![Page 1: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/1.jpg)
Seite 1 WWV/ KIP
Presentation
KIB – GmbH
![Page 2: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/2.jpg)
Seite 2 WWV/ KIP
KIB GmbH
Kirchenbauer Ingenieur Büro GmbH
Siemensstr. 1
D- 85716 Unterschleißheim
Markus Kirchenbauer, Dipl.-Ing. (FH)
Managing Director
Fon: +49(0)89-726310110
Fax: +49(0)89-726310163
Email: [email protected]
Web: www.kib-gmbh.de
Foundation: 1999
![Page 3: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/3.jpg)
Seite 3 WWV/ KIP
The KIB- GmbH was founded in 1999.
In all areas of plant design all engineering services from basic to detail
engineering of site arrangement, pipe and steelwork engineering will be
provided.
Our experience from numerous national and international projects and the
various tasks, we can pass on to our customers in the form of individual
problem and customer-oriented solutions.
In the design and calculation as well as in site service, we assure you
targeted finding solutions and unrivalled expertise.
A powerful team combines innovative solutions with customer-specific
requirements.
![Page 4: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/4.jpg)
Seite 4 WWV/ KIP
![Page 5: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/5.jpg)
Seite 5 WWV/ KIP
Fields of activity
Conceptual design
Process engineering
Arrangement design
Pipe design
Air channel design
Calculation
Steel construction
Construction-design services
![Page 6: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/6.jpg)
Seite 6 WWV/ KIP
Areas of activity
Power plant technology
Exhaust cleaning systems
Petrochemicals
Tank farms
Pipeline pumping stations
![Page 7: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/7.jpg)
Seite 7 WWV/ KIP
Staff
Project/Team Manager 5
Calculator 7
CAD Designers 20
PDMS Administrative 5
Organization 2
Experience
Design and construction experience for more than 15 years
![Page 8: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/8.jpg)
Seite 8 WWV/ KIP
Conceptual design
Implementation of requirement analysis
Development of sound design fundamentals
Creation of process flow sheets
Conceptual arrangement design
Fixing of routing areas
![Page 9: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/9.jpg)
Seite 9 WWV/ KIP
Dimensioning of aggregates
Pipe dimensioning
Lost pressure calculation
Insulation dimensioning
Creation of equipment schemes
Process engineering
![Page 10: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/10.jpg)
Seite 10 WWV/ KIP
3D Equipment arrangement,
2D Layout drawings
Arrangement design
![Page 11: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/11.jpg)
Seite 11 WWV/ KIP
3D – Equipment arrangement
![Page 12: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/12.jpg)
Seite 12 WWV/ KIP
2D - Arrangement drawings
![Page 13: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/13.jpg)
Seite 13 WWV/ KIP
Focus 2D - Arrangement
![Page 14: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/14.jpg)
Seite 14 WWV/ KIP
Basic design
Detail design
Support design
Pipe overview drawings
Detail isometrics
Piping design
![Page 15: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/15.jpg)
Seite 15 WWV/ KIP
Overview drawing
![Page 16: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/16.jpg)
Seite 16 WWV/ KIP
Excerpt pipe plan
![Page 17: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/17.jpg)
Seite 17 WWV/ KIP
Fabrication detail isometric
![Page 18: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/18.jpg)
Seite 18 WWV/ KIP
Air- and exhaust channel design
Detailed design in 3D - model
Output of 2D - fabrication
drawings
![Page 19: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/19.jpg)
Seite 19 WWV/ KIP
Air channel production drawings
![Page 20: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/20.jpg)
Seite 20 WWV/ KIP
3D Detailed platform design
3D Secundary support steel design
2D Fabrication drawings
Steel constructions
![Page 21: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/21.jpg)
Seite 21 WWV/ KIP
3D detailed platform design
![Page 22: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/22.jpg)
Seite 22 WWV/ KIP
Support structure design
![Page 23: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/23.jpg)
Seite 23 WWV/ KIP
Detailed support design
![Page 24: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/24.jpg)
Seite 24 WWV/ KIP
Support steel fabrication drawing
![Page 25: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/25.jpg)
Seite 25 WWV/ KIP
Support steelwork fabrication drawing
![Page 26: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/26.jpg)
Seite 26 WWV/ KIP
Steelwork fabrication drawing of platforms
![Page 27: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/27.jpg)
Seite 27 WWV/ KIP
Steel construction fabrication drawing
![Page 28: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/28.jpg)
Seite 28 WWV/ KIP
CAD/CAE-PROGRAMS
AVEVA PDMS 3D
AUTODESK ACAD 2/3D
BENTLEY Microstation
AUTODESK Inventor
BENTLEY Pro Steel
![Page 29: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/29.jpg)
Seite 29 WWV/ KIP
Calculation
Pipe structure of HP, MP and LP systems
technical interpretation of HP, MP and LP
components FEM calculation
pressure test definition
dimensioning of components
creating pipe classes according to EN13480,
FDBR, ISO14692 and ASME
R-Stab calculation, structural analysis
program for planer and spatial frameworks
![Page 30: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/30.jpg)
Seite 30 WWV/ KIP
Calculation programs
SIGMA Rohr2
ANSYS
DLUBAL R-Stab
![Page 31: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/31.jpg)
Seite 31 WWV/ KIP
Site support
Construction and site support
As-Built-Documentation
3D Laserscanning
![Page 32: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/32.jpg)
Seite 32 WWV/ KIP
Satisfied customers
Schmidt + Clemens
![Page 33: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/33.jpg)
Seite 33 WWV/ KIP
Operator: Großkraftwerk Mannheim
Customer: WWV–Wärmeverwertung
Typ: Steam generators
Period: 2010-2013
Services:
• MP/LP design
• Basic Engineering
• Detail Engineering
• Pipe stress analysis
• 1.300 pipes
GKM 9
![Page 34: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/34.jpg)
Seite 34 WWV/ KIP
Operator: ENBW
Customer: WWV – Wärmeverwertung
Typ: Steam generators
Period: 2009 - 2012
Services:
• HP design small pipes
• Pipe stress analysis
• Support steel work
RDK 8
![Page 35: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/35.jpg)
Seite 35 WWV/ KIP
Operator: RWE Power
Customer: Kurotec
Typ: Steam generators
Period: 2009 - 2012
Services:
• Pipe design main cooling water pipes
• DN 200 – DN 3600
• GFK
• Pipe stress analysis
• FEM calculation
Eemshaven
![Page 36: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/36.jpg)
Seite 36 WWV/ KIP
Operator: EVN
Customer: EVN Umwelt
Typ: Incineration plant
Period: 2004 - 2006
Services:
• Pipe design of all systems
• Arrangement design
• Pipe stress analysis HP, MP – and LP Systems
• Design coordination
MSZ3 Moskau
![Page 37: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/37.jpg)
Seite 37 WWV/ KIP
Operator: Flachstahlwerke Salzgitter
Customer: VAM – Wels
Typ: Gaskraftwerk
Period: 2007 - 2009
Sevices:
• Pipe design of all systems
• Basic – und Detailengineering
• Arrangement design
• Pipe stress analysis HP, MP- and LP systems
• Support design
Salzgitter
![Page 38: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/38.jpg)
Seite 38 WWV/ KIP
Operator: EON
Customer: FISIA Babcock Environment GmbH
Typ: Steam generators
Period: 2011
Services:
• Bracket- and support design
Maasvlakte
![Page 39: KIB GmbH · 2018-05-24 · Seite 3 WWV/ KIP The KIB- GmbH was founded in 1999. In all areas of plant design all engineering services from basic to detail engineering of site arrangement,](https://reader033.fdocuments.us/reader033/viewer/2022041912/5e67cde1ce9dcf23f40396ed/html5/thumbnails/39.jpg)
Seite 39 WWV/ KIP
Operator: Lenzing AG
Customer: Lenzing AG
Typ: Fiber production plant
Period: 2012 - 2013
Services:
• Pipe design of all systems 2.700 pieces
• Basic – and Detailengineering
• FEM-Calculation
• Pipe stress analysis
• Support design
LENZING AG
67KT