K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM...
2
Transcript of K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM...
![Page 1: K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM BIO s.r.o. implemented a biogas power station project in Ladzany, Slovakia. The biogas](https://reader035.fdocuments.us/reader035/viewer/2022070112/6051b5b24579b32403111ce4/html5/thumbnails/1.jpg)
![Page 2: K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM BIO s.r.o. implemented a biogas power station project in Ladzany, Slovakia. The biogas](https://reader035.fdocuments.us/reader035/viewer/2022070112/6051b5b24579b32403111ce4/html5/thumbnails/2.jpg)