Kimbell Restroom and Storage Building Civic Design Review Phase 2 - Design Development May 21, 2012
Dan Mauer, Project Manager RecreaƟon and Park Department
Tara Lamont, Interim Manager Will Kwan, Architect Rommel Taylor, Project Designer Department of Public Works Building Design and ConstrucƟon
-
3
Ellis Street
Geary Boulevard
Stei
ner S
tree
t
Pier
ce S
tree
t
Landscape Area of Work
EXISTING RESTROOM AND STORAGE BUILDING TO BE DEMOLISHED
NEW RESTROOM AND STORAGE BUILDING
1
2
3
4
No Work This Area
1 2
Existing restroom and storage building to be demolished
4
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E Context and Vicinity Map
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 1
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Context-Playground 2
http:05.21.12
-
New Restrooms and Storage Building
No Work This Area
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Landscape PlanKimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 3
-
0RUNUS�SERRULATA�@+WANZAN� &LOWERING�#HERRY
#ARPENTERIA�CALIFORNICA "USH�!NEMONE
2HAPHIOLEPIS�UMBELLATA )NDIAN�(AWTHORN
2IBES�SANGUINEUM 0INK�&LOWERING�#URRANT
SHRUB ACCENTS
GROUNDCOVER
!RTEMESIA�@0OWIS�#ASTLE� (ELIANTHEMUM�NUMMULARIUM )RIS�DOUGLASIANA 0HLOMIS�FRUTICOSA 4RACHELOSPERMUM�JASMINOIDES 7ORMWOOD 3UNROSE 0ACIFIC�#OAST�)RIS *ERUSALEM�3AGE 3TAR�*ASMINE
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12
Plant Materials-@Geary
A R C H I T E C T U R E 4
http:05.21.12
-
INDEPENDENT PLAY STRUCTURES
BASKETBALL COURT
OUTDOOR EXCERCISE EQUIPMENT
(N) TREES TYP.
(E) STREET TREES, TYP.
(N) TREES TYP. New Restrooms and Storage Building
No Work This Area
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E Landscape Plan-@ Pierce St.
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 5
-
!RBUTUS�MARINA0RUNUS�SERRULATA�@+WANZAN� 3TRAWBERRY�4REE &LOWERING�#HERRY
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Plant Materials@Pierce 6
http:05.21.12
-
36’
12’
48’
24’
1 2 3 4
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 ConceptsA R C H I T E C T U R E 7
http:05.21.12
-
RPD Storage
PAL Storage
Elec. Room
Women’s
Men’s
Maint.
48' 0
"
36' 0"
12' 0" 12' 0" 12' 0"
24' 0
"24
' 0"
Floor Plan and Site Plan
Pier
ce S
tree
t
Ellis Street
Entr
y
Entr
y
RPPD Storage
Elec. Room
Maint.
PAL Storage
Men’s
Women’s
AA
A R C H I T E C T U R E
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 8
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 View Looking NE 9
http:05.21.12
-
STANDING METAL SEAM ROOF
WOOD SIDING AND FASCIA
ALUMINUM FRAME LOUVERS AND WINDOWS
STUCCO OVER CMU
PORCELAIN TILE OVER CMU
STEEL SLIDING GATE
South
East
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
ElevationsKimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 10
-
North
West
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Elevations A R C H I T E C T U R E
11
http:05.21.12
-
RPD STORAGE
ELECTRICAL ROOM
PLUMBING CHASE
MEN’S RESTROOM
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Building Section A-A 12
http:05.21.12
-
2X TONGUE AND GROOVE WESTERN RED CEDAR CEILING
2X8 WD JOISTS 16” O.C.
STANDING METAL SEAM ROOF
2X TONGUE AND GROOVE WESTERN RED CEDAR SOFFIT
AND FASCIA
ALUMINUM FRAME LOUVER
PAINTED ALUMINUM WINDOW FRAME WITH 1/2” LAMINATED GLASS WITH
TRANSLUCENT INTERLAYER
4X4 PAINTED STEEL FRAME
2X TONGUE AND GROOVE WESTERN RED CEDAR FASCIA
EXPOSED CMU
STUCCO OVER CMU
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Section Detail-Roof Assembly 13
http:05.21.12
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Roof-Exploded Isometric 14
http:05.21.12
-
CLOSED POSITION
OPEN POSITION
BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Entry Gate 15
http:05.21.12
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Views Looking SE 16
http:05.21.12
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Views Looking SW 17
http:05.21.12
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 View Looking NW 18
http:05.21.12
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Day 19
http:05.21.12
-
BUILDING DESIGN & CONSTRUC TION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Night 20