Kingston Waterfront Plan

29
City of Kingston Waterfront Revitalization Program Waterfront Advisory Committee Update December 15, 2011

Transcript of Kingston Waterfront Plan

Page 1: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 1/29

CityofKingstonWaterfront

RevitalizationProgramWaterfront Advisory Committee Update 

December 15, 2011

Page 2: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 2/29

Congratulations!• The Hudson River Maritime Center/Sloop Clearwater proposal 

for 

construction 

of  

HomePort facility 

has 

been 

funded 

by 

New York State!

• This is a key project for Kingston’s Waterfront Revitalization 

and will help advance and leverage additional projects and 

investment.

Page 3: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 3/29

HomePort 

Page 4: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 4/29

StructuralDesigns

Page 5: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 5/29

ReviewofProgressToDate

Local 

Waterfront 

Revitalization 

PlanState and local Waterfront Policies

Local Waterfront Revitalization Implementation Plan

Vision for

 the

 Waterfront

 with

 Implementation

 Steps

“Must Do” Projects

Brownfield Opportunity Area Program

Activities of  Private, Cultural and Commercial Partners

Page 6: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 6/29

ProjectstoAdvancetheLWRP• Public Infrastructure

• Sewer Treatment Plant Odor Mitigation

• Construction of 

 Bulkhead

• Construction of  Promenade

• Reconstruction of  Broadway Median

• Reconstruction of  East Strand Median (20 new parking 

spaces)• Construction of  Public Parking Lot  (50 new parking spaces)

• Erosion Control Measures for Kingston Point

• Reinforcement of  Footbridge to Kingston Point Park

• Façade Improvements

 Trolley

 Museum

 building

• Improvements to Gallo Park

• Improvements to Kingston Public Docking Area (Rip Van 

Winkle)

Page 7: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 7/29

ProjectstoAdvancetheLWRP• Analyses and Designs

Rondout 

Parking 

and 

Circulation 

Study• Dayline Dock Replacement Concept Design

• Kingston Sewer Plant Façade Design

• Rondout Harbor Management Plan (Army Corps of  Eng.)

• Environmental Site

 Analyses

 Level

 I

• Ferry Feasibility Study

• Sewer Treatment Plan Façade Construction

• Waterfront Rail Refurbishment Project

Upcoming Projects• Stormwater and Flooding Engineering Management Plan

• Generic Environmental Impact Statement

Page 8: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 8/29

GrantSources• New York State Department of  State

New York

 State

 Office

 of 

 Parks,

 Recreation

 and

 Historic

 Pres.

• Hudson Valley Greenway

• Empire State Development

• Army Corps of  Engineers

• New York State Department of  Transportation

• New York State Department of  Environmental Conservation

• U.S. Department of  Housing and Urban Development

• Federal Highway

 Administration

• Federal Railroad Administration

• Local Initiative Items from local elected representatives• Estimated Grant Funding Total for these projects $6,200,000 +

Page 9: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 9/29

PrivateInvestment 

• Restaurants

• Shops

• Marinas

• Cultural Institutions

• Property Investment

• Estimated Private Investment • $16‐20,000,000

Page 10: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 10/29

InterimResults• Sewer Treatment Plant Odor Mitigation has led to less 

problems and complaints 

• Visual Improvements on East Strand and Waterfront

• Oil Tanks Removed

• Auto Recycling Facility Cleared

• Brownfield Clean

‐up

 Agreements

 In

 Place

 on

 2 properties

• Kingston Point Stabilized

• Walkway completed from Ravine Street and connects with 

other 

walkways 

to 

the 

Steel 

House‐

it 

will 

pass 

the 

new 

HomePort project

• 75 new public parking spaces provided

• Increased visitation and business activity reported

Page 11: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 11/29

What’sOnDeckfor2012‐2013

Sewer Treatment Plant Façade Design and Construction

Waterfront Rail Refurbishment Grant

Flooding and Stormwater Management RFP

Brownfield Opportunity Area Generic Environmental 

Impact Statement

Page 12: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 12/29

WaterfrontPlanningProcess• The LWRP set policies for the revitalization;

• The Implementation Plan listed public and private actions to 

accomplish the

 revitalization;

• Using grant funding, feasibility studies, construction designs 

and actual construction projects are undertaken.

• Plans and studies (LWRP IP, BOA, Ferry Feasibility, Harbor Management;

 Stormwater and

 Flooding

 Engineering)

 are

 all

 

meant to be components of  the upcoming GEIS which will predict build out levels and analyze the environmental impacts, the infrastructure requirements, the mitigation of  

brownfield areas,

 plan

 for

 the

 impact

 of 

 water

 rise

 and

 periodic flooding as well as an updated economic study.  This 

will help foster implementation of  the revitalization on a 

shorter timetable.

Page 13: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 13/29

IconicWestStrand

Page 14: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 14/29

FormerRecyclingYard

Page 15: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 15/29

Forst MeatPackingFacility‐ Gone

Page 16: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 16/29

KingstonPointConditons

BeforeErosionControlProject 

Page 17: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 17/29

KingstonPointParkFootbridge

Page 18: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 18/29

OilTerminalBeforeRemoval

Page 19: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 19/29

OilTanksBeforeandAfter

Page 20: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 20/29

PromenadeConcept 

Page 21: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 21/29

WaterfrontPromenadeSite

BulkheadWorkCommencing

Page 22: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 22/29

CompletedPromenade

Page 23: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 23/29

PromenadeRibbonCutting

Page 24: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 24/29

KingstonBeachPavilion

Page 25: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 25/29

TheDayline Dockinit’sHeyday

Page 26: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 26/29

Dayline DockReplacementConcept 

Page 27: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 27/29

FerryFeasibilityStudy

Page 28: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 28/29

EastStrandMedianandParking

Page 29: Kingston Waterfront Plan

8/3/2019 Kingston Waterfront Plan

http://slidepdf.com/reader/full/kingston-waterfront-plan 29/29

KingstonWaterfrontProgress

• With the help of  NYSDOS, NYSOPRHP, DOT, FHWA, GREENWAY, 

the Waterfront Advisory Committee, Scenic Hudson, 

Clearwater, the Maritime Museum and Trolley Museum, as 

well as

 Mayor

 Sottile

 and

 the

 Common

 Council,

 progress

 has

 

been made over these last 10 years.

• There are still projects and challenges that lie ahead, and with 

continued momentum

 and

 funding,

 the

 revitalization

 will

 be

 

advanced.

Kingston 

is 

indeed 

 jewel 

on 

the 

Hudson, 

with 

the 

best 

waterfront in terms of  the harbor reach, public access, events 

and open space.