KG 0 2 eN Ba NPA CONCRETE RESURFACER CONCRETE
Transcript of KG 0 2 eN Ba NPA CONCRETE RESURFACER CONCRETE
152CarringtonStreet,
Revesby,New
SouthWales
TEL
(02
)9
77
37
15
5FACSIMILIE
(02)97737493
DA
TE:- W
AR
NIN
G!
CO
LOU
RS
RE
PR
ES
EN
TED
ON
THIS
DIG
ITA
LP
RO
OF
MA
YV
AR
YFR
OM
STO
CK
PAP
ER
SU
SE
DIN
THE
MA
NU
FAC
TUR
ING
OF
BA
GS
.
CU
STO
MER
:-
DES
CR
IPTI
ON
:-
PRO
D.
No.
1./
....
....
....
....
....
....
....
....
....
...
FIN
ISH
LEN
GTH
FAC
EW
IDTH
PAPE
RW
IDTH
PAPE
RTY
PE
BA
GS
IZE
:-
Iacc
eptr
esp
onsi
bili
tyfo
rth
eus
ea
nd/
ora
ltera
tion
ofa
nyre
gis
tere
dor
tra
dem
ark
ma
teri
alc
onta
ined
with
inth
isa
rtw
ork.
TER
MS
AN
DC
ON
DIT
ION
S.
"Whe
reth
ep
urch
ase
ra
pp
rove
sa
nya
rtw
ork
orp
roof
ssu
bm
itted
by
the
com
pa
ny,
the
com
pa
nyw
illno
tbe
liab
lefo
ra
nyer
rors
orin
acc
ura
cies
sub
seq
uent
lyd
isco
vere
din
the
goo
ds
ora
nyw
ork
per
form
edor
pro
duc
edb
yth
eco
mp
any
inth
eco
urse
ofp
rod
ucin
gth
eg
oo
ds.
"
AR
T&
PLA
TER
EQ
UIR
EM
EN
TS
AR
TO
NLY
NO
PA
TCH
ES
20
27
55
9P
LATE
RE
QU
IRE
ME
NTS
Iha
vech
ecke
dth
isp
roof
for
spel
ling
and
layo
uta
ndhe
reb
ya
pp
rove
this
job
top
roce
edw
ithm
anu
fact
urin
g.
Cu s
tom
ers
Sig
n at u
r e:
Da
te:
PRIN
TC
OLO
UR
S
CU
STO
MER
APP
RO
VAL
EX.
PRO
D.
No.
BAG
STY
LE:-
P.S.
R.
No.
20
98
48
VPE
20
91
38
12
40
9
43
5
CU
TLE
NG
TH5
60
CYL
IND
ERSI
ZE5
60
37
5
BOTT
OM
WID
TH1
00
77
0SE
MPO
RW
U
BUIL
DER
SC
EMEN
T2
0K
G
CEM
ENT
AU
STR
ALI
A(C
LYD
E)
BLA
CK
PMS
32
98
GR
EEN
AC
CO
UN
TM
AN
AG
ER:-
2./
....
....
....
....
....
....
....
....
....
...
3./
....
....
....
....
....
....
....
....
....
...
4./
....
....
....
....
....
....
....
....
....
...
5./
....
....
....
....
....
....
....
....
....
...
6./
....
....
....
....
....
....
....
....
....
...
AP
NB
ar
co
de
Nu
mb
er
93
11
80
80
12
19
7
JOH
NVA
SSIL
IOU
SCA
LE:-
TER
MIN
AL:
-St
atio
n
WO
RK
TIC
KET
No:
-
%3
32
50
52
00
4/
/
1
51
72
AM
END
MEN
TS:-
DA
TE:-
2.
25
/0
5/
20
04
.
2.
ALT
ERA
TIO
NTO
LIFT
LOG
O.
PLATE
THICKNESS
112
185
THIS
PROO
FIS
ASP
ECIF
ICAT
ION
FOR
PRIN
TLA
YOUT
.THE
SESP
ECIF
ICAT
IONS
ABOV
EAR
ECU
RREN
TFO
RTH
EDA
TEOF
ISSU
EAN
DM
AYBE
SUBS
EQUE
NTLY
AMEN
DED.
Cus
tom
erO
rder
Num
ber
:
560 - 435 x 375 x 100 - 770
20KG
AFTER 28 DAYS
30MPA
POLYMER MODIFIED
FOR SUPERIOR BOND
WALK ON IN 12 HOURS
DRIVE ON IN 30 HOURS
16.1 to 40kgThis product requires a two person lift
- use proper lifting techniques
20NETKG
SAFETY ADVICE
Made in Vietnam by Dingo Building Products Co.,Ltd Nhon Trach I-IZ, Nhon Trach Dist., Dong Nai Pro.
Manufactured by: Dingo Cement Pty Ltd8 / 25-37 Huntingdale Road, Burwood Victoria 3125
DISCLAIMER: Recommendations and advice regarding the use of this product are to be taken as a guide only and Dingo Cement Australia Pty Ltd shall not be liable for any inaccuracy in the information for any loss, injury or damage resulting from its use. To the full extent permitted by the law. Dingo Cement Australia Pty Ltd's liability is limited at its discretion, to the replacement of the goods or the supply of equivalent goods.
P: +61 3 8080 1420 F: +61 3 8080 1421 [email protected]
THIS PRODUCT CONTAINS CEMENTRISK• Cement powder and sand dust is irritating to the eyes, respiratory system and skin. It
may cause sensitisation through skin contact (dermatitis).SAFETYSafe Handling• Avoid contact with the skin and eyes.• Wear suitable protective clothing, boots, gloves and eye protection.• Avoid breathing dust by wearing suitable repiratory equipment.• Manual handling of this bag without due care and attention could result in personal
injury. Unless you are trained in manual handling of heavy loads, it is recommended that you share the load with another person.
FIRST AID• Eyes: Rinse immediately with plenty of clean water.• Inhaled: Move immediately to fresh air.• Swallowed: Wash mouth with water. Do not induce vomiting. Drink water or milk to
dilute stomach contents. Seek medical attention.• Skin: Wash immediately with clean water. (Seek medical attention if irritation persists).SAFETYDisposal• This material and its package must be disposed of in a safe way.• Do not empty into drains. Spills may be vacuumed or swept. Avoid generation of dust.Additional information is listed in the Material Safety Data Sheet.
20NETKG
16.1 to 40kgThis product requires a two person lift
- use proper lifting techniques
CONCRETERESURFACER
CONCRETE RESURFACER
MAKE OLD CONCRETELOOK LIKE NEW!
MAKE OLD CONCRETELOOK LIKE NEW!
Surface Preparation
1. Cleaning Old concrete must be rigorously cleaned to ensure proper adhesion of MaxPRO Concrete Resurfacer to the old surface. In order to remove oil and grease you may pre-wash the surface with hydrochloric acid.
2. Pressure Washing Pressure wash thoroughly with a 24Mpa pressure washer. Note. This step is essential in order to ensure a proper bond.
3. Repairs Level any spalled areas, pits or cracks with MaxPRO Concrete Resurfacer that has been mixed to a trowelable consistency. (Use approximately 1 part water to 7 parts Concrete Resurface, by volume.) Trowel on MaxPRO Concrete Resurfacer level over areas to be repaired. Allow the repairs to hard before continuing to resurface the entire area.
Mixing instructions
1. Mix in a 19L bucket with a 12mm drill and paddle mixer.
2. Use approximately 3.5L of water for each 20kg bag.
3. Add the MaxPRO Concrete Resurfacer powder to the water and mix for about 5 minutes to a lump-free, pourable consistency. If mix is too thick, add water SPARINGLY to reach the desired consistency.
The correct consistency is obtained when a 270ml cup of MaxPRO Concrete Resurfacer spreads to approximately 200mm when poured on a flat, non-absorptive surface. Larger quantities can be mixed using a mortar mixer.
Application instructions
1. Section off the work into areas no larger than 13.4m2. It is essential that control joints and expansion joints are maintained. Use weather stripping or duct tape to prevent MaxPRO Concrete Resurfacer from spilling into joints.
2. Saturate the surface with water from a hose, and then remove any standing water with a long handle industrial squeegee.
3. Pour MaxPRO Concrete Resurfacer mixture from bucket on to surface.
4. Using the long handle squeegee spread the MaxPRO Concrete Resurfacer mixture across the surface. Use the squeegee to scrub the material into the surface smoothly.
5. For a slip resistant professional finish, follow within five minutes with a large push broom, making full strokes across the entire distance of the current work area without stopping. If desired, a concrete edging tool can be used within 20 minutes of pouring.
6. For thicker applications, use additional thin layers of MaxPRO Concrete Resurfacer, building up to the desired thickness, or use a trowel-applied layer after the initial squeegee application. For trowel-applied mixes, reduce the water to approximately 2.9L per 20kg bag.
Squeegee/Trowel Application Brush Applied Finish Broom Applied Finish
Make old concrete look like new using MaxPRO Concrete Resurfacer and following our step-by-step instructions. MaxPRO Concrete Resurfacer is a special blend of Portland cement, sand, polymer modifiers and other additives designed to provide a shrinkage compensated repair material for making thin repairs to sound concrete which is in need of surface renewal. MaxPRO Concrete Resurfacer will provide a durable wear
resistant surface designed to withstand heavy foot traffic and vehicle traffic. Use MaxPRO Concrete Resurfacer for large applications such as driveways, walkways, sidewalks and patios. MaxPRO Concrete Resurfacer can be trowel applied for smaller applications or applied with a masonry brush for curbs or steps. Concrete Resurfacer provides an economic alternative to removing and replacing existing old, spalled concrete.
INSTRUCTIONS
• Pressure washer• Steel finishing
trowel• Large industrial
squeegee (with long handle)
• Drill with paddle mixer
• 19 litre mixing bucket
• Hammer• Chisel• Gloves • Safety goggles • Broom• Masonry brush• Weather stripping
or duct tape• Garden hose
ADVERSE TEMPERATURE CONDITIONS Cold Weather: Do not apply at temperature below 10°C. In cold weather, use warm water 50°C to speed setting time. Allow longer curing time prior to use.
Hot Weather: Work in shaded areas or during the cooler times of the day, and use ice water when mixing to slow the setting time.
Limitations: Temperature, wind velocity, direct sunlight or shading, as well as the dampness or dryness of the surface receiving material, will have an effect on the finished depth of colour. Do not apply to painted or sealed surfaces. Old cracks may reappear dur to movement in base concrete.
Curing Instructions: Under normal conditions no special curing is required. Temperature should remain above 10°C for 8 hours. Protect surface from freezing for 24 hours after applying. Protect from rain for at least 6 hours Do not cover unless immediate rain protection is necessary. When temperatures exceed 32°C, moist cure with fog spray for 24-48 hours after applications.
CONCRETE RESURFACER CALCULATOR
Squeegee Applied at about 1.3mm
Square Metre (M2) 3.3 8.4 18.6 27.9 46.5
Less than 1.6mm thickness - Approx No. of bags 1 1 3 4 6
Thicker Applications
3mm thickness avg - Approx No. of bags 1 3 6 9 15
6mm thickness avg - Approx No. of bags 2 6 12 17 29
9mm thickness avg - Approx No. of bags 3 8 17 26 43
All yields are approximate and do not allow for waster or uneven sub-grade etc.
TOOLS
9 346665 0010779 346665 001077
BE
FO
RE
AFT
ER
MA
KE O
LD
CO
NC
RET
ELO
OK
LIK
E N
EW
!CO
NCRE
TERE
SURF
ACER
BE
FO
RE
AFT
ER
MA
KE O
LD
CO
NC
RET
ELO
OK
LIK
E N
EW
!CONCRETERESURFACER