Phase 2AIn this slide show:
Geothermal wells and first floor mezzanine
July 16, 2011
![Page 2: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/2.jpg)
The additional geothermal wells on the west side installed and connected with the rest of the geothermal network under the plaza.
![Page 3: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/3.jpg)
The west side street repaved and painted with new Amtrak bus queuing boundaries.
![Page 4: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/4.jpg)
The new turn around system will improve Amtrak bus access.
![Page 5: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/5.jpg)
Original under-plaza geothermal wells on the left. New west side wells on the right. Both are now connected for operation.
![Page 6: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/6.jpg)
Grand stair terrazzo treads and rails mobilized onsite for installation.
![Page 7: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/7.jpg)
The new terrazzo treads are beautiful and match the original .
![Page 8: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/8.jpg)
Half the terrazzo treads installed at top of the stair.
![Page 9: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/9.jpg)
Original brass rails installed on the sides of the stairway.
![Page 10: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/10.jpg)
Ticketing desks are being installed.
![Page 11: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/11.jpg)
New ticketing counters match the original appearance.
![Page 12: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/12.jpg)
A view of the drawers behind the ticketing counters.
![Page 13: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/13.jpg)
Additional counters are also being installed behind the ticketing desks.
![Page 14: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/14.jpg)
The mezzanine stairs and lift are fully installed connecting the first floor Amtrak offices to additional space above.
![Page 15: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/15.jpg)
Carpet and lighting are in place for the mezzanine level.
![Page 16: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/16.jpg)
A skilled technician working with the ceiling in the mezzanine.
![Page 17: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/17.jpg)
Carpet installation for Amtrak break room.
![Page 18: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/18.jpg)
Dedicated restrooms for all Amtrak employees.
![Page 19: King Street Station 7.16.11 slide show](https://reader037.fdocuments.us/reader037/viewer/2022103109/546d71eaaf7959ea108b6b57/html5/thumbnails/19.jpg)
A ceiling will be installed to cover these mechanicals under the plaza.