Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161'...

36
Keynote Address Cox Convention Center, Oklahoma City, OK

Transcript of Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161'...

Page 1: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Keynote Address

Cox Convention Center, Oklahoma City, OK

Page 2: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 2

✓ Introduction• About Keynote Speaker• About Proline Energy Resources Inc

✓ Economic Impact of Artificial Lift Strategies• Commodity Prices (Oil and Gas)

✓ Artificial Lift (AL) Market Share

5 MINUTES OPEN DISCUSSION

✓ Regional Artificial Lift Strategies & Drivers

5 MINUTES OPEN DISCUSSION

✓ Artificial Lift Strategies - Understanding our job• Wellbore Fluid Evacuator

✓ Unconventional Technology Adaption & Application✓ Late Life Problem

• Going back to the basics• Going Beyond Conventional

✓ Key Take Away

Q&A

Table of Content

Page 3: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 3

✓ 25 Years Industrial Experience

✓ Leading expert in Artificial Lift, Well Recompletions, Production Optimization & Operations

✓ Author of several publications in Artificial Lift and Production Optimization & Operations

✓ Diverse experience in many US petroleum producing basins & international

✓ Master in Petroleum Engineering degree at the University of Houston

✓ Previously Worked for NOC, Texaco, Valero Energy, Schlumberger, BP, BassPet (BOPCO)

Peter OyewolePresident

Proline Energy Resources Inc

About Keynote Speaker

Page 4: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

✓ Acquire non/under optimized assets

✓ Focus on Liquid/Oil Rich Gas Assets

✓ Leveraging exceptional in-house skills in ARTIFICIAL LIFT APPLICATION acquired in both Onshore US Gas basin and various international oil and gas fields

✓ Add value to all Stakeholders owners through best practices in base production management

✓ Deploy organizational efficiency to reduce lifting cost

About Proline Energy Resources Inc

Mission

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 4

Page 5: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Proline Energy Resources Inc

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 5

Primary Focus Area

Page 6: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Proline’s Asset Overview

Proline Locations

❑ 550 Operated Wells (Q1-2019)

❑ 70 Non-Operated Wells (Q1-2019)

❑ >85,000 Gross HBP Acreage

❑Current Reserves Estimates

❑>200 BCF

❑ >4 MMBO

❑Production ~15MMcfed (~ 30

% Liquid )

❑Austin Chalk, ETX Haynesville,

Cotton Valley, STX Eagle Ford &

Conventional Oil & Gas Play –Frio,

Yegua, Vicksburg, Wilcox

❑ 85 Miles of Pipeline

❑ ALL AL Type except ESP & PCP

❑ 2 Swab Rigs

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 6

Page 7: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 7

Artificial Lift Strategies

CONVENTIONAL BEYOND

CONVENTIONAL

Crude Oil WTI Prices (1989 to 2019)

45

60

Pe

r b

bl

Page 8: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 8

Artificial Lift Strategies

Page 9: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 9

Artificial Lift Strategies

Natural Gas Henry HUB Prices (1989 – 2019)

Pe

r M

MB

TU

CONVENTIONAL BEYOND

CONVENTIONAL

2.50

3.50

Page 10: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 10

Artificial Lift Strategies

US NATURAL GAS PRODUCTION

BC

FD

Page 11: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 11

Artificial Lift Strategies

Page 12: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 12

Artificial Lift StrategiesAs laid out several times before, 2019 is a big expansion year for LNG export capacity with year-end capacity at almost 9 bcf/d (assuming all projects indeed come on line as scheduled). We would be quite bullish

for overall market pricing with this single factor were it not for the extremely high and fast-rising U.S. production levels - the pace of such

increases possibly to likely to continue into 2019. Still, this is a significant mitigating factor that will somewhat offset plentiful U.S.

supply. Current feed-gas levels in January are already averaging around 4.0 bcf/d.

Longer term however, we do expect the overseas price arbitrage to contract with the dampening effect of lower crude prices and a

substantial amount of LNG export capacity coming on line domestically and globally (going to become a crowded trade).

Page 13: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Economic Impact of

ExxonMobil, Qatar bet on U.S. gas export with $10 billion Golden Pass

Project (World oil)

The investment from Qatar, the world’s biggest seller of LNG, comes as the nation

seeks to pour $20 billion into America’s oil and gas fields

Venture Global’s Calcasieu Pass facility in Louisiana

Royal Dutch Shell Plc’s Lake Charles joint venture in Louisiana with Energy Transfer LP

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 13

Artificial Lift Strategies

US LNG FUTURE EXPORT CAPACITY

Page 14: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

✓ 2 million oil wells in the world -50% on AL - PetroWiki

✓ >95 percent of all U.S. oil wells and several gas wells

✓ Global AL Market $8.9 billion (2017) – Spears & Associates

✓ US in leading position

✓ COST EFFECTIVE - Stripper wells and increasing Horizontal Wells is the biggest opportunity for the market

Artificial Lift (AL)

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 14

Market Share

Page 15: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 15

5 MinutesOPEN

DISCUSSION

Page 16: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Artificial Lift

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 16

Categories

Reservoir PressureDriven

1 Plunger lift (PL)

2 Surface control lift (WCL) - compressors, ejectors etc.

3 Foam lift (FL)

4 Velocity string lift (VSL) - tubing size reduction

FluidDriven

5 Gas lift (GL)

6 Gas lift assisted plunger lift (GLAPL)

7 Downhole ejector lift (DEL) - gas powered

8 Hydraulic jet pump (HJP)

Mechanical Driven

9 Electric submersible pump (ESP)

10 Hydraulic submersible pump (HSP)

11 Hydraulic piston pump (HPP)

12 Downhole multiphase pump (DMP)

13 Rod pump (RP) - including hydraulic Prime Mover

14 Rod driven progressive cavity pump (RD-PCP)

Page 17: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Regional Artificial Lift

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 17

Strategies & Drivers Giant Permian Basin

Page 18: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Regional Artificial Lift

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 18

Strategies & Drivers Eagleford & STX Basin

Page 19: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Regional Artificial Lift

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 19

✓ “Giant Permian Basin” = ESP, Rod Pump, GL, PAGL

✓ Eagleford = GL, PAGL, Rod Pump GL, PAGL

✓ Bakken = Rod Pump, ESP

✓ Haynesville Shale & ETX Tight Gas = Plungers, PAGL, GL, Rod Pump

✓ Marcellus and Utica shales = Plungers, GL, PAGL

✓ Rock Mountains = Plungers, GL, Rod Pump, PCP

Strategies & Drivers

Haynesville & ETX Tight Gas Shale

Page 20: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Regional Artificial Lift

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 20

Strategies & Drivers

180 Day GOR’s Plot –2nd Bone Spring Sand Horizontal

Reservoir Characterization and Fluid Phase Behavior

Page 21: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 21

5 MinutesOPEN

DISCUSSION

Page 22: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Artificial Lift Strategies

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 22

Wellbore Fluid Evacuator

KB @ 478'

GL @ 448'

COMPLETION DATE: 8/2010 CURRENT WBD

PRODUCTION TUBING - 9/8/10

16" CONDUCTOR 311 JTS 2-3/8" 4.6# 8rd L-80 TBG

2-3/8" 'X' NIPPLE @ 9,911' MD/TVD

7 JTS 2-3/8" 4.6# 8rd L-80 TBG

BAKER HORNET PKR @ 10,140' MD (10,126' TVD)

6' X 2-3/8" 4.7# N-80 8rd PUP JT

1.875" X-NIPPLE

1 JT 2-3/8" 4.6# N-80 TBG

SURFACE CASING 1.875" XN- NIPPLE

9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE

CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD

CEMENT TO SURFACE

TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES

STAGE 1: 14807 - 08', 14880 - 81', 14953 - 54', 15026 - 27' (8/12/10) 1/30/18 - swab job: fluid tagged @ 3300'. Recovered 51bbls fluid.

Capillary String Installed STAGE 2: 14518 - 19', 14591 - 92', 14664 - 65', 14737 - 38' (8/16/10) 1/31/18 - swab job: fluid tagged @ 10' pulled from 2000'. Recovered 76bbls fluid.

@ 10,171' STAGE 3: 14229 - 30', 14302 - 03', 14375 - 76', 14448 - 49' (8/16/10) 10/30/17- pump and rods sent to shop. Full bore 2" ball valve installed

STAGE 4: 13940 - 41', 14013 - 14', 14086 - 87', 14159 - 60' (8/16/10) 2/16/17 -Swab Job:put well down line on16/64th choke

STAGE 5: 13651 - 52', 13724 - 25', 13797 - 98', 13870 - 71' (8/16/10) 11/15/16 -Swab Job: Tubing had 1.056 MCF flowrate

STAGE 6: 13362 - 63', 13435 - 36', 13508 - 09', 13581 - 82' (8/17/10) 11/14/16 - Swab Job:Fished Bottom Hole string@9939'

STAGE 7: 13073 - 74', 13146 - 47', 13219 - 20', 13292 - 93' (8/17/10) 10/19/16 -Swab job: Plunger fished after 12th run.

STAGE 8: 12784 - 85', 12857 - 58', 12930 - 31', 13003 - 04' (8/17/10) 10/15/16 - Swab Job

STAGE 9: 12495 - 96', 12568 - 69', 12641 - 42', 12714 - 15' (8/17/10) 8/17/11 - Installed Cap String @ 10,171'

STAGE 10: 12206 - 07', 12279 - 80', 12352 - 53', 12425 - 26' (8/17/10) 8/20/10 - CT Cleanout to 15079'

STAGE 11: 11917 - 18', 11990 - 91', 12063 - 64', 12136 - 37' (8/18/10) 8/10/10 - CT Cleanout to 15,062'

STAGE 12: 11628 - 29', 11701 - 02', 11774 - 75', 11847 - 48' (8/18/10)

STAGE 13: 11339 - 40', 11412 - 13', 11485 - 86', 11558 - 59' (8/18/10)

STAGE 14: 11050 - 51', 11123 - 24', 11196 - 97', 11269 - 70' (8/18/10)

STAGE 15: 10761 - 62', 10834 - 35', 10907 - 08', 10980 - 81' (8/19/10)

PRODUCTION CASING

5-1/2" 16# & 20# SET @ 10,602'

CMT W/ 3141 SX. ETOC @ 3000'

STG 15

@ 10,761' STG 14 STG 13 STG 12 STG 11 STG 10 STG 9 STG 8 STG 7 STG 6 STG 5 STG 4 STG 3 STG 2 STG 1

@ 11,050' @ 11,339' @ 11,628' @ 11,917' @ 12,206' @ 12,495' @ 12,784' @ 13,073' @ 13,362' @ 13,651' @ 13,940' @ 14,229' @ 14,518' @ 14,807'

4-1/2" CSG SET

@ 15,160' (TVD 10,489')

TD @ 15,165'

TVD @ 10,489'

UPDATED: 2/22/2018,MA

D ROSS GU 3H

NORTH MINDEN

RUSK, TXAPI NUMBER: 42-401-35118

2105 FWL, 594 FNL, JB MURRAY SUR A-600

PBTD @ 15,079'

Page 23: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Artificial Lift Strategies

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 23

Understanding Our Job

✓ Optimum Artificial Lift Type

✓ Optimize Gas & Oil Production (with Lowest pwf) @ lowest Capex & Opex for life of the well/field

Challenges:

✓ Several Lift Types ➔ Numerous Choices

✓ Dynamic changes in the Life of the well (& Field)

✓ Application Limitation on every Lift Type

✓ Liquid loading in Gas well (Special Application)

Page 24: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Artificial Lift Strategies

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 24

Understanding Our Job

Tight or Low

Perm Well

Higher Perm

Well

P1

P2

Rate increase as pressure lowered from P1 to P2 for

low perm well

Rate increase as pressure lowered from P1 to P2 for

higher perm well

Compression on tight and higher perm well. There is less production

increase as pressure lowered near AOF on tight well than for higher

perm well.

✓ Close to Absolute Open Flow (AOF)

✓ Steep slope of the IPR curve

✓ (Difficult obtain accurate IPR for a tight fractured gas well – high DT to pseudo steady state Pr (avg).

Page 25: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Unconventional Technology

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 25

Adaption & Application

Page 26: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Unconventional Technology

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 26

Adaption & Application

✓ Cloud Computing and Edge Processors

✓ Internet of Things (IoT)

✓ Artificial Intelligence (AI)

✓ Advanced Robotics

✓ Programmed Drones

✓ Blockchains

Page 27: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Unconventional Technology

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 27

Adaption & Application

Page 28: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Unconventional Technology

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 28

Adaption & Application

Page 29: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Late Life Problem

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 29

Page 30: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 30

Late Life Problem

Going BackTo the Basics

Going Beyond

Conventional

Page 31: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Late Life Problem

2019 Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 31

Unconventional Well Stripper Well

Page 32: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Late Life Problem

2019 Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 32

1

10

100

1,000

10,000

100,000

5/28/05 10/10/06 2/22/08 7/6/09 11/18/10 4/1/12 8/14/13 12/27/14 5/10/16 9/22/17

Gas

(M

CF)

/ C

on

den

sate

(B

BL)

/Mo

nth

Welder A2 Monthly Production History

GW Gas (MCF) Condensate (BBL)

N2 membrane Lift & GL- 4X Production Increase

Page 33: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 33

KEY TAKEAWAY

✓ “Wellbore Fluid Evacuators” are providing cheaper energy option for global consumers

✓ “Lower for Long commodity price” is the new era Beyond Conventional

✓ Unconventional Horizontal Wells will eventually become stripper well (some as early as 3rd year of Production)

✓ Effective cost management for horizontal wells and late life stripper wells is the only winning strategy beyond conventional

✓ Proper application of New Information Technology & New AL Product development will be the most deciding factor toward delivery value

✓ Understand our JOB --------- Wellbore Fluid Evacuators

Page 34: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 34

Page 35: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

Copyright

Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Artificial Lift Strategies for Unconventional Wells Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:

▪ Display the presentation at the Workshop.

▪ Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee.

▪ Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee.

Other use of this presentation is prohibited without the expressed written permission of the author(s). The owner company(ies) and/or author(s) may publish this material in other journals or magazines if they refer to the Artificial Lift Strategies for Unconventional Wells Workshop where it was first presented.

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 35

Page 36: Keynote Address...9-5/8" SET @ 2,230' WL RE-ENTRY GUIDE CMT W/ 575 SX + 100 SX TOP JOB EOT @ 10,161' MD CEMENT TO SURFACE TOC CALC @ 3000' COTTON VALLEY PRODUCTION ZONES STAGE 1: 14807

DisclaimerThe following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Artificial Lift Strategies for Unconventional Wells Web Site.

The Artificial Lift Research and Development Council and its officers and trustees, and the Artificial Lift Strategies for Unconventional Wells Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Artificial Lift Strategies for Unconventional Wells Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained.

The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials.

The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.

2019 | Artificial Lift Strategies for Unconventional Wells Workshop, Oklahoma City, OK Feb. 11 - 14, 2019 | 36