KINGSTON POINT RAIL TRAIL FEASIBILITY STUDY
![Page 2: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/2.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Kingston Point Rail Trail
![Page 3: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/3.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Existing Planning Documents• Ulster County Non-Motorized Plan• Ulster-Delaware Rail Trail Feasibility
Study• Management Plan for the Kingston
Point Rail Trail• City of Kingston Action Plan• Kingston Local Waterfront
Revitalization Program and Implementation Plan
• City of Kingston Comprehensive Plan• Kingston Urban Cultural Park• Complete Streets SWOT Analysis
![Page 4: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/4.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Opportunities and Constraints
![Page 5: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/5.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Opportunities and Constraints
![Page 6: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/6.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Opportunities and Constraints
![Page 7: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/7.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Engineering & Environmental Assessment
• Existing right-of-way encroachments are minimal• Minimal environmental impacts and no remediation
necessary• Stormwater is a concern since the corridor is the low point;
can be addressed with natural swales along the trail• Structures along the corridor remain in good condition• There are several at-grade crossings where improvements will
be needed to ensure safe conditions• Safety concerns include the length of the tunnel, some steep
slopes and some crossings• Vegetative barriers provide screening for the trail
![Page 8: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/8.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 9: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/9.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 10: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/10.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 11: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/11.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 12: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/12.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 13: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/13.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 14: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/14.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 15: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/15.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 16: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/16.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Conceptual Trail Design
![Page 17: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/17.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Trail Conceptual Design
![Page 18: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/18.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Trail Section• 10’ wide
asphalt path• 2’ shoulders• 8-10’ vertical
clearance• 14’ horizontal
clearance
Figure courtesy of Iowa DOT
![Page 19: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/19.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Rail with Trail Alternatives
![Page 20: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/20.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Rail with Trail Alternatives
![Page 21: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/21.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
Implementation Steps• Public Support
– committee and community engagement• Funding
– Federal, state, and local funding sources, grant applications• Detailed Design
– Construction documents• Permits
– Erosion and Sediment Control Plan – NYSDOT Use and Occupancy Permit
• Construction– Grading, compaction, paving / structural repairs as needed
• Performance Measures– User counts, area economic improvements, and land uses
Total Cost ~ $1.6 Million- Trail, trailheads, and structural repairs included
![Page 22: Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study](https://reader033.fdocuments.us/reader033/viewer/2022051515/557c9f4dd8b42ab4218b4af6/html5/thumbnails/22.jpg)
Kingston Point Rail Trail Engineering and Environmental Assessment
THANK YOU