIENT :PERTAMINA UBEP JAMBIPROJECT TITLE :PEMASANGAN FASILITAS WATER TREATMENTDI STRUKTUR KETALING BARAT, JAMBIPROJECT DURATION : Aug 09 – Jun 10SCOPE OF WORK :ENGINEERING PROCUREMENTINSTALLATIONTESTING AND COMMISSIONING
In order to increase oil and gas production, PT Pertamina EP Region Sumatra built new Water Treatment Plant at Struktur Ketaling Barat, Area Jambi. This field located approximately 40 KM, east of Kodya Jambi, and usage for accommodate and separate between oil and water from oil wells at Struktur Ketaling Barat and planned for the capacity of 10,000 barrel per day.
This facilities consist of: - Pipeline system, diameter 8”, 10” and 12”, with the total length of 6000 meters.- 5 EA Tank with capacity of 3500 barel, consist of Oil tank, Water tank and Test tank- 1 EA FWKO- 1 EA Gas Scrubber, #300, diameter 800 mm, height 2100 mm- 3 EA Separator, #300, diameter 1100 mm, length 2400 mm
The scope of work including surface preparation, blasting, painting, coating, civil work, NDT test, etc
EPC CNG PLANT JAKABARING - PALEMBANG
The facility was built with the objective to supply gas for PLTG Jakabaring; Gas Turbine operation based; for Peak hours (6 hours from 18:00 to 24:00 each day). During 18 hours (00:00 to 18:00) the coming gas (from MEDCO through Pertagas Pipeline), 3 MMSCFD, 30 bar, are compressed and stored at 250 bar pressure. During peak hours, the stored gas is depressurized into 27-30 bar and flow to PLTG 40MW.
The scope including Engineering, Procurement, Construction for CNG Plant including Civil & Structure works, Mechanical Installation, Piping works, Electrical & Instrument works, Commissioning & Start-Up.
The main facilities including:- Gas Meter- 2 unit x 7,000 Nm3/h Gas Dryer- 4 unit x 2,000 Sm3/h CNG Compressor- 22 skid x 5,300 m3 CNG Storage Skid (40ft length)- 4 unit x 5,000 m3/h Pressure Reducing Unit- 4 unit x 130kW Water Heater Package- 2 unit x 1MW Gas Engine Genset
CLIENT :PT DARUMA MITRA ALAMPROJECT TITLE :EPC CNG PLANT JAKABARINGPROJECT DURATION : Dec 2011– Jan 2013SCOPE OF WORK :ENGINEERING, PROCUREMENT,
CONSTRUCTION, INSTALLATION, COMMISSIONING
EPC CNG PLANT JAKABARING - PALEMBANG
The facility is built with the objective to supply gas for PLTG Jakabaring; Gas Turbine operation based; for Peak hours (6 hours from 18:00 to 24:00). The gas in coming from MEDCO (through Pertagas Pipeline) 3 MMSCFD for 18 hours per day (00:00 to 18:00).
The facilities including:- Metering- 2 unit x 7,000 Nm3/h Gas Dryer- 4 unit x 2,000 Sm3/h CNG Compressor- 22 skid x 5,300 m3 CNG Storage Skid (40ft length)- 4 unit x 5,000 m3/h Pressure Reducing Unit- 4 unit x 130kW Gas Boiler Package- 2 unit x 1MW Gas Engine Genset- Civil & Structure Works- Piping System (gas)- Fire Water System
CLIENT :PT DARUMA MITRA ALAMPROJECT TITLE :EPC CNG PLANT JAKABARINGPROJECT DURATION : Dec 2011– Aug 2012SCOPE OF WORK :ENGINEERING, PROCUREMENT,
CONSTRUCTION, INSTALLATION, COMMISSIONING
EPC CNG PLANT JAKABARING - PALEMBANG
Pressure Reducing Unit Gas Scrubber & Gas Meter Gas Dryers
Water Heater CNG Compressors CNG Storage Skid
GROUND FLARE FACILITIES PROJECT EXPERIENCE
CLIENT :PT INDOLAS PRATAMA – PERTAMINA EP REGION JAWAPROJECT TITLE :EPC OF HORIZONTAL GROUND FLARE FACILITIES AT TAMBUN AREA FIELD SUBANGPROJECT DURATION : April – Oct 2007SCOPE OF WORK :DESIGN, PROCUREMENT, FABRICATION, CONSTRUCTION, COMMISSIONING, START UP
Tambun Area has existing flare stack with capacity 15 MMSCFD. However this flare system has been considered to cause danger for the Pertamina personnel work inside plant (very small area), control room near the flare, and environment beside of plant (residence, agriculture plant, etc.). This is because the heat radiation, gas radiation and noise radiation because of height of stack.
Hence Pertamina EP plans to replace the existing flare stack and build new Ground Horizontal Flare at Tambun Area Field Subang capable to handling 15 MMSCFD gas relief. The flare pit numbers divided into 18 points. Around of these flare pits had been built concrete wall/fencing with height of 3m.
The overall project scope including design, procurement, fabrication and construction of flare pit, KO Drum, piping system, tie-ins to existing flare line pipe, pumping system, control panel, civil construction (land/ground preparation, etc.), drainage, lightning & grounding system, commissioning and start up.
TOPSIDE PROCESS EQUIPMENT PROJECT C/W ENGINEERING SUBSEA PIPELINE AND SKID PACKAGE SYSTEM
Glagah Kambuna field located approximately 70 km offshore North East of Medan, North Sumatera. The development consist of Wellhead Platform (produce gas and condensate), 57 km 14” offshore pipeline, Onshore Receiving Facilities, and Onshore pipeline.
The topside process facilities consist of: Production Wells WHK-02/03/04, one flow line per well (each containing a flow meter, chemical injection points and actuated choke valve, check valve and header isolation valve), a production header (containing corrosion coupon, chemical injection, temperature indication, 2-out-of-3 pressure indication/ESD points), pig launcher and pig receiver (onshore), last valve-off shutdown valve, open drain tank (c/w drain hose reel), vent system, WHCP (hydraulic c/w N2 pressured fusible loop fire detection), N2 bottle tanks, instrument gas system (including scrubber, relief, drain, shut-down and nitrogen back-up), corrosion inhibitor & methanol injection systems, piping system, power system (including solar panels/regulator and battery bank), PLC communication panel, base for 20m antenna mono-pole, pedestal crane.
The scope also including: detail engineering, fabrication, construction, blasting painting, piping system, QA/QC, NDT, sea-fastening, transportation, mob-demob, calibration, testing, inspection, mechanical completion, pre-commissioning, etc.
CLIENT :ASIA PETROLEUM DEVELOPMENT (GLAGAH KAMBUNA) LTDPROJECT TITLE :FABRICATION AND INSTALLATION KAMBUNATOPSIDE PROCESS EQUIPMENT AND ASSOCIATED SYSTEMS c/w ENGINEERINGSUBSEA PIPELINE & CHEMICAL INJECTION SKIDPROJECT DURATION : JUL – DEC 2008SCOPE OF WORK :TRANSPORTATION, ENGINEERING,FABRICATION, CONSTRUCTION, INSTALLATION, DELIVERY, COMMISSIONING.
METERING SYSTEM PACKAGE
CLIENT :YOKOGAWAPROJECT TITLE :METERING SYSTEMPROJECT DURATION : March - April 2005SCOPE OF WORK : DESIGN REVIEW CONSTRUCTION & FABRICATION ASSEMBLY TESTING PACKING & DELIVERY
The scope is Review of Engineering Design, Procurement of Material, Fabrication, Assembling, and Testing of Metering System on sales gas pipeline. Total quantity is 7 (seven) metering system packages. The scope of work is including packing and delivery to Client yard. Also on site installation and commissioning. Total Weight of package is 7 tons.
The metering package size are 8 inch and 10 inch.
CHEMICAL INJECTION PACKAGE
CLIENT : MAN FERROSTAALPROJECT TITLE : CHEMICAL INJECTION PACKAGE, EARLY PRODUCTION FACILITIES, BANYU URIP DEV PROJECT, EXXON.PROJECT DURATION : JAN ‘09 – JUL ‘09SCOPE OF WORK : DESIGN & PROCUREMENT FABRICATION & ASSEMBLY PACKING AND DELIVERY SITE INSTALLATION TESTING AND COMMISSIONING
This project consist of 3 packages of Chemical Injection, and each package consist of 6 m3 chemical tank, 5 ea injection pump, 5 ea pulsation dampener, skid package, control panel device and its accessories.
The scope of services covering design, procurement of material, fabrication and shop erection, assembly, surface preparation, painting, pipe spool on skid, coating, shop and onsite testing, Packing, marking and transportation to client shop, inspection of site installation, Start-Up and Commissioning.
Design, Fabrication and Installation of Scrubber, Bottle, Heat Exchanger & Piping System Experience
CLIENT :PERTAMINA EP REGUON JAWAPROJECT TITLE :PEKERJAAN DESIGN, FABRIKASI DAN INSTALASI SCRUBBER, BOTTLE, HEAT EXCHANGER & PIPING SYSTEM PADA STASIUN KOMPRESSOR DI SK KHTPROJECT DURATION : Nov 07 – May 08SCOPE OF WORK :DESIGN, FABRICATIONINSTALLATION, DELIVERY, TESTINGCOMMISSIONING
The overall scope covering design, fabrication, installation, testing and commissioning of a Scrubber Package, Bottle, Heat Exchanger including delivery to site at Pertamina EP Region Jawa, Field Kandang Haur Timur.
The scope of work including piping system, electrical and instrumentation system, control panel system, local monitoring, grounding system, skid package, civil work such as drainage system, building and foundation for all equipment.
Klaras also responsible for performance system warranty for period of 6 months after commissioning.
INSTRUMENT GAS PACKAGE
CLIENT :UNOCAL INDONESIAPROJECT TITLE :INSTRUMENT GAS PACKAGE FOR SAPI PLATFORM DEVELOPMENTPROJECT DURATION : Aug 2005 – Feb 2006SCOPE OF WORK :DESIGNFABRICATIONTESTING AND INSPECTIONDELIVERYSTART UP AND COMMISSIONING
SAPI Gas Platform Development - Unocal requires Instrument Gas Package to be installed on the platform. Klaras awarded to design, procurement, fabrication, testing and inspection, packing and delivery to Unocal warehouse. Also site commissioning and start up including our scope of work. Engineering design covering detail design engineering, process calculation (instrument calculation, PSV calculation, sizing calculation for vessel, etc) and structural design.This package consist of Gas Scrubber, Gas Dryer, pre filter and after filter.
PIG LAUNCHER AND PIG RECEIVER
CLIENT :BP WEST JAVAPROJECT TITLE :PIG LAUNCHER AND RECEIVER FOR ECHO AND BRAVO PLATFORMSPROJECT DURATION : April - July 2009SCOPE OF WORK :DESIGNFABRICATIONINSPECTION AND TESTINGQUALITY ASSURANCEPACKING AND DELIVERY
The scope is Engineering, Procurement of Material, Fabrication, Assembling, Inspection and Testing of various size of Receiving and Launching facilities on sales gas pipeline; Pig Launcher and Receiver. Total quantity is 8 (eight) pig launcher and receiver. The vessels are designed and fabricate as per ASME VIII Div 1 latest edition. The scope of work is including delivery to BP Marunda warehouse and on site installation supervision and commissioning.
The pig launcher receiver size varies from 8 to 10 inch; design for vertical and horizontal installation position, complete with Closure (quick opening closure), painting and coating with BP offshore standard, and hydro test testing (MIGAS certification).
INERGEN FIRE SUPPRESSION SYSTEM
CLIENT :PT GUNANUSA FOR TOTAL E&P INDONESIEPROJECT TITLE :INERGEN TOTAL FLOODING FOR PECIKO 11 DEVELOPMENT PROJECTPROJECT DURATION : Sept 08 – Feb 09SCOPE OF WORK : DESIGN & PROCUREMENTFABRICATIONPACKING AND DELIVERYINSPECTION OF SITE INSTALLATIONTESTING AND COMMISSIONING
The equipment designed to be compliance with TOTAL’s specification for Inergen Total Flooding System with 200 barg for cylinder bottle. The Inergen Total Flooding Package consist of inergen cylinders with manifold and accessories on structural skid, piping & fitting downstream, discharge nozzle, local and status panel c/w instrumentation devices, wiring, cabling and instrumentation connection to Fire & Gas system cabinet, cylinder handling and others installation devices.The scope of services covering design, procurement of material, fabrication and shop erection, assembly, surface preparation, painting, coating, shop and onsite testing, Packing, marking and transportation, inspection of site installation, Start-Up and Commissioning.
DIESEL FIRE PUMP PACKAGE
CLIENT :CNOOC SES LTDPROJECT TITLE :DIESEL FIRE PUMP FOR ZELDA PLATFORM, CNNOC SES LtdPROJECT DURATION : Apr ‘08 – Jan 2009SCOPE OF WORK :DESIGN & PROCUREMENTFABRICATION & ASSEMBLYPACKING AND DELIVERYINSPECTION OF SITE INSTALLATIONTESTING AND COMMISSIONING
This equipment designed with capacity 2500 GPM and comply to UL FM standard. This Diesel Fire Pump Package consist of fire water pump c/w diesel engine with dual starter (electric and pneumatic starter), two (2) sets of air receiver tank, panel control system, electrical device, pneumatic device, wiring and cabling connection to existing system.
The scope of services covering design, procurement of material, fabrication and shop erection, assembly, surface preparation, painting, coating, pipe spool, shop and onsite testing, Packing, marking and transportation to client shop, inspection of site installation, Start-Up and Commissioning.
Construction of Tank S-987 Pertamina
CLIENT : PERTAMINA UBEP LIRIKPROJECT TITLE : TANK CONSTRUCTION S-987PROJECT DURATION : Oct – Dec 2008SCOPE OF WORK : DESIGN FABRICATION INSTALLATION TESTING & COMMISSIONING DELIVERY DOCUMENTATION
The overall scope covering design, fabrication, installation, testing and commissioning of a Storage Tank, including delivery to site at Pertamina EP Lirik, Pekanbaru, Kepulauan Riau. The capacity of storage tank is 10.000 BBLS.
The scope of work consist of civil work such as cut and fill, foundation, tank accessories such as ladder, platform, lighting system, grounding system, lightning system, pumping system, piping system, pipe spool and connection to tie in point.
Klaras also responsible for warranty for period of 6 months after commissioning.
BOOSTER COMPRESSOR CONTROL PANEL
CLIENT : PT WAIJO, TUBAN AROMATIC PROJECT TPPI, TUBANPROJECT TITLE : BOOSTER COMPRESSOR CONTROL PANEL, TUBAN AROMATIC PROJECTPROJECT DURATION : Jan ‘05 – Jul 2005SCOPE OF WORK : DESIGN & PROCUREMENT FABRICATION & SITE INSTALLATION TESTING AND COMMISSIONING TRAINING
The scope of services covering design, procurement of material, fabrication and shop erection, assembly, shop and onsite testing, packing and delivery to site, site installation, start-Up and Commissioning, training for field personnel.
ELECTRICAL INSTRUMENTATION PACKAGE
CLIENT :PT ELNUSA TbkPROJECT TITLE :EI PACKAGE CONSTRUCTION PROJECT,SANTAN FIELD DEVELOPMENT, CHEVRONPROJECT DURATION : JUN – DEC 2009SCOPE OF WORK :DESIGNFABRICATIONINSTALLATIONTESTING & COMMISSIONINGDOCUMENTATION
The overall scope covering design, fabrication, installation, testing and commissioning of Electrical and Instrumentation System for Santan Field Development Project, Chevron Indonesia Company.
The scope of work consist of civil work such as cut and fill, foundation, tank accessories such as ladder, platform, lighting system, grounding system, lightning system, pumping system, piping system, pipe spool and connection to tie in point.
Klaras also responsible for warranty for period of 3 months after commissioning.
AUTOMATION SYSTEM INSTALLATION FOR WEST SENO FPU SAND CLEANING SYSTEM PROJECT
CLIENT :CHEVRON INDONESIA COMPANYPROJECT TITLE :AUTOMATION SYSTEM INSTALLATION FORWEST SENO FPU SAND CLEANING SYSTEMPROJECT DURATION : AUG 2007 – DEC 2007SCOPE OF WORK :FABRICATIONINSTALLATIONTESTING & COMMISSIONINGDOCUMENTATION
The overall scope covering design, fabrication, installation, testing and commissioning of Electrical and Instrumentation System for Santan Field Development Project, Chevron Indonesia Company.
The scope of work consist of civil work such as cut and fill, foundation, tank accessories such as ladder, platform, lighting system, grounding system, lightning system, pumping system, piping system, pipe spool and connection to tie in point.
Klaras also responsible for warranty for period of 3 months after commissioning.
Subsea Pipeline Engineering
CLIENT :ASIA PETROLEUM DEVELOPMENT
(GLAGAH KAMBUNA) LTDPROJECT TITLE :KAMBUNA PIPELINE DETAILED
ENGINEERING SERVICESPROJECT DURATION :Dec ‘07 – August 2008SCOPE OF WORK :Detailed Engineering
Kambuna field development phase-1 will focus on early wet gas production, utilizing a minimal free-standing wellhead platform and wet gas export pipeline. The wellheads, will be piped to a manifold on the WHS, production will be cooled and then directed into the riser attached to the WHS, before entering the export pipeline to shore.
The detailed engineering scope covering of: Pipeline Design Philosophies, Route Selection (offshore and onshore), QRA Study, Hydraulic Analysis, Corrosion Analysis, Pipeline Appurtenance Design, In-place Stress and Flexibility Analysis, In-place Stability Analysis, Pipeline and Appurtenance Specification, Data Sheets and MTO, Construction and Testing Report, Operations Manual, Transient Analysis (including FEA/Lateral Buckling Assessment, Blowdown Analysis, Relief Study, Hydrate Formation Study), Pipeline Transient Line Pack Study.
EPC CNG PLANT DURI - RIAU
The facility was built with the objective to supply gas for PLTG Duri; Gas Turbine operation based; for Peak hours (6 hours from 18:00 to 24:00 each day). During 18 hours (00:00 to 18:00) the coming gas 6 MMSCFD, 30 bar, are compressed and stored at 250 bar pressure. During peak hours, the stored gas is depressurized into 27-30 bar and flow to PLTG.
The scope including Engineering, Procurement, Construction for CNG Plant including Civil & Structure works, Mechanical Installation, Piping works, Electrical & Instrument works, Commissioning & Start-Up.
CLIENT :PT DARMA PRATAMA SEJATIPROJECT TITLE :EPC CNG PLANT DURIPROJECT DURATION : Dec 2012– Nov 2013SCOPE OF WORK :ENGINEERING, PROCUREMENT,
CONSTRUCTION, INSTALLATION, COMMISSIONING
Proyek PGN paket 4
Proyek Rawa Power Generator
Proyek PGN Paket 7
SAFETY LEADERSHIP F045-12 PEMINDAHAN STASIUN PASAR IX DAN FASILITASNYA
TOP MANAGEMENT MEMBERIKAN MOTIVASI PENTINGNYA KESELAMATAN
SAFETY LEADERSHIP F045-12 PEMNDAHAN STASIUN PASAR IX DAN FASILITASNYA
SAFETY REWARD
SAFETY LEADERSHIP F045-12 PEMINDHAN STASIUN PASAR IX DAN FASILITASNYA
DISKUSI
DOKUMENTASI EMERGENCY DRILL DI HEAD OFFICE17 DESEMBER 2013
Petugas evakuasi melakukan evakuasi ke pekerja
Petugas evakuasi melakukan evakuasi terhadap pekerja yang cidera
Petugas P3K melakukan pertolongan pertama ke pekerja yang terkena cidera
Ketua tanggap darurat melakukan pengecekkan jumlah pekerja
Top management memberikan safety contact ke pekerja
BUSINESS OPPORTUNITY
BUSINESS OPPORTUNITY WITH US
We need subcontractor for civil, mechanical and electrical to support our supply chain strategy
We look for partners in natural gas and renewable energy sector of investment