Key Projects
May 8, 2013
Columbia St. PD • 126-‐room, 6-‐story Hampton Inn & Suites (hotel)
• surface parking lot
• 102,300 sq. ft., 10-‐story medical office building
• limited ground-‐level parking and 4 floors of structured parking
Site Plan
Sligh Blvd. and Columbia St. Roadway Improvements � Scope • Resurfacing, restora@on and rehabilita@on of the roadway. • Opera@onal improvements at the intersec@ons to accommodate future poten@al BRT expansion, bus routes and freight delivery.
� Schedule • Procurement – Current, Tenta@ve Council Date 6/17 • Design – 2013/2014 • Construc@on – 2014/2015
� Funding • $4,033,440 from FDOT
Columbia Street -‐ Proposed
Sligh Boulevard -‐ Proposed
Amtrak Sta@on
• historic rehabilitation project • will rectify a lot of deferred maintenance and correct ADA issues. • the HVAC will be relocated to the roof so as not to be visible. • New lighting fixtures, water fountain, gutters
Amtrak
Orlando Health projects � A new bed tower extending west from the corner of ORMC � 345,000 sq. ft. � • 196ft. High (11 stories) � • 192 hospital beds
� An expansion of the core ORMC building, including an addition onto the existing Emergency Department � 90,000 sq. ft. addition � • 70ft. 8 in. to highest point of structure (four stories)
Orlando Health
Orlando Medical Plaza
� Phase 1: � new 8 story hotel between the two existing medical office buildings (1315 and 1405 S. Orange Avenue).
� New ground floor entrance lobby and plaza and 60 hotel rooms
� Phase 2: � add 12 hotel rooms to 2nd level of 1315 S. Orange building
� add 13 hotel rooms to the 3rd level of that building and cosmetic renovations to the exterior of the building.
Wendy’s
Wal-‐Mart Neighborhood Market
47,635 sq. ft.
Open June 26
Noodles
Wawa