Khalifa Port
Transcript of Khalifa Port
5TH ANNUAL GLOBAL INFRASTRUCTURE LEADERSHIP FORUM
-‐4 -‐3 -‐2 -‐1 0 +1 +2 +3 +4
Abu Dhabi UAE
Abu Dhabi’s Strategic Position in the World
www.ADPC.com
Abu Dhabi-‐ Strategic Loca8on
2030 Economic Vision Abu Dhabi
www.ADPC.com
Stable and Sustainable growth
2008: $104 billion
2030: $416 billion
ADPC Movie
www.ADPC.com
Abu Dhabi Island
Kizad Area A
Kizad Area B
Khalifa Port
Dubai
E11 Sheikh Khalifa Road
6 Khalifa Port & Kizad Loca8on
Key Areas
7
Key Areas Off-Shore Port Area (Phase 1A) 2.7 Km2
On-Shore Port Area 3.5 Km2
Industrial Zone Area A 51 Km2
Industrial Zone Area B (Future) 366 Km2
Total 423 Km2
Singapore 693 Km2
Industrial Zone Area B Phase 2
Industrial Zone Area B Phase 1
Industrial Zone Area A
On-Shore Port Area
Off- shore Port Area
Khalifa Port and Kizad
Project Magnitude
www.ADPC.com
Abu Dhabi Island
Khalifa Port & Kizad
Singapore
Dubai
Abu Dhabi
To AlAin
Connec8vity-‐ Access to global Markets
Sea Road Rail Air
Khalifa Industrial Zone Abu Dhabi
Area A is 51 sq kms Divided into specific area clusters for industrial activities such as: • Aluminium • Steel • Petrochemicals and Chemicals • Paper, Print and Packaging • Pharmaceuticals and Healthcare
Equipment • Food • Trade and Logistics • Engineered Metal Products • Mixed Use and Others
Area B is 366 sq kms
In total, 417 sq kms
Kizad
11
• Dredging / Reclamation 45M m3 • Main & EMAL Quay Walls (16m draft) 4 Km • Revetments 18 Km • EMAL Trestle Bridge 1.6 Km • Utility and Causeway Bridges (each) 1.0 Km
(ea) • Environmental & Wave Attenuation Breakwaters 8 Km
Khalifa Port
www.ADPC.com
Khalifa Port Layout-‐ Dredging and Reclama@on Phase (2007-‐2010)
• 1 km quay- Container Terminal
• 1.2 km quay- general cargo
• 800 m quay- multipurpose berth
• 800 m dedicated berth for Emirates Aluminum (Emal)
• Flexible Master plan
for development in stages
Khalifa Port and Kizad Capex $7.2 Billion
13
Total: $ 4.3B
Design: Scott Wilson/URS, Moffat & Nichol, Mouchel ME, Atkins $ 64M
Construction: KPMC – Marine Structures, Dredging & Reclamation $ 1.6B
Al Jaber/Ghantoot – Earthworks $ 273M
Al Jaber/GIS – Port Special Systems $ 100M
Larsen & Toubro, Ltd. – MV Power System $ 84M
Al Habtoor Leighton Group – Onshore Civil and Buildings $ 308M – Industrial Zone Primary Infrastructure Central & South $ 327M
Ed Zublin/Al Jaber – Offshore Civil and Buildings $ 276M
Hyundai Engineering & Consortium Co. – Offshore Terminal Area $ 329M
CCC – Industrial Zone Area Infrastructure North $ 141M
Total: $ 4.3B
Khalifa Port and Kizad Major Contracts
www.ADPC.com
KPIZ Project Overview 14
Planned Khalifa Port Capacity:
Key Figures
www.ADPC.com
Traffic Type Stage 1A (2012)
Full Development (2030)
Comments
Containers 2 MT/Yr 15 M TEU/Yr Twenty-‐foot Equivalent Units (TEU)
General Cargo (Incl. Bulk)
15 MT/Yr 35M TEU/Yr Machine Parts, Cable, Drums, Iron Ore, Cement Clinker, etc.
KHALIFA PORT 95% COMPLETE Overall megaproject completion: 90%
www.ADPC.com
Ship to Shore Crane, ZPMC/TMEIC o 65 m outreach, 22 wide vessel
o 44 m height under spreader o 110 ton rated load, ready for 2 x 40’
o single hoist twin li] o 38 m back reach for future full automa@on
o Max-‐view semi-‐automa@on
www.ADPC.com
Ship to Shore Cranes
Port Operation Q4 2012
Coral Reef Protec@on
www.ADPC.com
FLYOVER FILM (2.30)
www.ADPC.com
www.portsandtrade.com
www.ADPC.com
Thank You