KIEWIT FOUNDATIONS GROUP

Transcript of KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off...

Page 1: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

KIEWITFOUNDATIONS

GROUP

Page 2: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

NOBODY GETS HURTOur operations begin and end with safety.

Kiewit implemented job hazard analysis (JHA)

and mandatory personal protective equipment

(PPE) years before it was required by law.

At Kiewit, nothing is more important than safety.

Our craft-led safety programs and commitment at all

levels of our operations ensure our focus is on what

matters most: that nobody gets hurt. This commitment

to excellence extends to our quality, environmental and

compliance performance — which is how we drive

successful projects for our clients.

SAFETY FIRST

Led by craft on the front lines, Kiewit’s safety focus and engagement are SECOND TO

NONE.32

Page 3: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

KIEWITCULTURE

COREVALUES

MARKET CAPABILITIESKiewit has the proven experience at every stage of the project development life cycle. The earlier we get involved in project development and design, the more value Kiewit can provide clients.

DELIVERY METHODSConstruction | Design-Build/EPC | CM-at-Risk | CM-for-Fee | Design-Build, Operate, Maintain

PROCUREMENT MODELSTraditional | A+B | Best Value | Negotiated

SERVICESPreconstruction | General Contracting | Building Information Modeling | Construction Management | Engineering | Self-Performed Scopes of Work | LEED

With a strong local presence and access to a vast network of

industry experts, Kiewit can quickly mobilize and help design

the best solution and value for any project. From the smallest

jobs to the multi-billion dollar projects we build, our resources

and experience ensure clients receive the highest-quality,

hands-on service they’ve come to expect.

OUR VALUES

PEOPLE We care for the well-being of our people

and help them grow in their ability to be

successful.

EXCELLENCE We commit to excellence in all we do

with a focus on quality and continuous

improvement.

INTEGRITY We conduct our business and personal

affairs with the highest levels of integrity

and take responsibility for our actions.

STEWARDSHIP We preserve Kiewit’s unique culture to

build a stronger organization for future

generations of employees.

54

Page 4: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

OUR MARKETS

T R A N S P O R T A T I O N

P O W E R

W A T E R / W A S T E W A T E R

M I N I N G

B U I L D I N G

O I L , G A S & C H E M I C A L

Self-performing work results in

RELIABLE BUDGET AND SCHEDULE FORECASTS

WHAT SETS US APART?

Safety Record

Innovative Solutions

Depth of Expertise

ISO 9001:2008 Quality Program

Specialty Equipment

Self-Performance

Keeping safety at the forefront, the Kiewit Foundations Group self-

performs complex geotechnical projects across North America.

We deliver creative, cost-efficient solutions that are responsive to

each project’s specific site conditions. We utilize value engineering

and constructability reviews, and our depth of expertise to offer

constructible solutions that optimize budget and schedule. We

perform these operations with our fleet of specialty equipment and the

management resources of one of the top builders in the country.

OURSERVICES

CUT-OFFWALLS

STRUCTURALSLURRY WALLS

DRILLEDSHAFTS

GROUNDIMPROVEMENTS

76

Page 5: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

Gulf Intracoastal Water Way West Closure Project, West Bank, Mississippi River, LA | Slurry-trench for 85,000 sf soil bentonite slurry cut-off wall along the WBV levee

Metro PAR 1085 Project, Denver, CO | Sheet pile and cement bentonite cut-off wall to eliminate deep excavation seepage

Lower Mattagami River Project, Kapuskasing, ON | 5,050 sf cut-off wall to support construction to repair and replace four hydroelectric generating stations

Cannelton Hydroelectric Cofferdam Cut-off Wall, Owensboro, KY | Self-hardening cement bentonite cut-off wall as part of a dewatered and excavated cofferdam

Dam Repair | Temporary and Permanent Water-Tight Enclosure

CUT-OFF WALL

Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA

950 LF cut-off wall in the core of the dry dock bund wall for water-tight graving dock.

98

Page 6: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

Deep Rock Tunnel Connector, Indianapolis, IN | Cement bentonite soldier pile application for three open-cut excavations totaling 69,400 sf.

World Trade Center East Bathtub Slurry Wall, New York, NY | 53 slurry wall panels of depths of 75-110 feet to form the basement of the PATH station and new World Trade Center Site

Clinton CSO, Syracuse, NY | Triple box culvert constructed using slurry wall construction and a jet grout plug with cement bentonite wall for a base groundwater cutoff

Harbor Siphon Slurry Wall, Brooklyn & Staten Island, NY | Excavation, reinforcement, and concrete for a slurry wall as part of two launch shafts for a tunnel

Tunnel Shafts | Building Foundations | Open Cut Excavation Support

STRUCTURAL SLURRY WALL

Metropolitan Transportation Authority, Long Island Rail Road East Side Access Bellmouth, New York, NY

45,000 cubic yard, open-cut excavation supported by a 28,300 sf slurry wall, 51 high-capacity tiebacks, sheet piles, concrete walers and steel bracing.

1110

Page 7: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

Tappan Zee Bridge, Tarrytown, NY | 24 ea 48” diameter shafts w/ 42” Rock Sockets for the Westchester Abutment and initial pier

Metro-North Rail Road Embankment Stabilization, Cortland Manor, NY | Installation of 20 48” diamenter drilled shafts to stabilize the railroad embankment along the Hudson River

PSE&G Susquehanna-Roseland Transmission Line, NJ and PA | 145 mile transmission line requiring installation of large diameter reinforced concrete drilled shaft foundations

Farrington Guideway, Honolulu, HI | 500 ea 2.2m – 2.5m diameter shafts for an elevated railway

Transmission Lines | Bridge | Rail | Large Diameter Caissons | Soundwalls | Buildings

DRILLEDSHAFTS

Technical experts manage and maintain our

SPECIALTY EQUIPMENT

Cove Point LNG Export Facility, Lusby, MD

395 ea 60” diameter shafts for 70’ tall soundwall, a large piperack and five tower cranes;

283 ea 24” – 48” diameter shafts for pipe racks in a congested and live LNG plant

1312

Page 8: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

Center Hill Dam, DeKalb County, TN | 1,643,000 gallons of cement permeation grouting for groundwater cut-off and pre-treatment for a barrier wall

Cooper Nuclear Station, Brownville, NE | Chemical grouting around pipe penetrations through a cofferdam

Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA | Vibroflotation of hydraulically placed material to allow for cut-off wall construction

Cannelton Hydroelectric Cofferdam Vibroflotation, Owensboro, KY | Vibroflotation to densify hydraulically placed sand to ensure stability during excavation of the cut-off trench

Grouting | Soil Mixing | Vibroflotation

COST-EFFECTIVE SOLUTIONS

in challenging soil conditions.

GROUNDIMPROVEMENTS

Virboflotation operation at Cannelton Hydroelectric Cofferdam

1514

Page 9: KIEWIT FOUNDATIONS GROUP · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting for groundwater cut-off and

10/2015

Kiewit Infrastructure Co.

302 S. 36th Street, Suite 400

Omaha, NE 68131

(402) 346-8535