1 PREFACEThis datasheet covers FLSmidth A/S Kilnloq gas analysis system with respect to technicaldata, installation, etc. The datasheet information must be used in conjunction with all
documents included in the complete system users manual
The whole analysis system is to be operated and maintained as described in the systemmanual supplied with system. If not, the efficiency and lifetime of the system will be
reduced. An alarm must always be corrected at once. Qualified and trained personnelmust perform the maintenance. FLSmidth A/S Gas Analysis Technology continuousimproved the product and reserve the right to modify the information contained in this
datasheet without notice.
1.1 DOCUMENT MAPThis datasheet is to be considered as information about the different components used ina gas analyser system from FLSmidth A/S. The datasheet covering general system dataand contains:
o System and component data.o Drawingso Cable listo Bus List
1.2 DEFINITIONS AND TERMS1.2.1 GENERALSystem (analysis system) The complete analysis system.KilnLoq FLSmidth A/S Gas Analysis Technology brand for One-pipe
Kiln Inlet probeExtraction Device FLSmidth A/S Gas Analysis Technology Extraction Device
v.2 for KilnLoq probe.One-pipe Patent pending one-pipe design from process through filter.Kilnloq probe Extracts sample gas from a specific point in process.GMU Gas Monitoring Unit: Cabinet or housing comprising
analysis parts, power distribution and control.GASloq 1200 FLSmidth A/S Gas Analysis Technology analysis cabinet
comprising analysis parts, power distribution and control.GASloq CUBE FLSmidth A/S Gas Analysis Technology analysis housing
insulated, heated, with air conditioning and with GMUinstalled.
Field cabinet FLSmidth A/S Gas Analysis Technology analysis cabinetcomprising power distribution and control. without gasanalysis components.
Utility Air FLSmidth A/S Gas Analysis Technology Utility Air is a basisair unit to handle, regulate and distribute cleaning and
control air for the FLSmidth analysis system. The Utility Aircomprises an air receiver with piping, and valves amongothers.
Probe Cooling FLSmidth A/S Gas Analysis Technology Probe Cooling is tosupply cooling water to the KilnLoq probe.The Probe Cooling is a steel frame containing a 200 literswater tank, water circulation pump, heat exchanger and acontrol cabinet. The water is cooled down by heat-exchanger. Probe Cooling pump and fan is controlled byGMU Controller
Datasheet Kilnloq rev 270910 Page 2
-
7/30/2019 Kilnloq Datasheet 270910.PDF
3/40
Trained/qualified Personnel Indicates personnel that is not only certified to work on the
plant according to all local and national regulations, butpersonnel who also has specific training from e.g. FLSmidthGas Analysis Technology in use and maintenance of gasanalysis systems.
1.2.2 UNITS AND CONVERSION FACTORSAll units in FLSmidth Gas Analysis Technology documentation are SI-units except from:Temperature: C (degrees Celsius)
For general use the following approximations can be used for conversion:Length: mm to inch factor 0,04
Pressure: Bar to PSI (US) factor 14,5Temperature: C to F F = C 1.8 + 32
1.2.3KILNLOQ SYSTEMKilnloq system always consist of:Extraction device with probe, heated sample hose andField Cabinet
ORGASloq 1200OrGASloq CUBE
Optional:Probe CoolingUtility Air
1.2.4 CABLING BETWEEN GAS MONITORING UNIT AND OTHER EQUIPMENTCables must be connected according to section Cable list in system manual. See Cablelist in this datasheet for basic information.
1.2.5 BUS COMMUNICATIONDepending on the system made a various sort of bus communications are available asoptions. See "Bus list" in this datasheet for basic information.
1.2.6 PHYSICAL DISTANCE BETWEEN EQUIPMENTBetween Gas Monitoring Unit (GMU) andprobe: Available length of heated sample line is Totallength of hose minus 4 meters (LHeated Hose total
4m). Default available length is 15 mEach additional meter will increase the systemresponse time with one second.
Between Probe and Probe cooling: Probe cooling should be placed as close to theKilnLoq probe as possible. (Customerinstallation)
Between probe and Air Utility: Recommended length of air hoses is 4 m.(Customer installation)
Datasheet Kilnloq rev 270910 Page 3
-
7/30/2019 Kilnloq Datasheet 270910.PDF
4/40
Technical information KilnLoq probe and ExtractionDevice
Dimensions: NOTE: Lengths depending on specific sampleend length.
Dimensions lx w x h 2575-5138 x 472 x 1291 mm.Dimensions seaworthy package l x w x h 3000-5600 x 700 x 1600 mm.
Sample end length: 1500/2500/3700 mmAvailable length for insertion in process: 1000/2000/3200 mm (from EXD process
flange)Diameter in process: 90 mm
Sample Filter:Material AISI 316LFilter size 20m ,102x50/40
Process conditions:Measuring points: Kiln inlet or similarTemperature Max. 1200C
Dust load Max. 1000 g/m3
Weight:Weight, dry: App. 600 kg.Weight seaworthy package gross dry App. 700 kg.
Temperatures:Ambient temperature: -20C to 55C 1OPTIONAL: Ambient temperature with lowtemperature option and shield.Storage temperature:
-40C to 55C OPTIONAL!!
-15C to 55CEquipment must be protected against heat
radiation
Power supply:Power supply from GMU: 380-460 VAC, 2,5 kW
Please see System Data sheet for specificproject.
Power supply from GMU: (control valves) 24 V DC, 200 W.
Connections:Sample line connection: 6 mm stainless steel Swagelok
Compressed air:Pressure: 600 kPa
Consumption: 3 Nm3/h at 600 kPaQuality: 3-3-3 according to ISO 8573-1
Maximum 5 mm (size) 5 mg/m3 particlesMinimum -20 water dew pointMaximum 1 mg/m3 oil
Air connection: ISO 7/1-Rp , Union (female pipe tread)
Water cooling:Pressure: (at WS1) 100-500 kPaConsumption: 0 l/hWater flow Minimum 2500 l/h at 100-500 kPaWater connection: ISO 7/1-Rp-1 Union(1female pipe tread)
1 Probe must be protected to prevent condensation and freezing.
Datasheet Kilnloq rev 270910 Page 4
-
7/30/2019 Kilnloq Datasheet 270910.PDF
5/40
Technical information Probe Cooling
Power supply:Power supply from GMU: 3x380 3x480 V 50/60 Hz, 1,0 kVA.
24 V DC, 25 W (control signals)Power supply heater 2 110-230 VAC, 100W
Dimensions:Dimensions l x w x h 1780 x 725 x 1155 mm.Dimensions seaworthy package l x w x h: 1980 x 950 x 1400 mm.Foundation: 4x12 for 12mm expansion bolts
Weight:Weight App. 300 kg.Weight seaworthy package gross dry: App. 450 kg.
Temperatures:Ambient temperature: -20C to 55C
OPTIONAL: Ambient temperature with lowtemperature option and shield
-40C to 55C OPTIONAL!!
Storage temperature: -15C to 55CEquipment must be protected against heat radiation
Capacity: 200 liters (approximately)
Connections:WL1 Water connection to probe: ISO 7/1-Rp-1 Union (1female pipe tread).WL2 Water connection from probe: ISO 7/1-Rp-1 Union (1female pipe tread).WS1 Water supply to PROBE COOLING,between 0.5-3 bar
ISO 7/1-Rp-1 Union (1female pipe tread).
WD1 Water drain from PROBE COOLING: ISO 7/1-Rp- Union (female pipe tread).
Water specifications:Cooling water: consumption: During normal operation there is no water
consumption.The following values of the water qualityshould not be exceededNever use:de-mineralized water orde-ionized water ordistilled water
Hardness: 10 dH*.Chloride: 1000 mg/litre.Total salt conc.: 3000 mg/litre.(evaporation residue.)
Free CO2: 20 mg/litre.Suspended solids : 5000 mg/litre.
Silica (SiO2): 50 mg/litre.
Sulphate (SO4): 680 mg/litre.Algae growth: NOT ALLOWED.pH: 5 7.
*1 dH = 10 mg CaO/litre or 7.14 mg MgO/litre.
Technical information Utility Air
Power supply:Power supply: None
2 Optional: Voltage follows system internal voltage.
Datasheet Kilnloq rev 270910 Page 5
-
7/30/2019 Kilnloq Datasheet 270910.PDF
6/40
Dimensions:Dimensions l x w x h 600 x 500 x 1180 mmVolume: 100 litresFoundation: 3x12 for 12mm expansion bolts
Weight:Weight 50 kg
Weight including seaworthy package 100 kg
Temperatures:Ambient temperature: -20C to 55COPTIONAL: Ambient temperature with lowtemperature option and shield.
-40C to 55C OPTIONAL!!
Storage temperature: -15C to 55CEquipment must be protected against heat radiation
Compressed air requirements:Pressure: 600 kPa (nominal)
Range 550-750 kPa
Capacity: 100 litresConsumption: According to individual system configuration. Seesystem manual
Quality: 3-3-3 according to ISO 8573-1Maximum 5 mm (size) particlesMinimum -20 water pressure dew point**Pressure dew point must be minimum -10C belowminimum ambient temperature at any time.Maximum 1 mg/m3 oil
Connections:AS1 air inlet connection ISO 7/1-Rp , Union (female)AS2 supply for Extraction Device ISO 7/1-Rp , Union (female)
Technical information Heated sample line
Power supply:Power comsumption: 100 W/m.
Dimension:Dimensions l x : Length according to System Data Sheet x 40
mmMax length 36 mDefault length 15 m
Weight:Weight: 1 kg/m.
Connections:Hose connections:: Probe end: 6 mm stainless steel Swagelok.
GMU end: 6 mm PVDF
Inner hose heated to 180C
Technical information enclosure GASLoq 1200
Dimension:Dimensions l x w x h: 1200x 600 x 2100 mm.Dimensions seaworthy package l x w x h: 1420 x 800 x 2280 mm.
Datasheet Kilnloq rev 270910 Page 6
-
7/30/2019 Kilnloq Datasheet 270910.PDF
7/40
Foundation: 4x12mm for 12mm expansion bolts
Weight:Weight, dry: Approximately 400 kg.Weight seaworthy package gross dry: Approximately 570 kg.
Temperatures:Ambient temperature: 5C to 40C
Storage temperature: -15C to 55C under roof
Placement:Analyzer housing In a dust- and vibration-free (max +- 0.04 mm
at 5 to 55 Hz. 0.5 g at 55 to 150 Hz) and well-ventilated room of min. 6 m2.
Connections:Gas connections: 6 mm PVDF fittings.DosingConsumption (default settings) 0,33Liter / 24hour
Technical information enclosure GASLoq CUBE
Dimension: (default sizes)Dimensions l x w x h:, weight dry(Standard measures, special on request)
1800 x 2200 x 2200 mm., approx. 1000kg
Special: 3900 x 2200 x 2200 mm., approx. 1400kgFoundation: See project drawings for actual CUBE
Temperatures:Ambient temperature: -20C to 55CAmbient temperature with low temperature
option
-40C to 55C
Storage temperature: -15C to 55CEquipment must be protected against heatradiation
Placement:Cube platform Vibration-free (max +- 0.04 mm at 5 to 55 Hz.
0.5 g at 55 to 150 Hz).
Connections:Gas connections: 6 mm PVDF fittings.
DosingConsumption (default settings) 0,33Liter / 24hour
Technical information enclosure Field Cabinet
Dimension:Dimensions l x w x h: 600 x 210 x 600 mm.Dimensions seaworthy package l x w x h: 800 x 400 x 800 mm.Wall mounted: 4x10mm for 10mm expansion bolts
Weight:Weight, dry: Approximately 100 kg.Weight seaworthy package gross dry: Approximately 150 kg.
Temperatures:Ambient temperature: 5C to 40CStorage temperature: -15C to 55C under roof
Datasheet Kilnloq rev 270910 Page 7
-
7/30/2019 Kilnloq Datasheet 270910.PDF
8/40
Placement:Analyzer housing In a dust- and vibration-free (max +- 0.04 mm
at 5 to 55 Hz. 0.5 g at 55 to 150 Hz) and well-ventilated room of min. 6 m2.
Connections:Gas connections: None.
Datasheet Kilnloq rev 270910 Page 8
-
7/30/2019 Kilnloq Datasheet 270910.PDF
9/40
Installation of Extraction DeviceSee layout drawings "KilnLoqV2: P&I Diagram" KilnLoq: System View EXD2: MatingFlange "EXD: Extraction Device 2547"
Installation of mating flange
The performance of the KilnLoq probe depends in a very high degree of the location andposition of the mating flange. The mating flange must be positioned thus the KilnLoqprobe is able to take a pure process gas sample with no interference from kiln sealingand the mechanical protection is as good as possible. The installation is different fromsite to site but below listed items should be followed.The mating flange should be installed:
At 45 to the kiln axis, as close as possible to the kiln seal thus the gas intake protrudes
past the kiln seal and leakage from the seal does not affect the measurement. Take carethat there is space to refractory.
In the kiln centre line, away from the affects of the raw material feeders and away from
the affects of any air blasters etc.
At an angle of approx. 0-10 , (0 is recommended) downwards towards the gas intake.See drawing EXD: Extraction device
Installation of Extraction DeviceThe Extraction Device must be positioned thus the bolt flange fits the mating flange. Thetwo adjustable support feet under the Extraction Device must be adjusted thus it is inhorizontal position along and across the vessel. The Extraction Device must now bebolted to the mating flange and fundament.
Installation of Probe CoolingSee layout drawings "KilnLoqV2: P&I Diagram" KilnLoq: System View and ProbeCooling
The Probe Cooling can be located at the same deck as the probe or it can be locatedat decks below or above the probe. The maximum lengths of the water pipes form theProbe Cooling to the probe is 30 m equivalent pipe length, including bending and angles.Maximum vertical distance between Probe Cooling and probe 10 m. The Probe Cooling
must be bolted to the foundation with 12mm expansion bolts or similar. There must be 1m free space above Probe Cooling in order to open water tank lid.All pipes is recommended to be galvanised steel pipes. Internal diameter must be similarto standard 1" Steel pipes.
Installation of Utility AirSee layout drawings "KilnLoqV2: P&I Diagram" KilnLoq: System View and Utility AirThe Utility Air must be located at the same deck as the probe. The length of piping
depends on actual system configuration i.e. the Utility Air must be installed with themaximum radius (see system layout drawing). The Utility Air must be bolted to thefoundation with 12mm expansion bolts or similar.
The instrument air supply must be connected to the union tagged AS1 on the UtilityAir.
Installation of heated sample gas hoseThe heated sample line is connected in the KilnLoq probe and has to be connected to the
GMU. The hose must be rolled out in its full length and the installed on a cable tray orsimilar. It must be weather protected and mechanical protected. The end with the power
Datasheet Kilnloq rev 270910 Page 9
-
7/30/2019 Kilnloq Datasheet 270910.PDF
10/40
cable is to be located in the GMU and fixed in the hose clamp.
Bending radius has to be greater than 250 mm.
Note.If the hose has to be coiled the coils must not touch each other there should be at least100 mm betweenThe distance between heated hoses should be at least 100 mm
Datasheet Kilnloq rev 270910 Page 10
-
7/30/2019 Kilnloq Datasheet 270910.PDF
11/40
BB3 (cooling jacket)
Y4.4
C5
V3
Span-Gas 2
PI
PI
PI
PI
M1.5
s
p
Purge out 1
C2CondensateDosing
C1
E1.1TALH
M1.6
p
s
E1.1E1.1:L3
C1.1Y1.2
P AB
V1.1
D
M1.1C1.3
P4.1
P4.1PAL
E1.1E1.1:L1
E1.1E1.1:L2
M1.3
s
p M1.4
s
p
B1.1Y1.5
B PA
BM
E1TALH
E1
A1GMU
Line 1
AS4
AP1
C4.1Flange
cleaner Y4.3 V4.2
AS3
V2.6
Drain
E4TALH
E4
A2Utillity Air(Optional)
A4Extraction Device
B4.2PAL
Y4.7
Y4.9Y4.10
Y4.8
B4.2
V2.1V2.2V4.1
V2.4
V2.5C2.1
Air
Supply
"
BB1BB2
AS2
WL2
BB1 (Button of filter house)
WL1
BB2 (snap connector)
W1E3
M4.2
M4.1
Y4.1
Y4.2
M4.1PSA
E3TALH
2 4
3 1 5
2
13
B4.1PAL
1B3TAH
B3.4
B4.1
WS1
A3Probe Cooling(Optional)
M3.1
s
p
V3.2V3.3
E3.1
WL1WD1WL2
C3.1 V3.1
Water supply
Calibration Gas
10mmPTFE
W1HILH
1B31B5
TI
PI2.1
TI
V4.7Pipe cleaning
lance
AP1
M4.5
M4.5
PSA
1 3
2Y4.6 "Fail safe valve"
Y4.5 2 4
3 1 5
V4.7
Activated whe n Probe Out
A4.1Process Shutter(Optional)
AS2
Customer supply
Y4.13
P A
Y4.12 2
13
Y4.11
- -
Air
Supply
"
C3.2
KilnLoq Probe
C3
WD2
1B10TAH
Customer supply
2
13
Y4.152
13
Y4.141212
12
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilize
Proj
Draw
No
Kiln
Datasheet Kilnloq rev 270910
-
7/30/2019 Kilnloq Datasheet 270910.PDF
12/40
A2 Utility Air
A4 Extraction device with probe
Pro-face
A1 Field cabinetPro-face
A1 Gasloq 1200
A1 Gasloq Cube
A3 Probe cooling
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Drawing title:
Drawing number (FLSmidth GAT):
Drawing number (Customer):Project / Plant name:
Drawing scale: Revision: Initials: Date:Drawing units:
mm 27-09-10LHS0none
Kilnloq V2 -
270910-Kilnloq-1-110-05
Kilnloq; System components
Datasheet Kilnloq rev 270910 Page 12
-
7/30/2019 Kilnloq Datasheet 270910.PDF
13/40
AS1
Air supplyFixed 1" pipe line installation
(Not in scope of analysis system )
NOTEMating flange (Not in scope of analysis system)
Position: above kiln center line, close as
possible to kiln sealing (see drw.)
Horizontal: 45 (to 90) deg. to kiln (see drw.)
Vertical: going 0 to 10 deg. down.
Minimum 800mm above installation deck.
800
!
Mating flange
must be cut clean
E1Sample hose
WS1Water supply
Fixed 1" pipe line installation
(Not in scope of analysis system )
WD1Water drain
Fixed 1" pipe line installation
(Not in scope of analysis system )
!
Short as
possible
!
45
-90
4500
4500
Extraction Device EXD
Probe Cooling
WL1+WL2Water connections to sample probe
Fixed 1" pipe line i nstallation
(Not in scope of analysis system )
Room for gas analyser equipm
Distance from probe according
Heated Hose E1 length
(May not be in scope of analysis
Avoid tip closer that 500mm from wall etc.
eg. Probe Tip
Kiln inlet end view
Platform level:App. 800mm below
KilnLoq probe center line
!
NOTEA: This is an example for installation arrangement.
The actual installation depends on kiln type and dimension.
B: A safe and secure emergency exit from platform must
be ensured.
AS2Air supply
Recommended < 10m
Min "
(Not in scope of analysis system )
Utillity Air
NOTE: common air supply for
complete system: AS1
and AS2 must be minimum 1"
"Best Kilnloq tip measurement
area"
AS3Air supply
"
Recommended200mm above
centerline
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Drawing title:
Drawing number (FLSmidth GAT):
Drawing number (Customer):Project / Plant name:
Drawing scale: Revision: Initials: Date:Drawing units:
mm 27-09-10LHS01:72
- -
270910-KilnLoq-1-110-10
KilnLoq: System View (Kiln)
Datasheet Kilnloq rev 270910 Page 13
-
7/30/2019 Kilnloq Datasheet 270910.PDF
14/40
Calciner duct
WL1+WL2Water connections to sample probe
Fixed 1" pipe line installation
(Not in scope of analysis system)
AS2Air supply
Recommended < 10m
Min "
(Not in scope of analysis system)
Probe Cooling
Extraction Device EXD
Utillity Air
4500
4500
Room for gas analyser equipm
(Not in scope of analysis system )
NOTEMating flange (Not in scope of analysis system)Vertical: going 10 deg. down like extraction device (see drw.)
NOTEThis is an example for installation arrangement.
The actual installation depends of kiln type and dimension.
AIR
FLOW
DIRECTION
Norestrictions!!
NOTE: common air supply for
complete system: AS1
and AS2 must be minimum 1"
AS3Air supply
"
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Drawing title:
Drawing number (FLSmidth GAT):
Drawing number (Customer):Project / Plant name:
Drawing scale: Revision: Initials: Date:Drawing units:
mm 27-09-10LHS01:55
Kilnloq V2 -
270910-KilnLoq-1-110-20
KilnLoq: System View (Calciner)
Datasheet Kilnloq rev 270910 Page 14
-
7/30/2019 Kilnloq Datasheet 270910.PDF
15/40
Length according to site conditions. As short as possible!
5" Inner diameter
e.g. Pipe 141,3x6,55mm
Material: St 37
Not supplied by FLSmidth Gas Analysis Technol
A
A
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilize
Proje
Draw
1:12
-
Datasheet Kilnloq rev 270910
-
7/30/2019 Kilnloq Datasheet 270910.PDF
16/40
2100
57
0
Left side
2M3
Main switch
AB
Main switch
Right side Front view
1200
2M3.1
1200
600
Purge out1
Cal. gas
Gas out1
Gas out 1;
6mm PVDF
Purge out 1; 6mm PVDF
Line1
Line 1
Dosing Dosing; 6mm PVDF
Condensate Condensate;
6 mm PVDF
Cal. gas;
6mm PVDF
Pro-face
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Drawing title:
Drawing number (FLSmidth GAT):
Drawing number (Customer):Project / Plant name:
Drawing scale: Revision: Initials: Date:Drawing units:
mm 27-09-10LHS01:20
Kilnloq V2 -
270910-Kilnloq-1-150-10
1200: CabinetWeight: app. 350kg
Bulkhead connection for: 6 / 4 mm hose
Cable into cabinet trough socket
Foundation: 4*12 for 12mm expansion bolt
Datasheet Kilnloq rev 270910 Page 16
-
7/30/2019 Kilnloq Datasheet 270910.PDF
17/40
M25 cablegland
Bottom view
Top view
Front view Left sideRight side
600
600
210
Pro-face
2M3
2M3
AB
1Q1
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utiliz
Pro
Dra
no
-
Weight: app. 100kg
Cable into cabinet trough glands
Wall mounted: 4*10 for 10mm expansion bolt
Datasheet Kilnloq rev 270910
-
7/30/2019 Kilnloq Datasheet 270910.PDF
18/40
Front view Left viL R
Cable tray:
60x160mm2260
2200
Projektname
Project Type
Projekt seriel
Project Data
1920
Attached to foundation w. M16 bolts
(steel 88) [pcs.]:
Actual wind load at Normal condition (air density = 1.23 kg/m3, airtemperature = 20 degress Celsius)
Wind load@24h [m/s]:
Wind load@15s [m/s]:
Layer 6:
Layer 5:
Layer 4:
Layer 3:
Layer 2:
Layer 1:
Wall construction (From outside):
Weight app. [kg]:
ST, Galv. STeel plate
XPS, Extruded PolyStyrene
GRP, Glasfiber Reinforced Plastic
50
70
1000 Kg
minimum 8
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilize
Proje
Draw
1:20
Kiln
Datasheet Kilnloq rev 270910
mailto:load@24hmailto:load@15smailto:load@15smailto:load@24h -
7/30/2019 Kilnloq Datasheet 270910.PDF
19/40
1167
400
Weight: app. 50kgAir connection AS1:1/2" Union, ISO 7/1
Air connection AS2: 1/2" Union, ISO 7/1
Air consumption: app. 3 Nm3/h at 600 kPa
Air quality: 3-3-3 according to ISO 8573-1
Foundation: 3*12 for 12mm expansion bolt (300mm
circle)
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Drawing title:
Drawing number (FLSmidth GAT):
Drawing number (Customer):Project / Plant name:
Drawing scale: Revision: Initials: Date:Drawing units:
mm 27-09-10LHS01:8
Kilnloq V2 -
270910-Kilnloq-1-170-10
Utility Air
Datasheet Kilnloq rev 270910 Page 19
-
7/30/2019 Kilnloq Datasheet 270910.PDF
20/40
3575
Stroke = 1700418,3
474
1291
758,5
100
424
3073
8 x 13 for 12mm bolts
# Shown in lowest position# Can be raised app. 200mm
min. 200 free space
532,
5
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilize
Proje
Draw
1:20
Kiln
Weight: app. 600kg
Water connection WL1+WL2: 1" Union, ISO 7/1
Air connection AS2+AS3: " Union, ISO 7/1
Air consumption: app. 3 Nm3/h at 600 kPa
Air quality: 3-3-3 according to ISO 8573-1
Foundation: 8*13 for 12mm expansion bolt
Datasheet Kilnloq rev 270910
-
7/30/2019 Kilnloq Datasheet 270910.PDF
21/40
4x13 for mounting
WS1: Water supply
WL2: Water re
WD1: Water drain
WL1: Water outlet to
FRONT END BACKSIDE
TOP
AIR
FLOW DIRECTION
No restrictions!!
1785
725
1155
Overflow pipe
Connect to drain
"
Service Access side of
panel - 1m free spacerecommended!
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilize
Proje
Draw
1:20
Kiln
Weight (empty): app. 300 kgWater volumen: app. 200 liters
Water connections: 1" Union, ISO 7/1-Rp 1
Water connections: " Union (WD1 Only)
Water supply pressure at WS1: 100-500 kPa
Water consumption: 0 l/h
Foundation: 4x13 for 12mm expansion bolt
Datasheet Kilnloq rev 270910
-
7/30/2019 Kilnloq Datasheet 270910.PDF
22/40
Cable list
Cable name ToFrom
GMU-CPS-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU CPS
Signal informationTagname
mm 2Cross section :
Shield :
Short circuit and overload protection 3x25A D02 SIEMENS, Permissible short circuit current Icf=10kA, Rated short-time withstand current (1sec) Icw = 280A, Supply must be residual-currentprotected
Cable information :
X11 1U1 U1PS_AC_GMU 400 VACPower supply for analysis system, 10 kVA
X11 1V1 V2400 VAC
X11 1W1 W3400 VAC
X11 PE PE4PE
GMU-CPS-W2
Term. row Term. no. Term. No.Term. rowWire.
GMU CPS
Signal informationTagname
mm 2Cross section :
Shield :
Uninterruptable Power Supply (option)Cable information :
X11 2U1 1UPS_AC_GMU 230 VACUninterruptable Power supply for controler 150W
X11 2N1 20 VAC
X11 PE 3PE
1/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 22
-
7/30/2019 Kilnloq Datasheet 270910.PDF
23/40
Cable list
Cable name ToFrom
GMU-CCS-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU CCS
Signal informationTagname
mm 2Cross section :
Shield :
All analogue outputs are 4-20 mACable information :
X12 1 1AO_CCS_#1 + Sig.Analogue signal for #1, 4-20mA, Self-powered, 0-xx Vol.%
X12 2 2- Sig.
X12 PE shPE
X12 3 3AO_CCS_#2 + Sig.Analogue signal for #2, 4-20mA, Self-powered, 0-xx Vol.%
X12 4 4- Sig.
X12 PE shPE
X12 5 5AO_CCS_#3 + Sig.Analogue signal for #3, 4-20mA, Self-powered, 0-xx Vol.%
X12 6 6- Sig.
X12 PE shPE
X12 7 7AO_CCS_#4 + Sig.Analogue signal for #4, 4-20mA, Self-powered, 0-xx Vol.%
X12 8 8- Sig.
X12 PE shPE
X12 9 9AO_CCS_#5 + Sig.Analogue signal for #5, 4-20mA, Self-powered, 0-xx Vol.%
X12 10 10- Sig.
X12 PE shPE
2/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 23
-
7/30/2019 Kilnloq Datasheet 270910.PDF
24/40
Cable list
Cable name ToFrom
GMU-CCS-W2(KilnLoq)
Term. row Term. no. Term. No.Term. rowWire.
GMU CCS
Signal informationTagname
mm 2Cross section :
Shield :
All digital outputs are potential free relay contacts rated 5 A at 30 VDC or 250 VACCable information :
X13 1 1DO_CCS_SYSTEM_ON Sig.System status, Run/Stop, Signal 0 = System stopped, Signal 1 = System running
X13 2 2Sig.
X13 3 3DO_CCS_UNIT_ALARM Sig.System status, Unit alarm, Signal 0 = Unit alarm, Signal 1 = OK
X13 4 4Sig.
X13 5 5DO_CCS_MNT_REQUEST Sig.System status, Maintenance request, Signal 0 = Maintenance request, Signal 1 = OK
X13 6 6Sig.
X13 7 7DO_CCS_TEST_ON Sig.System status, Test mode, Signal 0 = Test mode ON, Signal 1 = Test mode OFF
X13 8 8Sig.
X13 9 9DO_CCS_CLEANING_ON Sig.System status, Cleaning mode, Signal 0 = Cleaning ON, Signal 1 = Cleaning OFF
X13 10 10Sig.
X13 11 11DI_CCS_HMI_LOCK 24 VDCLocal operation on HMI display allowed, Signal 0 = HMI Locked, Signal 1 = HMIAvailable
X13 12 120 VDC
X13 13 13DO_CCS_SHOCK_BLAST Sig.Extern shock blaster conrol, Signal 0 = SB off, Signal 1 = SB on
X13 14 14Sig.
X13 15 15DO_CCS_HILH Sig.Low/high heat input on Kilnloq probe, Signal 0 = Heat input Low/Hi, Signal 1 = OK
X13 16 16Sig.
X13 PE PEPE
3/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 24
-
7/30/2019 Kilnloq Datasheet 270910.PDF
25/40
Cable list
Cable name ToFrom
GMU-E1-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU E1
Signal informationTagname
mm2Cross section :
Shield :
Heated hose, supplied with the system;NOTE: Heated Hose is to be drawn by customer, Electrical termination in GMU
Cable information :
X16 1V2 brownPS_AC_E1 400 VACPower supply for heated hose E1, x,x kVA
X16 1W2 blue400 VAC
X16 PE greenPE
X16 1 whiteAI_PT_100_E1 Sig.Temperature signal from heated hose E1, PT100, ,
X16 2 redSig.
X16 3 redSig.
GMU-PROBECOOL-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU Probe Cool
Signal informationTagname
mm 2Cross section :
Shield :
Probe Cooling Panel: Power supplyCable information :
X14 3U2 1U1X341PS_AC_Probe Cooling 400 VACPower supply for Probe Cooling Panel, 1,0 kVA
X14 3V2 1U1X342400 VAC
X14 3W2 1W1X343400 VAC
X14 PE PEX344400 VAC
4/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 25
-
7/30/2019 Kilnloq Datasheet 270910.PDF
26/40
Cable list
Cable name ToFrom
GMU-PROBECOOL-W2
Term. row Term. no. Term. No.Term. rowWire.
GMU Probe Cool
Signal informationTagname
mm 2Cross section :
Shield :
Probe Cooling Panel: Control signalsCable information :
X14 1 1X341DO_E3.1 24 VDCProbe Cooling: Heatexchanger Fan, Signal 0 = OFF, Signal 1 = ON
X14 2 2X342Sig.
X14 3 3X343DO_M3.1 Sig.Probe Cooling: Water pump, Signal 0 = OFF, Signal 1 = ON
X14 PE PEX34shieldPE
5/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 26
-
7/30/2019 Kilnloq Datasheet 270910.PDF
27/40
Cable list
Cable name ToFrom
MU-EXD-W1 (KilnLoqV
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Control signalsCable information :
X17 PE PEX47ShieldPS_DC_EXD PE24 VDC for Extraction device
X17 1 1X47124 VDC
X17 2 2X4720 VDC
X17 3 3X473DO_Y4.1_IN + Sig.Probe IN, Signal 0 = Y4.1 closed IN, Signal 1 = Y4.1 open IN
X17 4 4X474DO_Y4.1_OUT + Sig.Probe OUT, Signal 0 = Y4.1 closed OUT, Signal 1 = Y4.1 open OUT
X17 5 5X475DO_Y4.2 + Sig.EXD in normal operation, Signal 0 = Y4.2 closed, Signal 1 = Y4.2 open
X17 6 6X476DI_1B6_IN + Sig.Position switch: Probe IN, Signal 0 = Probe not IN, Signal 1 = Probe IN
X17 7 7X477DI_1B8_1B9_OUT + Sig.Position switch: Probe OUT, Signal 0 = Probe not OUT, Signal 1 = Probe OUT
X17 8 8X478DO_1S6_1S7_ACT + Sig.Push buttons 1S6 and 1S7 active, Signal 0 = 1S6 and 1S7 not active, Signal 1 = 1S6and 1S7 active
X17 9 9X479DI_1S6_IN + Sig.Probe manuel IN, Signal 0 = , Signal 1 = Move Probe IN
X17 10 10X4710DI_1S7_OUT + Sig.Probe manual OUT, Signal 0 = , Signal 1 = Move Probe OUT
X17 11 11X4711DO_Y4.3_FCL + Sig.Flange cleaning, Signal 0 = Y4.3 closed, Signal 1 = Y4 .3 open
X17 12 12X4712AI_PT100_1B3 Sig.Supply water (to KilnLoq) temperature (option), , ,
X17 13 13X4713Sig.
X17 14 14X4714Sig.
X17 15 15X4715AI_PT100_1B5 Sig.Return water (from KilnLoq) temperature (option), , ,
X17 16 16X4716Sig.
X17 17 17X4717Sig.
6/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 27
-
7/30/2019 Kilnloq Datasheet 270910.PDF
28/40
Cable list
Cable name ToFrom
MU-EXD-W1 (KilnLoqV
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Control signalsCable information :
X17 18 18X4718DO_Y4.4_CJC + Sig.Cooling jacket cleaning (option), Signal 0 = Y4.4 closed, Signal 1 = Y4.4 open
X17 19 19X4719DO_Y4.7_BB1 + Sig.Blow Back 1, Signal 0 = Closed, Signal 1 = Open
X17 20 20X4720DO_Y4.8_BB2 + Sig.Blow Back 2, Signal 0 = Closed, Signal 1 = Open
X17 21 21X4721DO_Y4.9_AIR + Sig.Air inlet, Signal 0 = Closed, Signal 1 = Open
X17 22 22X4722DO_Y4.10_VENT + Sig.Vent, Signal 0 = Closed, Signal 1 = Open
X17 23 23X4723DI_B4.2_PAL + Sig.Pressure alarm, Signal 0 = Pressure alarm, Signal 1 = OK
X17 24 24X4724DO_Y4.12 + Sig.Control valve for Sample valve Y4.11, Signal 0 = Closed, Signal 1 = Open
X17 25 25X4725DO_Y4.13 + Sig.Protection valve for P4.1, Signal 0 = Closed, Signal 1 = Open
X17 26 26X4726DI_B4.1_PAL + Sig.Water pressure (flow) alarm, Signal 0 = Failure, Signal 1 = OK
X17 27 27X4727DO_Y4.5_OPEN (12) + Sig.Shutter open, Signal 0 = Y4.5 Closed (12), Signal 1 = Y4.5 Open (12)
X17 28 28X4728DO_Y4.5_CLOSE (14) + Sig.Shutter close, Signal 0 = Y4.5 Closed (14), Signal 1 = Y4.5 Open (14)
X17 29 29X4729DI_1B10_Open + Sig.Shutter position OPEN, Signal 0 = Shutter closed, Signal 1 = Shutter open
X17 30 30X4730AI_PT100_A4 Sig.Temperature signal Extraction device, , ,
X17 31 31X4731Sig.
X17 32 32X4732Sig.
X17 33 33X4733AI_P4.1 + Sig.Probe underpressure sensor, 4-20mA, ,
X17 34 34X4734- Sig.
X17 PE PEX47shieldPE
7/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 28
-
7/30/2019 Kilnloq Datasheet 270910.PDF
29/40
Cable list
Cable name ToFrom
GMU-EXD-W2
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Temperature signalCable information :
X19 1 1X491AI_PT_100_E3 Sig.Temperature signal from filter heater E3, , ,
X19 2 2X492Sig.
X19 3 3X493Sig.
X19 PE PEX49ShieldPE
GMU-EXD-W3
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Temperature signalCable information :
X19 4 4X491AI_PT_100_E4 Sig.Temperature signal from pipe heater E4, , ,
X19 5 5X492Sig.
X19 6 6X493Sig.
X19 PE PEX49ShieldPE
GMU-EXD-W4
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Power supplyCable information :
X19 4U2 1U1X491PS_AC_E3 400 VACPower supply for filter heater E3, max 1.3 kVA
X19 4V2 1V1X492400 VAC
X19 PE PEX49PEPE
8/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 29
-
7/30/2019 Kilnloq Datasheet 270910.PDF
30/40
Cable list
Cable name ToFrom
GMU-EXD-W5
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Power supplyCable information :
X19 5U2 2U1X491PS_AC_E4 400 VACPower supply for pipe heater E4, max 2.1 kVA
X19 5W2 2W1X492400 VAC
X19 PE PEX49PEPE
9/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Gasloq 1200 or CubeFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 30
-
7/30/2019 Kilnloq Datasheet 270910.PDF
31/40
Cable list
Cable name ToFrom
GMU-CPS-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU CPS
Signal informationTagname
mm 2Cross section :
Shield :
Short circuit and overload protection 3x25A D02 SIEMENS, Permissible short circuit current Icf=10kA, Rated short-time withstand current (1sec) Icw = 280A, Supply must be residual-currentprotected
Cable information :
X11 1U1 U1PS_AC_GMU 400 VACPower supply for analysis system,8 kVA
X11 1V1 V2400 VAC
X11 1W1 W3400 VAC
X11 PE PE4PE
GMU-CPS-W2
Term. row Term. no. Term. No.Term. rowWire.
GMU CPS
Signal informationTagname
mm 2Cross section :
Shield :
Uninterruptable Power Supply (Option)Cable information :
X11 2U1 1UPS_AC_GMU 230 VACUninterruptable Power supply for controller 150W
X11 2N1 20 VAC
X11 PE 3PE
1/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 31
-
7/30/2019 Kilnloq Datasheet 270910.PDF
32/40
Cable list
Cable name ToFrom
GMU-CCS-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU CCS
Signal informationTagname
mm 2Cross section :
Shield :
All analogue outputs are 4-20 mACable information :
X12 1 1AI_CCS_O2 + Sig.Analogue signal for #1 O2 (range, unit config on HMI), 4-20mA, Self-powered, 0-10Vol.%
X12 2 2- Sig.
X12 3 3AI_CCS_CCS_CO + Sig.Analogue signal for #2 CO (range, unit config on HMI), 4-20mA, Self-powered, config0-100% range
X12 4 4- Sig.
X12 5 5AI_CCS_CCS_NO + Sig.Analogue signal for #3 NO (range, unit config on HMI), 4-20mA, Self-powered, config0-100% range
X12 6 6- Sig.
X12 7 7AI_CCS_CCS_CH4 + Sig.Analogue signal for #4 CH4 (range, unit config on HMI), 4-20mA, Self-powered,config 0-100% range
X12 8 8- Sig.
X12 9 9AI_CCS_CCS_SO2 + Sig.Analogue signal for #5 SO2 (range, unit config on HMI), 4-20mA, Self-powered,config 0-100% range
X12 10 10- Sig.
2/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 32
-
7/30/2019 Kilnloq Datasheet 270910.PDF
33/40
Cable list
Cable name ToFrom
GMU-CCS-W2(KilnLoq)
Term. row Term. no. Term. No.Term. rowWire.
GMU CCS
Signal informationTagname
mm 2Cross section :
Shield :
All digital outputs are potential free relay contacts rated 5 A at 30 VDC or 250 VACCable information :
X13 1 1DO_CCS_SYSTEM_ON Sig.System status, Run/Stop, Signal 0 = System stopped, Signal 1 = System running
X13 2 2Sig.
X13 3 3DO_CCS_UNIT_ALARM Sig.System status, Unit alarm, Signal 0 = Unit alarm, Signal 1 = OK
X13 4 4Sig.
X13 5 5DO_CCS_MNT_REQUEST Sig.System status, Maintenance request, Signal 0 = Maintenance request, Signal 1 = OK
X13 6 6Sig.
X13 7 7DO_CCS_TEST_ON Sig.System status, Test mode, Signal 0 = Test mode ON, Signal 1 = Test mode OFF
X13 8 8Sig.
X13 9 9DO_CCS_CLEANING_ON Sig.System status, Cleaning mode, Signal 0 = Cleaning ON, Signal 1 = Cleaning OFF
X13 10 10Sig.
X13 11 11DI_CCS_HMI_LOCK 24 VDCLocal operation on HMI display allowed, Signal 0 = HMI Locked, Signal 1 = HMIAvailable
X13 12 120 VDC
X13 13 13DO_CCS_SHOCK_BLAST Sig.Extern shock blaster conrol, Signal 0 = SB off, Signal 1 = SB on
X13 14 14Sig.
X13 15 15DO_CCS_HILH Sig.Low/high heat input on Kilnloq probe, Signal 0 = Heat input Low/Hi, Signal 1 = OK
X13 16 16Sig.
X13 PE PEPE
3/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 33
-
7/30/2019 Kilnloq Datasheet 270910.PDF
34/40
Cable list
Cable name ToFrom
-CCS-W2.1(Field C.Kiln
Term. row Term. no. Term. No.Term. rowWire.
GMU CCS
Signal informationTagname
mm 2Cross section :
Shield :
All digital outputs are potential free relay contacts rated 5 A at 30 VDC or 250 VACCable information :
X13 17 1DI_CCS_START_STOP 24 VDCSTART and STOP signal from CCS (Puls >2sek toggle funtion), Signal 0 = NoOperation, Signal 1 = Start / Stop Puls
X13 18 20 VDC
GMU-E1-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU E1
Signal informationTagname
mm 2Cross section :
Shield :
Heated hose, supplied with the system;NOTE: Heated Hose is to be drawn by customer, Electrical termination in GMU
Cable information :
X16 1V2 brownPS_AC_E1 400 VACPower supply for heated hose E1, 1.9 kVA
X16 1W2 blue400 VAC
X16 PE greenPE
X16 1 whiteAI_PT_100_E1 Sig.Temperature signal from heated hose E1, PT100, ,
X16 2 redSig.
X16 3 redSig.
4/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 34
-
7/30/2019 Kilnloq Datasheet 270910.PDF
35/40
Cable list
Cable name ToFrom
GMU-PROBECOOL-W1
Term. row Term. no. Term. No.Term. rowWire.
GMU Probe Cool
Signal informationTagname
mm 2Cross section :
Shield :
Probe Cooling Panel: Power supplyCable information :
X14 3U2 1U1X341PS_AC_Probe Cooling 400 VACPower supply for Probe Cooling Panel, 1,0 kVA
X14 3V2 1U1X342400 VAC
X14 3W2 1W1X343400 VAC
X14 PE PEX344400 VAC
GMU-PROBECOOL-W2
Term. row Term. no. Term. No.Term. rowWire.
GMU Probe Cool
Signal informationTagname
mm 2Cross section :
Shield :
Probe Cooling Panel: Control signalsCable information :
X14 1 1X341DO_E3.1 24 VDCProbe Cooling: Heatexchanger Fan, Signal 0 = OFF, Signal 1 = ON
X14 2 2X342Sig.
X14 3 3X343DO_M3.1 Sig.Probe Cooling: Water pump, Signal 0 = OFF, Signal 1 = ON
X14 PE PEX34shieldPE
5/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 35
-
7/30/2019 Kilnloq Datasheet 270910.PDF
36/40
Cable list
Cable name ToFrom
MU-EXD-W1 (KilnLoqV
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Control signalsCable information :
X17 PE PEX47ShieldPS_DC_EXD PE24 VDC for Extraction device
X17 1 1X47124 VDC
X17 2 2X4720 VDC
X17 3 3X473DO_Y4.1_IN + Sig.Probe IN, Signal 0 = Y4.1 closed IN, Signal 1 = Y4.1 open IN
X17 4 4X474DO_Y4.1_OUT + Sig.Probe OUT, Signal 0 = Y4.1 closed OUT, Signal 1 = Y4.1 open OUT
X17 5 5X475DO_Y4.2 + Sig.EXD in normal operation, Signal 0 = Y4.2 closed, Signal 1 = Y4.2 open
X17 6 6X476DI_1B6_IN + Sig.Position switch: Probe IN, Signal 0 = Probe not IN, Signal 1 = Probe IN
X17 7 7X477DI_1B8_1B9_OUT + Sig.Position switch: Probe OUT, Signal 0 = Probe not OUT, Signal 1 = Probe OUT
X17 8 8X478DO_1S6_1S7_ACT + Sig.Push buttons 1S6 and 1S7 active, Signal 0 = 1S6 and 1S7 not active, Signal 1 = 1S6and 1S7 active
X17 9 9X479DI_1S6_IN + Sig.Probe manuel IN, Signal 0 = , Signal 1 = Move Probe IN
X17 10 10X4710DI_1S7_OUT + Sig.Probe manual OUT, Signal 0 = , Signal 1 = Move Probe OUT
X17 11 11X4711DO_Y4.3_FCL + Sig.Flange cleaning, Signal 0 = Y4.3 closed, Signal 1 = Y4 .3 open
X17 12 12X4712AI_PT100_1B3 Sig.Supply water (to KilnLoq) temperature (option), , ,
X17 13 13X4713Sig.
X17 14 14X4714Sig.
X17 15 15X4715AI_PT100_1B5 Sig.Return water (from KilnLoq) temperature (option), , ,
X17 16 16X4716Sig.
X17 17 17X4717Sig.
6/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 36
-
7/30/2019 Kilnloq Datasheet 270910.PDF
37/40
Cable list
Cable name ToFrom
MU-EXD-W1 (KilnLoqV
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Control signalsCable information :
X17 18 18X4718DO_Y4.4_CJC + Sig.Cooling jacket cleaning (option), Signal 0 = Y4.4 closed, Signal 1 = Y4.4 open
X17 19 19X4719DO_Y4.7_BB1 + Sig.Blow Back 1, Signal 0 = Closed, Signal 1 = Open
X17 20 20X4720DO_Y4.8_BB2 + Sig.Blow Back 2, Signal 0 = Closed, Signal 1 = Open
X17 21 21X4721DO_Y4.9_AIR + Sig.Air inlet, Signal 0 = Closed, Signal 1 = Open
X17 22 22X4722DO_Y4.10_VENT + Sig.Vent, Signal 0 = Closed, Signal 1 = Open
X17 23 23X4723DI_B4.2_PAL + Sig.Pressure alarm, Signal 0 = Pressure alarm, Signal 1 = OK
X17 24 24X4724DO_Y4.12 + Sig.Control valve for Sample valve Y4.11, Signal 0 = Closed, Signal 1 = Open
X17 25 25X4725DO_Y4.13 + Sig.Protection valve for P4.1, Signal 0 = Closed, Signal 1 = Open
X17 26 26X4726DI_B4.1_PAL + Sig.Water pressure (flow) alarm, Signal 0 = Failure, Signal 1 = OK
X17 27 27X4727DO_Y4.5_OPEN (12) + Sig.Shutter open, Signal 0 = Y4.5 Closed (12), Signal 1 = Y4.5 Open (12)
X17 28 28X4728DO_Y4.5_CLOSE (14) + Sig.Shutter close, Signal 0 = Y4.5 Closed (14), Signal 1 = Y4.5 Open (14)
X17 29 29X4729DI_1B10_Open + Sig.Shutter position OPEN, Signal 0 = Shutter closed, Signal 1 = Shutter open
X17 30 30X4730AI_PT100_A4 Sig.Temperature signal Extraction device, , ,
X17 31 31X4731Sig.
X17 32 32X4732Sig.
X17 33 33X4733AI_P4.1 + Sig.Probe underpressure sensor, 4-20mA, ,
X17 34 34X4734- Sig.
X17 PE PEX47shieldPE
7/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 37
-
7/30/2019 Kilnloq Datasheet 270910.PDF
38/40
Cable list
Cable name ToFrom
GMU-EXD-W2
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Temperature signalCable information :
X19 1 1X491AI_PT_100_E3 Sig.Temperature signal from filter heater E3, , ,
X19 2 2X492Sig.
X19 3 3X493Sig.
X19 PE PEX49ShieldPE
GMU-EXD-W3
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Temperature signalCable information :
X19 4 4X491AI_PT_100_E4 Sig.Temperature signal from pipe heater E4, , ,
X19 5 5X492Sig.
X19 6 6X493Sig.
X19 PE PEX49ShieldPE
GMU-EXD-W4
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Power supplyCable information :
X19 4U2 1U1X491PS_AC_E3 400 VACPower supply for filter heater E3, max 1.3 kVA
X19 4V2 1V1X492400 VAC
X19 PE PEX49PEPE
8/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 38
-
7/30/2019 Kilnloq Datasheet 270910.PDF
39/40
Cable list
Cable name ToFrom
GMU-EXD-W5
Term. row Term. no. Term. No.Term. rowWire.
GMU EXD
Signal informationTagname
mm 2Cross section :
Shield :
Extraction Device: Power supplyCable information :
X19 5U2 2U1X491PS_AC_E4 400 VACPower supply for pipe heater E4, max 2.1 kVA
X19 5W2 2W1X492400 VAC
X19 PE PEX49PEPE
9/ 9S-270910-Kilnloq-1-310-10
S-270910
Datasheet
Datasheet
0 27-09-10Field CabinetFLSmidth
Klostermarken 69550 MariagerTlf: +45 70102277
Project No. :
Customer:
End Customer:
Rev.
Drawing number:
Date. Ini. Remarks.FLSmidth Project :
Analysis system : Kilnloq system
The information transmitted by this document is the proprietary and confidential property of FLSmidth, and may not be duplicated, disclosed, or utilized without written consent from FLSmidth
Equip. no:
Equip. no:
Datasheet Kilnloq rev 270910 Page 39
-
7/30/2019 Kilnloq Datasheet 270910.PDF
40/40
Contact information:
Gas Analysis Technology
FLSmidth A/S
Klostermarken 6
Datasheet Kilnloq rev 270910 Page 40